40 Prospect Street
Staten Island, NY 10304BBL 5-00491-0011Map
Owner of record: NYC Housing Development Corp.
40 Prospect Street is an elevator apartment building built in 2011 in Staten Island, 10304. It has 92 residential units across 6 floors. The owner of record is NYC Housing Development Corp.. HPD has recorded 63 housing violations here, most recently on September 29, 2026. 16 of the 50 most recent violations are still open. City tax records listed 92 rent-stabilized apartments here in 2024.
- HPD violations
- 63
- DOB violations
- 21
- ECB violations
- 4
- HPD complaints
- 66
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2o, 2nd story, 4th apartment from south at west , section ''west''
Sep 29, 2026 · Apt 2O
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the missing stopper at wash basin in the bathroom located at apt 2o, 2nd story, 4th apartment from south at west
Jul 29, 2026 · Apt 2O
Open — Civ14 mailed - BHazardous
Replace with new the missing safety plastic covers on electrical outlets at all walls at public hall, 2nd story
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2o, 2nd story, 4th apartment from south at west
Jul 29, 2026 · Apt 2O
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2o, 2nd story, 4th apartment from south at west
Jul 29, 2026 · Apt 2O
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 2nd story
Jul 29, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at hopper door inside compactor closet at public hall, 2nd story
Jul 29, 2026
Closed — Violation closed - BHazardous
Replace with new the missing safety plastic covers on electrical outlets at east and west walls at public hall, 1st story
Jul 29, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door leading to west section at public hall, 1st story
Jul 29, 2026
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5f, 5th story, 3rd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5F
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the foyer located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the foyer located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base under sink cabinet in the kitchen located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5f, 5th story, 3rd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north south wall in the kitchen located at apt 5f, 5th story, 3rd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5f, 5th story, 3rd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 5f, 5th story, 3rd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood door at entrance at north in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north , section ''north''
Oct 10, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 4b, 4th story, 3rd apartment from south at west , section ''south''
Feb 24, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 4b, 4th story, 3rd apartment from south at west , section ''south''
Feb 24, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4b, 4th story, 3rd apartment from south at west , section ''south''
Feb 24, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4b, 4th story, 3rd apartment from south at west , section ''south''
Feb 24, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door (stairway a) at public hall, 5th story
May 2, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door (stairway c) at public hall, 4th story
May 2, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 3rd story
May 2, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at south wall at public hall, 5th story
Jan 2, 2024
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt 2m, 2nd story, 2nd apartment from west at north
Aug 31, 2023 · Apt 2M
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective wire glass on fire door at stairwell c , 5th story, section ''east''
Dec 21, 2022
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at north wall in the 3rd room from east located at apt 4r, 4th story, 1st apartment from west at north
Jun 17, 2021 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2k, 2nd story, 4th apartment from west at north
Jun 17, 2021 · Apt 2K
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 8, 2020
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 1st room from east at north located at apt 3f, 3rd story, 3rd apartment from west at north
Mar 3, 2020 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; located at apt 3f, 3rd story, 3rd apartment from west at north
Mar 3, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3f, 3rd story, 3rd apartment from west at north
Mar 3, 2020 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east at north located at apt 3f, 3rd story, 3rd apartment from west at north
Mar 3, 2020 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 3f, 3rd story, 3rd apartment from west at north
Mar 3, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen located at apt 2s, 2nd story, 3rd apartment from north at east
Oct 11, 2019 · Apt 2S
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 2s, 2nd story, 3rd apartment from north at east
Oct 11, 2019 · Apt 2S
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall inside closet in the private hallway located at apt 2s, 2nd story, 3rd apartment from north at east
Oct 11, 2019 · Apt 2S
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north & east walls in the bathroom located at apt 4t, 4th story, 2nd apartment from north at east
