45 Avon Place
Staten Island, NY 10301BBL 5-00574-0058Map
Owner of record: 45 Avon Holdings LLC
45 Avon Place is a walk-up apartment building built in 1931 in Staten Island, 10301. It has 18 residential units across 4 floors. The owner of record is 45 Avon Holdings LLC. HPD has recorded 118 housing violations here, most recently on July 14, 2026. 8 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 118
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 243
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 118
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jul 14, 2026 · Apt 1C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jul 14, 2026 · Apt 1C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Jul 13, 2026 · Apt 2C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Jul 13, 2026 · Apt 2C
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Jul 7, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 7, 2026 · Apt 1A
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 9, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Jun 9, 2026 · Apt 2C
Open — Not complied with
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1c, 1st story, 1st apartment from east at south
May 16, 2026 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
May 16, 2026 · Apt 1C
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective masonry stucco at north exterior wall at all stories
May 1, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective masonry stucco at west exterior wall at all stories
May 1, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonry stucco at east exterior wall at 1st and 3rd stories
May 1, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective masonry stucco at south exterior wall at all stories
May 1, 2026
Open — Not complied with - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members and balconies at fire escape at east
May 1, 2026
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members and balconies at fire escape at west
May 1, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the kitchen located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall south wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from north at east located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet door at east wall in the kitchen located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, east wall in the 2nd room from north at east located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, 1st window frame from north at east wall in the 2nd room from north at east located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the foyer located at apt 2c, 2nd story, 1st apartment from east at south
Mar 18, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Feb 14, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 1a, 1st story, 1st apartment from west at north
Feb 14, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor at vestibule at public hall, 1st story
Feb 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective eroded facade stucco at exterior south wall of building front extending between 1st and 4th story
Feb 9, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Jan 10, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door , 1st story
Jan 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 2nd apartment from east at south
Oct 16, 2024 · Apt 3D
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 5th story balcony stack from north at west exterior wall at fire escape
Apr 30, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials around window frame at south wall at public hall stairs, 2nd story
Dec 20, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department around window frame at south wall at public hall stairs, 2nd story
Dec 20, 2023
Closed — Violation dismissed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jul 13, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Jun 18, 2026 · Apt BF
Close - Unsanitary condition
Mold
May 12, 2026 · Apt 1C
Close - Water leak
Heavy flow
Apr 19, 2026 · Apt 1C
Close - Water leak
Heavy flow
Mar 14, 2026 · Apt 2C
Close - Water leak
Heavy flow
Mar 13, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Mar 13, 2026 · Apt 2C
Close
Show 40 more ↓
- Unsanitary condition
Mold
Mar 13, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Mar 3, 2026 · Apt 2C
Close - Water leak
Heavy flow
Mar 3, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Mar 3, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt A1
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Feb 9, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Feb 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Feb 11, 2024 · Apt 3A
Close - Heat/hot water
Entire building
Dec 19, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 19, 2023 · Apt 1C
Close - Door/window
Door
Dec 19, 2023 · Apt 1C
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Electric
Power outage
Feb 8, 2023 · Apt 1C
Close - Heat/hot water
Entire building
Feb 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2022 · Apt BLDG
Close - Electric
Power outage
Nov 6, 2022 · Apt 1C
Close - Heat/hot water
Entire building
Jan 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt BLDG
Close - Electric
Outlet/switch
Dec 22, 2021 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 18
- Building area
- 9,000 ft²
- Lot area
- 5,040 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 574 / 58
- Assessed value
- $481,500
- Landmark / historic district
- No
HPD registration #500488, last renewed Jun 23, 2026.
Questions about 45 Avon Place
Who owns 45 Avon Place?
The owner of record in NYC Department of City Planning PLUTO data is 45 Avon Holdings LLC.
Does 45 Avon Place have violations?
Yes. NYC HPD has recorded 118 housing violations at this property.
Is 45 Avon Place rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 100% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 45 Avon Place built?
City records list 1931 as the year it was built.
How many apartments are in 45 Avon Place?
It has 18 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.