roofy

Navy Pier Court

Staten Island, NY 10304BBL 5-00487-7501Map

Owner of record: Unavailable Owner

Navy Pier Court is a condominium built in 2014 in Staten Island, 10304. It has 467 residential units across 5 floors. The owner of record is Unavailable Owner. HPD has recorded 39 housing violations here, most recently on September 25, 2026. 8 of the 39 most recent violations are still open. City tax records listed 467 rent-stabilized apartments here in 2024.

HPD violations
39
DOB violations
12
ECB violations
50
HPD complaints
133

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
467
About 100% of the building's 467 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 39

  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1104, 1st story, 1st apartment from south at west

    Sep 25, 2026 · Apt 1104

    Open — Nov certified on time
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2010, 2nd story, 10th apartment from south at west

    Sep 23, 2026 · Apt 2010

    Open — Civ14 mailed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 26, 2026

    Open — Nov certified on time
  • A

    Properly repair or replace the broken or defective air vent at ceiling in the bathroom located at apt 2010, 2nd story, 7th apartment from south at west , section ''west''

    Aug 26, 2026 · Apt 2010

    Open — Civ14 mailed
  • B

    Remove all obstructions and repair all defects in the shower stall in the bathroom located at apt 2010, 2nd story, 7th apartment from south at west , section ''west''

    Aug 26, 2026 · Apt 2010

    Open — Civ14 mailed
  • A

    Replace with new the missing safety caps at electrical outlet at west and east walls at public hall at east , 2nd story

    Aug 20, 2026

    Open — Nov certified on time
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 20, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2010, 2nd story, 10th apartment from south at west

    Aug 5, 2026 · Apt 2010

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of household items inside compactor closet at public hall, 3rd story, section ''3093-3095''

    Aug 25, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 4th story, section ''4093-4095''

    Aug 25, 2025

    Closed — Violation closed
Show 29 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 3rd story

    Jul 25, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3095, 3rd story, 2nd apartment from north at east

    Feb 9, 2025 · Apt 3095

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1046, 1st story, 8th apartment from east at south

    Nov 8, 2024 · Apt 1046

    Closed — Violation dismissed
  • B

    Provide a proper means of lighting for water closet compartment at ceiling in the bathroom located at apt 1046, 1st story, 8th apartment from east at south

    Nov 8, 2024 · Apt 1046

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass shower door in the bathroom located at apt 1046, 1st story, 8th apartment from east at south

    Nov 8, 2024 · Apt 1046

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wash line at bathtub in the bathroom located at apt 3095, 3rd story, 2nd apartment from west at north

    Jun 7, 2024 · Apt 3095

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceiling at compactor closet, 1st story, section ''west''

    Sep 14, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 5th story, section ''north''

    Sep 14, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing stopper at door leading to section west at public hall, 1st story

    Sep 14, 2023

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3093, 3rd story, 1st apartment from east at south

    Aug 18, 2023 · Apt 3093

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at compactor hopper at public hall, 3rd story

    Apr 24, 2023

    Closed — Violation closed
  • B

    Remove the illegal fastening key operated lock at public hall bulkhead door at roof, stair e.

    Apr 24, 2023

    Closed — Violation closed
  • B

    Remove the illegal fastening key operated lock at public hall bulkhead door at roof, stair f

    Apr 24, 2023

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective door check at public hall bulkhead door at roof, stair f.

    Apr 24, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective public hall bulkhead at roof, stair f.

    Apr 24, 2023

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (frame missing) at public hall, 1st story

    Mar 29, 2023

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 2 sq.ft. at ceiling and south wall in the 3rd room from north located at apt 2057, 2nd story, 8th apartment from east at south

    Oct 8, 2021 · Apt 2057

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2057, 2nd story, 8th apartment from east at south

    Oct 8, 2021 · Apt 2057

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ...no proper frame on the wall at public hall, 1st story

    Sep 19, 2020

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling and east wall approx 2 sq.ft in the bathroom located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... ceiling in the closet ( approx 2 sq.ft) in the foyer located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak the celing in the closet in the foyer located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the closet in the foyer located at apt 2012, 2nd story, 9th apartment from south at west

    Mar 4, 2020 · Apt 2012

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 26, 2018

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... ceiling and east wall approx 5 sq.ft in the 1st room from east located at apt 2057, 2nd story, 9th apartment from north at east

    Aug 20, 2018 · Apt 2057

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 30, 2016

    Closed — Violation dismissed

DOB building violations · 12

  • Construction other optional

    Submission of construction documents. occupied parking structure @ lvl large segment of solid concrete protruding from the overhead slab. no vertical section of column is provided. no shoring in place. remedy: provide original full set of structural drawings. provide engineers report on capital w/o base. provide shoring/safety meas u/p.e. directi

    Mar 1, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2019

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
Show 2 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - dismissed

ECB violations · 50

  • Class - 2

    Replace worn gibs where needed. (2.11.11.5.7). inoperative car phone. (2.27.1.1.3). maintenance log not up to date (8.6.1.4). adjust hoistway door access hole at top landing.(2.12.6.)