Aug 23, 2019 · Apt 4T
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective closet door in the foyer located at apt 3l, 3rd story, 2nd apartment from south at west
Jun 24, 2019 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings in the entire apartment located at apt 4u, 4th story, 1st apartment from west at north
Oct 6, 2016 · Apt 4U
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 6c, 6th story, 2nd apartment from south at west
Sep 12, 2016 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the lower west wall in the 2nd room from north at west located at apt 6c, 6th story, 2nd apartment from south at west
Sep 12, 2016 · Apt 6C
Closed — Violation dismissed
DOB building violations · 21
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
Show 11 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 19, 2010
Dob violation - dismissed
ECB violations · 4
- Class - 1
Use of supported scaffold w/o a scaffold user certificate. noted: at time of inspection at active job site, at front entry to job site, 2 workers on supported scaffolding (approx: 12' high) in progress of
Oct 19, 2011 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.8 guard rail and toe board: failure to provide guard rails and toe boards on supported scaffolding. noted: at time of inspection at active job site observed 2 workers on supported scaffolding @ front
Oct 19, 2011 · Penalty $400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at active job site observed accumulations of construction debris at various locations of site, creating unsafe,
Oct 19, 2011 · Penalty $400
Resolve - Class - 1
Use off supported scaffold w/o a scaffold user cert. noted: at time ofinspection at active job site, observed workers on supported scaffolding at courtyard location, working on exterior facade walls and upon
Sep 21, 2011 · Penalty $1,600
Resolve
Complaints
- Unsanitary condition
Pests
Sep 27, 2026 · Apt 2O
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt 2O
Close - Unsanitary condition
Garbage/recycling storage
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 5P
Close - Water leak
Slow leak
Oct 1, 2025 · Apt 5G
Close - Paint/plaster
Ceiling
Oct 1, 2025 · Apt 5G
Close - Plumbing
Basin/sink
Oct 1, 2025 · Apt 5G
Close - Water leak
Heavy flow
Sep 22, 2025 · Apt 5F
Close - Paint/plaster
Ceiling
Sep 22, 2025 · Apt 5F
Close - Unsanitary condition
Mold
Feb 18, 2025 · Apt 4B
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Feb 10, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2N
Close - Unsanitary condition
Mold
Nov 27, 2023 · Apt 5Q
Close - General
Bell/buzzer/intercom
Sep 11, 2023 · Apt 2S
Close - Electric
Wiring
Jun 23, 2023 · Apt 2S3S
Close - Electric
Wiring
Oct 1, 2022 · Apt 2S
Close - Electric
Wiring
May 2, 2022 · Apt 2S
Close - Electric
Wiring
Jan 7, 2022 · Apt 2S
Close - Door/window
Door
Dec 13, 2021 · Apt 2S
Close - Electric
Outlet/switch
Dec 13, 2021 · Apt 2S
Close - Electric
Wiring
Dec 13, 2021 · Apt 2S
Close - Plumbing
Water supply
Oct 3, 2019 · Apt 2S
Close - Paint/plaster
Wall
Oct 3, 2019 · Apt 2S
Close - Paint/plaster
Ceiling
Oct 3, 2019 · Apt 2S
Close - Paint/plaster
Wall
Oct 3, 2019 · Apt 2S
Close - Paint/plaster
Ceiling
Oct 3, 2019 · Apt 2S
Close - Water leak
Slow leak
Aug 22, 2019 · Apt 4T
Close - Door/window
Door
Jun 12, 2019 · Apt 3L
Close - Safety
Smoke detector
Jun 12, 2019 · Apt 3L
Close - Unsanitary condition
Garbage/recycling storage
Aug 7, 2018 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 12, 2017 · Apt 1
Close - Electric
No lighting
Oct 1, 2016 · Apt 2F
Close - Electric
Outlet/switch
Oct 1, 2016 · Apt 2F
Close - Safety
Sprinkler
Oct 1, 2016 · Apt 2F
Close - Unsanitary condition
Pests
Sep 12, 2016 · Apt 6C
Close - Plumbing
Toilet
Aug 4, 2016 · Apt 2N
Close - Plumbing
Basin/sink
Jul 20, 2016 · Apt 3G
Close - Paint/plaster
Wall
Jul 20, 2016 · Apt 3G
Close - Plumbing
Toilet
Jul 20, 2016 · Apt 2H
Close - Plumbing
Toilet
Jul 20, 2016 · Apt 3G
Close - Safety
Sprinkler
Jul 20, 2016 · Apt 2H
Close - Unsanitary condition
Pests
Jul 20, 2016 · Apt 3G
Close - General
Mold
Jan 7, 2014 · Apt 3G
Close - Paint/plaster
Wall
Jan 7, 2014 · Apt 3G
Close - Heating
Heat related
Jan 7, 2014 · Apt 3G
Close - General
Ventilation system
Jan 7, 2014 · Apt 3G
Close - General
Ventilation system
Jan 7, 2014 · Apt 3G
Close - Plumbing
Water-leaks
Jan 7, 2014 · Apt 3G
Close - Paint/plaster
Wall
Jan 7, 2014 · Apt 3G
Close - General
Floor
Jan 7, 2014 · Apt 3G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2011
- Floors
- 6
- Residential units
- 92
- Building area
- 100,670 ft²
- Lot area
- 50,545 ft²
- Zoning
- C4-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 491 / 11
- Assessed value
- $3,577,950
- Landmark / historic district
- No
HPD registration #501422, last renewed Oct 8, 2025.
Questions about 40 Prospect Street
Who owns 40 Prospect Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Development Corp..
Does 40 Prospect Street have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 40 Prospect Street rent stabilized?
NYC Department of Finance tax bills listed 92 rent-stabilized units here in 2024 (about 100% of its 92 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 40 Prospect Street built?
City records list 2011 as the year it was built.
How many apartments are in 40 Prospect Street?
It has 92 residential units and 93 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.