roofy

114 Ridge Street

Manhattan, NY 10002BBL 1-00344-0041Map

Owner of record: 110-114 Ridge Street Ground Owner LLC

114 Ridge Street is an elevator apartment building built in 2003 in Manhattan, 10002. It has 23 residential units across 7 floors. The owner of record is 110-114 Ridge Street Ground Owner LLC. HPD has recorded 30 housing violations here, most recently on September 2, 2026. 7 of the 30 most recent violations are still open.

HPD violations
30
DOB violations
9
ECB violations
6
HPD complaints
38

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 30

  • B

    Repair the roof so that it will not leak above ceiling in the 3rd room from east located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Repair the roof so that it will not leak above ceiling and south wall in the foyer located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the foyer located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Repair the roof so that it will not leak above ceiling, north wall and west wall in the 2nd bathroom from east located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and west wall in the 2nd bathroom from east located at apt 7a, 7th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 7A

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective ...door and frame at compactor closet, 6th story

    May 18, 2025

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west

    Jan 6, 2024 · Apt 3E

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door lock at boiler room

    Jan 6, 2024

    Closed — Violation dismissed
Show 20 more ↓
  • C

    Properly repair or replace the broken or defective mortise lock at vestibule door to public hall , 1st story

    Oct 7, 2023

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective mortise lock at building front entrance door

    Oct 7, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door, roof

    Oct 7, 2023

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective panic bar at bulkhead door, roof

    Oct 7, 2023

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of consisting of boxes, funitures, mirror and house hold items at public hall, 7th story

    Oct 7, 2023

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Oct 7, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items and ladder stored at public hall stairs, 6th story, section ''a''

    Sep 13, 2019

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of exposed decorative i beams at ceiling at public hall, 1st story

    Sep 19, 2018

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of wainscoating at all walls in north section at public hall, 1st story

    Sep 19, 2018

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of wooden wainscoating at ceiling at vestibule , 1st story

    Sep 19, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Oct 5, 2016

    Closed — Violation closed

DOB building violations · 9

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 13, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 13, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 15, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed

ECB violations · 6

  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28302.4 for control #816479.rem:submit required technical report

    May 18, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain bldg exterior walls/facade & appurtenances. noted: @ time of insp: west elevation exp#1: spalling & cracks on stone's cracked bricks also spalling brick. eroded mortar joints on stone's & br

    Apr 11, 2018 · Penalty $625

    Resolve
  • Class - 1

    Permanent dwelling offered for other than permanent-residential purposes. dept of buildings records indicates bldg to be legally approved asa class "a" multiple dwelling. now apt #s 6e and 6d have been converte

    Mar 14, 2018 · Penalty $6,000

    Resolve
  • Class - 1

    Bc907.2.8 failure to provide fire alarm system for transient use. rmdy: discontinue illegal use.

    Mar 14, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide safety measures such as sidewalk shed,fence etc.to protect public from unsafe conditions as per 1rcny 103-04 & as per notification of unsafe conditions complaint#1390160 by ra/pe dated 2/26/1

    Apr 13, 2015 · Penalty $6,000

    Resolve
  • Class - 2

    Failure to maintain bldg. noted: at rear yard of premises,steel fence approx 4'h. u-shape approx 10'l x 30'l has collapsed onto the ground. remedy: repair defects forthwith & maintain bldg.

    Feb 7, 2014 · Penalty $250

    Resolve

Complaints

  • Water leak

    Slow leak

    Jul 22, 2026 · Apt 7A

    Close
  • Appliance

    Electric/gas range

    Jul 22, 2026 · Apt 7A

    Close
  • Electric

    Outlet/switch

    Jul 22, 2026 · Apt 7A

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2025 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2025 · Apt 7D

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 6E

    Close
  • Door/window

    Window frame

    Dec 4, 2024 · Apt 6E

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2024 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2023 · Apt 3E

    Close
Show 28 more ↓
  • Door/window

    Door

    Dec 5, 2023 · Apt 34C

    Close
  • Heat/hot water

    Apartment only

    Nov 28, 2023 · Apt 3E

    Close
  • Door/window

    Door

    Oct 6, 2023 · Apt 3C

    Close
  • General

    Mailbox

    Oct 6, 2023 · Apt 3C

    Close
  • Door/window

    Door

    Sep 25, 2023 · Apt 4C

    Close
  • General

    Mailbox

    Sep 20, 2023 · Apt 3C

    Close
  • Door/window

    Door

    Sep 20, 2023 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2021 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2021 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2021 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2021 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Jun 20, 2019 · Apt 701

    Close
  • Water leak

    Heavy flow

    Jun 20, 2019 · Apt 701

    Close
  • Paint/plaster

    Ceiling

    Jun 20, 2019 · Apt 701

    Close
  • Water leak

    Slow leak

    Jun 20, 2019 · Apt 701

    Close
  • Outside building

    Roofing

    Jun 20, 2019 · Apt 701

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2018 · Apt 3F

    Close
  • General

    Bell/buzzer/intercom

    Sep 17, 2018 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Dec 23, 2016 · Apt 7D

    Close
  • Unsanitary condition

    Mold

    Dec 23, 2016 · Apt 7D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 14, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 3, 2016 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2015 · Apt 4A

    Close
  • Plumbing

    Water supply

    Apr 14, 2015 · Apt 3D

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt 2C

    Close
  • General

    Doors

    Oct 18, 2004 · Apt 0

    Close
  • General

    Doors

    Sep 15, 2004 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 26, 2004 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2003
Floors
7
Residential units
23
Building area
27,109 ft²
Lot area
5,373 ft²
Zoning
R7A
Community board
103
Council district
2
Block / lot
344 / 41
Assessed value
$1,917,450
Landmark / historic district
No

HPD registration #142382, last renewed Aug 31, 2025.

Questions about 114 Ridge Street

Who owns 114 Ridge Street?

The owner of record in NYC Department of City Planning PLUTO data is 110-114 Ridge Street Ground Owner LLC.

Does 114 Ridge Street have violations?

Yes. NYC HPD has recorded 30 housing violations at this property.

Is 114 Ridge Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 114 Ridge Street built?

City records list 2003 as the year it was built.

How many apartments are in 114 Ridge Street?

It has 23 residential units and 27 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.