    May 11, 2026 · Penalty $625

    Resolve
  • Class - 2

    Replace worn gibs where needed. (2.11.11.5.7). inoperative car phone. (2.27.1.1.3). maintenance log not up to date (8.6.1.4). missing sign indicating location of controller room (fdny). bottom landing is an ill

    May 11, 2026 · Penalty $625

    Resolve
  • Class - 2

    Failurr to comply w/comm's order contained in summ/vio#35315150k isued on 5/2/18 and to file a cofc pursuant ot 28-201.1 and 1rcny 102-01.coofc disapproved on 6/13/18.rem:compky w/comm's order and.or file a cof

    Jun 28, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. at 1st floor rear of commercial space identified as "urby eats", doors arked as exit leading to courtyard can only be opened with an electronic key card device

    May 2, 2018 · Penalty $625

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approved amendments. premises under alt2# 520309274. loc note: @ time of insp plans indicate 1 fryer gas filed found additional 3 fryers in kitchen.

    Dec 20, 2017

    Resolve
  • Class - 1

    Failure to have site safety manager or coordinator present as required. noted: @ time of insp observed, active job site. work being performed on friday w/o site safety manager present @ site as required by this

    Jul 1, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    No guardrail/inadequate guardrails.noted:inadequate guardrails system on 2nd floor(northside)-loose cables,top cable held up by another cable hang from ceiling.loose materials stored next to guardrail.remedy:pr

    Mar 7, 2016 · Penalty $6,000

    Resolve
  • Class - 1

    Bc3301.2 27-1009(a)holes/openings not covered.noted:observed openings not covered around stairwell(over 4 inches wide)on second floor-workers on 2nd floor and 1st floor,loose material stored on the second floor

    Mar 7, 2016 · Penalty $2,000

    Resolve
  • Class - 1

    3303.4.5.1 materials at the edge of the building when not being used within 10 feet from the perimeter of the building.noted:loose pipes,forms,plywood stored within 10 feet to the edge of the building on 2nd fl

    Mar 7, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Work contrary to after hours variance permit-upon inspection,construction work in progress. at time of inspection 7:45am noted many workers of various trade at site ongaged in different construction activity.

    Nov 21, 2015 · Penalty $400

    Resolve
Show 40 more ↓
  • Class - 1

    Sec. 3301.7 design drawing required. noticed at time of inspection tie off safety straps installed at exp#1 for workers to tie life lines to tie of straps toed onto (truss) supports. no design on site for tie

    Nov 17, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Contrary to plans. noticed at time of inspection nb in progress. noticed at exp#2 registered nyc motor vehicle parked on site. site safety plan does not showed registered parked cars parked on site to be allowe

    Nov 17, 2015

    Resolve
  • Class - 1

    Failure to maintain housekeeping. at time of inspection noticed workers working on 1st fl. noticed housekeeping inadequate. piles of sheetrock & debris blocking hallways & egress. remedy: stop all work on 1st

    Nov 17, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3307.3 no overhead protection. during inspection noticed at the 1st fl entrances of bldg 7b no overhand protection provided. workers working above on exterior & interior causing hazardous condition ofr wor

    Nov 17, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3308.3 failure to maintain adequate vertical safety netting. at time of inspection observed,active job site. vertical safety netting is not maintained on floors 2 through 5. the netting is loose & lifted &

    Oct 7, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3301.2 holes & openings not covered. at time of inspection observed,active job site. holes found in various locations on floors 2 through 5 are not covered,putting workers on site at risk of being struck

    Oct 7, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping. at time of inspection observed,active job site. debris found not cleaned from site on all floors debris must be removed from site daily. the site safety manager states

    Oct 7, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at time of inspection observed,active job site workers are found on all floors not wearing a hard hat. this is putting the worker

    Oct 7, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at time of inspection observed,active job site. a worker was using a lull(fork lift),to hoist a man lift(scissor lift)onto a deck

    Oct 7, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 28-105.1 work w/o a permit,after hours variance. at time of inspection observed,active jobsite. workers found on site,w/no after hours variance permit to work on saturday obtained or found a dob files. all

    Aug 1, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Sec. 3308.3 vertical safety netting not as per code inadequate. at time of inspection observed,active job site. vertical safety netting is found inadequate in various locations throughout the bldg,putting worke

    Aug 1, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to have site safety manager present at site. at time of inspection observed,active job site. work being performed on saturday w/no site safety manager present at site as required by this section of code

    Aug 1, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at time of inspection observed,active jobsite guardrail(cable system)& vertical safety netting is found in adequate on the 5th fl

    Aug 1, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    No handrails noted:missing handrails between fls @stairs n b under const,workers through out the bldg.rem:provide handrails.

