roofy

830 Howard Avenue

Staten Island, NY 10301BBL 5-00610-7501Map

Owner of record: Highview Condo I

830 Howard Avenue is a condominium built in 1981 in Staten Island, 10301. It has 66 residential units across 6 floors. The owner of record is Highview Condo I. HPD has recorded 26 housing violations here, most recently on March 11, 2026. 4 of the 26 most recent violations are still open.

HPD violations
26
DOB violations
23
ECB violations
5
HPD complaints
23

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Mar 11, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 4h, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 4H

    Open — Invalid certification
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 4h, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 4H

    Open — Invalid certification
  • B

    M/d law abate the nuisance consisting of key operated lock at entrance door to room with fire escape in the 3rd room from east at north located at apt 4h, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 4H

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 4h, 3rd story, 1st apartment from east at south

    Jan 26, 2026 · Apt 4H

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder key operated locking device at building entrance door at basement

    Jan 26, 2026

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing kick down door stopper at vestibule entrance at basement

    Jan 26, 2026

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing kick down door stopper at building entrance at basement

    Jan 26, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective missing at 2nd fire door from north at basement at public hall

    Jan 26, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 3rd fire door from north at basement at public hall

    Jan 26, 2026

    Closed — Violation closed
Show 16 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at west entrance door to fire stairs at basement

    Jan 26, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7f, 6th story, 2nd apartment from west at north

    Mar 9, 2023 · Apt 7F

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7f, 6th story, 2nd apartment from west at north

    Mar 9, 2023 · Apt 7F

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 7f, 6th story, 2nd apartment from west at north

    Mar 9, 2023 · Apt 7F

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Mar 9, 2023

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked to cellar at public hall, 1st story

    Mar 9, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 8, 2022

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of water seepage over all windows 5 sty apt 5b at front. , section '' ''

    Aug 23, 1993 · Apt 5B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings over all windows 5 sty apt 5b at front. , section '' ''

    Aug 23, 1993 · Apt 5B

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of evidence of concealed leak ceiling center room 5 sty apt 5b. , section '' ''

    Aug 23, 1993 · Apt 5B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings over windows 5 sty northeats apt 5b center east & southeast rooms water damaged. , section '' ''

    Nov 6, 1992 · Apt 5B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department wall over east window 5 sty northeast apt 5b northeast room water damaged,. , section '' ''

    Nov 6, 1992 · Apt 5B

    Closed — Violation closed
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department water stained wall at window 5 sty apt 5b south east south west room. , section '' ''

    Apr 3, 1987 · Apt 5B

    Closed — Violation closed
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls 5 sty apt 5b at southwest at window. , section '' ''

    Apr 3, 1987 · Apt 5B

    Closed — Violation closed

DOB building violations · 23

  • Construction other optional

    Structure rendering non-compliant. at unit 7c, there are ceiling cracks and nails punctures at several locations within the condominium. unit 7c is the last floor of the building. upon inspection, building has a permit to do solar panels at roof level (permit # s01101664).

    Dec 12, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 7, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 7, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2015

    Dob violation - resolved
Show 13 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 8, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2010

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 8, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 2001

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to maintain exterior facade and appurtenances.at north elevation,exposure#3 observed deteriorated mortar join and vertical cracked bricks at chimney wall at roof level without protection to the public u

    May 31, 2023

    Resolve
  • Class - 2

    Bc 3314.3.3 drawings. at the time of inspection active job site,facaderepair in progress. i observed c-hook suspended scaffolds installed atexp#3 for facade repair operation. upon request to see design drawings

    Dec 4, 2020 · Penalty $625

    Active
  • Class - 2

    Failure to institute and maintain all safety measures. at the time of inspection active job site,facade repair in progress. i observed inadequate overhead protection at exp#1,2 and 4,and no ohp at exp#3(no cont

    Dec 4, 2020 · Penalty $5,000

    Active
  • Class - 1

    Bc 3314.6.3 lifelines and suspension ropes. at the time of inspection active job site,facade repair in progress. i observed lifelines for workers on suspended scaffold attached to the same anchorage point. in c

    Dec 4, 2020

    Resolve
  • Non-hazardous

    75u,61o,52b,47l,57o,31q,31-q-07 provide covers where missing-car top

    Mar 28, 1998

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt 4H

    Close
  • Paint/plaster

    Ceiling

    Dec 8, 2025 · Apt 7C

    Close
  • Door/window

    Door frame

    Dec 8, 2025 · Apt 7C

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 8, 2022 · Apt 3G

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2020 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2020 · Apt 2K

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2020 · Apt 6F

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2019 · Apt 2D

    Close
Show 13 more ↓
  • Plumbing

    Water supply

    Sep 15, 2019 · Apt 7K

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2018 · Apt 7H

    Close
  • Water leak

    Slow leak

    Feb 19, 2018 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2017 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Oct 26, 2017 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    May 13, 2017 · Apt 1G

    Close
  • Heat/hot water

    Entire building

    May 13, 2017 · Apt BLDG

    Close
  • General

    Ventilation system

    May 11, 2016 · Apt 6G

    Close
  • General

    Mold

    Jan 17, 2012 · Apt 7B

    Close
  • Heating

    Heat related

    Nov 24, 2005 · Apt 5B

    Close
  • Heating

    Heat related

    May 25, 2005 · Apt 5B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (R4)
Year built
1981
Floors
6
Residential units
66
Building area
56,375 ft²
Lot area
24,700 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
610 / 7501
Assessed value
$2,119,941
Landmark / historic district
No

HPD registration #500865, last renewed Jul 16, 2025.

Questions about 830 Howard Avenue

Who owns 830 Howard Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Highview Condo I.

Does 830 Howard Avenue have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 830 Howard Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 830 Howard Avenue built?

City records list 1981 as the year it was built.

How many apartments are in 830 Howard Avenue?

It has 66 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.