    Jul 23, 2015 · Penalty $5,000

    Resolve
  • Class - 1

    Material @ the edge of the bldg when not being used w/in 10ft from perimeter of the bldg.noted material (loose pipes,studs,sheetrock & garbage)being placed w/in 10ft from perimeter of the bldg on fls 2 to 5.per

    Jul 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Use of supported scaffold w/o a scaffold w/o a scaffold user cert.2 workers (sheetrockers) on baker scaffold both didnt have a scaffold usercert.rem discontinue activity or obtain a support scaffold user cert

    Jul 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to comply w/ nyc fire code.no fire watch,fire guard.noted 2 different occasions,1.pipes are being cut,sparks flying all over.2.worker up on a frame ladder cutting metal,sparks flying all over.no fire gu

    Jul 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.noted 5 story bldg under construction-topped off.different trades on site-construction debri,workers left over lunches/breakfast garbage throug

    Jul 23, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    No toe boards/inadequate toe boards/zero cable.noted inadequate zero cable in areas where window frames not installed-few inches off the deck through out the bldg.loose debri & inadequate vertical safety nettin

    Jul 23, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Fire extinguisher as per fire code.noted few fire extinguishers on some fls need to be recharged/replaced also workers while cutting metal (2 different occasions) do not have fire extinguisher that work w/ them

    Jul 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3308.3 vertical safety netting not per code,damaged &/or inadequate.noted bldg under construction-topped off interior work in progress (framing,sheetrock,plumbing)cut in places & loose in place throughout the

    Jul 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    No guard rails/inadequate cable system.noted inadequate cable system-top cable is loose (lower than required)-deck is 6-8 inches short to cable system.there is a gap due to incorrect set up of guardrail,between

    Jul 23, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.noted big pile of electrical wires (bx type,heavy duty)on 2nd fl & 1st fl hallway.different trades on site working throughout-wire

    Jul 23, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. attime of my inspection at the above mentioned address i observed an ac tive nb in progress. the general housekeeping on the 4th and 5th floor

    Jun 18, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3308.3 vertical safety netting not per code, damaged or inadequate at time of my inspection at the above mentioned address i observed an active nb in progress. the vertical safety netting is inadequate in

    Jun 18, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Bc3301.1.2 firecode construction or demolition operations shall also be conducted in conformance with nyc fire code- at time of my inspection at the above mentioned address i observed an active nb in progress.

    Jun 18, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected b construction operations.sent to job site for inc #19538.working installing spring on fireproofing was working on the 2nd floor near the perimeter of the

    May 11, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3308.3vertical safety netting not per code damaged or inadequate @ time of insp @ an active nb in progress the mentioned address i observed the 1st floor thru the 5th fl is inadequate along all exposures,net

    May 11, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Bc3303.4.5.1 materials at the edge of the building when not being used within 10 ft from the perimeter of the bldg(5 ft for areas less than 1000 sq ft) at time of insp @the above mentioned address i observed an

    May 11, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3303.11 required means of egress shall be maintained at all times during construction.at time of inspection at the above mentioned addressi observed an active nb in progress.the means of ingress/egress from

    May 11, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping as per code requirements. attime of inspection observed,active jobsite. no adequate housekeeping has been provided as required by this section of code. debris found on

    Mar 17, 2015 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3308.3 vertical safety netting not as per code,damaged or inadequate. at time of inspection observed,active jobsite. vertical safety netting found not maintained & not adequate on all floors throughout the

    Mar 17, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Work after hours w/o variance permit-upon inpection,noted about 25 workers on site,installing metal studs,framing partitions as per dob record,no permit obtained for working after hours.rem:stop all after hours

    Jan 24, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to have site safety manager present @ site-upon inspection,jobsite is open about 25 workers on site installing partitions.@ time of insp.noted @ this active job site no site safety manager present as re

    Jan 24, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain vertical safety netting as per code upon inspection observed construction work in progress @ time of inspection noted the vertical safety netting installed in the bldg is not in compliance w

    Nov 24, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard.noticed @ time of insp nb in progress form work & concrete work ongping rebars missing caps.rem:safeguard all persons & property & provide rebar laps

    Jul 25, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    3303.1.3 non-fire-retardant plywood used for shed.note:approx 30'x8' shed made of ordinary plywood has been erected @site near exp #1.instead of using fire retardant material,ordinary plywood used for shed. rem

    Mar 26, 2014 · Penalty $400

    Resolve
  • Class - 1

    3306.9.3 dust control.note:large area excavated;very large pile of dirt & excavated materials stored.no dust control measures avail @site.under windy condition huge cloud of dust creating hazardous condition. r

    Mar 26, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3310.3 no site safety plan and site safety program - upon inspectionconstruction work of major bldg commenced,excavation for foundation inprogress.at time of inspection,no site safety plan and site safety pro

    Nov 29, 2013 · Penalty $400

    Resolve
  • Class - 1

    Work does not conform to approved construction document.upon inspection,construction work of the bldg commenced,excavation for foundation work in progress.at time of inspection noted,chain link fence erected

    Jan 29, 2013 · Penalty $400

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 23, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Sewage

    Sep 23, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2026 · Apt 2010

    Close
  • Flooring/stairs

    Floor

    Sep 8, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Pests

    Sep 8, 2026 · Apt 2010

    Close
  • Plumbing

    Basin/sink

    Sep 8, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Pests

    Sep 8, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Sewage

    Sep 8, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Mold

    Aug 20, 2026 · Apt 2010

    Close
Show 40 more ↓
  • General

    Ventilation system

    Aug 20, 2026 · Apt 2010

    Close
  • Door/window

    Door

    Aug 20, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Mold

    Aug 3, 2026 · Apt 2010

    Close
  • Unsanitary condition

    Mold

    Jul 13, 2026 · Apt 2010

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2025 · Apt 2108

    Close
  • Plumbing

    Bathtub/shower

    Sep 1, 2025 · Apt 2027

    Close
  • Unsanitary condition

    Pests

    Sep 1, 2025 · Apt 2027

    Close
  • Unsanitary condition

    Mold

    Aug 18, 2025 · Apt 3095

    Close
  • Plumbing

    Sewer

    Aug 18, 2025 · Apt 3095

    Close
  • Unsanitary condition

    Sewage

    Aug 18, 2025 · Apt 3095

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 30, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Sewage

    Jul 19, 2025 · Apt 3095

    Close
  • Door/window

    Door

    May 18, 2025 · Apt 3095

    Close
  • Paint/plaster

    Wall

    Dec 23, 2024 · Apt 3095

    Close
  • Paint/plaster

    Wall

    Nov 23, 2024 · Apt 3095

    Close
  • Water leak

    Slow leak

    Oct 25, 2024 · Apt 1046

    Close
  • Electric

    No lighting

    Oct 25, 2024 · Apt 1046

    Close
  • Plumbing

    Basin/sink

    Oct 25, 2024 · Apt 1046

    Close
  • Unsanitary condition

    Mold

    Oct 25, 2024 · Apt 1046

    Close
  • Door/window

    Door

    Oct 25, 2024 · Apt 1046

    Close
  • Door/window

    Door

    Oct 23, 2024 · Apt 3095

    Close
  • General

    Bell/buzzer/intercom

    Oct 18, 2024 · Apt 3095

    Close
  • Door/window

    Door

    Oct 18, 2024 · Apt 3095

    Close
  • Door/window

    Door frame

    Oct 18, 2024 · Apt 3095

    Close
  • Paint/plaster

    Ceiling

    Oct 18, 2024 · Apt 3095

    Close
  • Paint/plaster

    Wall

    Oct 18, 2024 · Apt 3095

    Close
  • Heat/hot water

    Apartment only

    Oct 6, 2024 · Apt 2027

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 2, 2024 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Oct 2, 2024 · Apt 1057

    Close
  • Water leak

    Heavy flow

    Oct 2, 2024 · Apt 1057

    Close
  • Plumbing

    Water supply

    Oct 2, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Aug 27, 2024 · Apt 3095

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 27, 2024 · Apt 3095

    Close
  • Door/window

    Door

    Aug 11, 2024 · Apt 3095

    Close
  • Water leak

    Heavy flow

    Aug 11, 2024 · Apt 3095

    Close
  • Unsanitary condition

    Mold

    Aug 11, 2024 · Apt 3095

    Close
  • Unsanitary condition

    Mold

    Aug 9, 2024 · Apt BUILDI

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 14, 2024 · Apt 3095

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2014
Floors
5
Residential units
467
Building area
338,858 ft²
Lot area
136,822 ft²
Zoning
C4-2A
Community board
501
Council district
49
Block / lot
487 / 7501
Assessed value
$22,204,800
Landmark / historic district
No

HPD registration #501693, last renewed Jul 23, 2026.

Questions about Navy Pier Court

Who owns Navy Pier Court?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does Navy Pier Court have violations?

Yes. NYC HPD has recorded 39 housing violations at this property.

Is Navy Pier Court rent stabilized?

NYC Department of Finance tax bills listed 467 rent-stabilized units here in 2024 (about 100% of its 467 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was Navy Pier Court built?

City records list 2014 as the year it was built.

How many apartments are in Navy Pier Court?

It has 467 residential units and 469 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.