30 Daniel Low Terrace
Staten Island, NY 10301BBL 5-00028-0077Map
Owner of record: Danway Realty LLC
30 Daniel Low Terrace is an elevator apartment building built in 1932 in Staten Island, 10301. It has 103 residential units across 5 floors. The owner of record is Danway Realty LLC. HPD has recorded 288 housing violations here, most recently on July 9, 2026. 2 of the 50 most recent violations are still open. City tax records listed 102 rent-stabilized apartments here in 2024.
- HPD violations
- 288
- DOB violations
- 65
- ECB violations
- 24
- HPD complaints
- 583
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 288
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building entrance
Jul 9, 2026
Closed — Violation closed - BHazardous
Refit 2nd fire door leading to north section at public hall, 3rd story, section ''north''
Jun 12, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1d, 1st story, 4th apartment from north at east
Apr 13, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 4th apartment from north at east
Apr 13, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 4th apartment from north at east
Apr 13, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3p, 3rd story, 2nd apartment from west at north , section ''north''
Apr 10, 2026 · Apt 3P
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3p, 3rd story, 2nd apartment from west at north , section ''north''
Apr 10, 2026 · Apt 3P
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Feb 25, 2026
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2l, 2nd story, 2nd apartment from north at east
Feb 9, 2026 · Apt 2L
Closed — Violation closed
Show 40 more ↓
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4c, 4th story, 3rd apartment from east at south
Feb 9, 2026 · Apt 4C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6b, 6th story, 1st apartment from south at west
Feb 9, 2026 · Apt 6B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6t, 6th story, 3rd apartment from south at west
Feb 9, 2026 · Apt 6T
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3n, 3rd story, 3rd apartment from west at north
Feb 9, 2026 · Apt 3N
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2g, 2nd story, 5th apartment from north at east
Feb 9, 2026 · Apt 2G
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1n, 1st story, 4th apartment from south at west
Feb 9, 2026 · Apt 1N
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1e, 1st story, 3rd apartment from south at west
Feb 9, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1a, 1st story, 2nd apartment from south at west
Feb 9, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2n, 2nd story, 3rd apartment from west at north
Dec 11, 2025 · Apt 2N
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4s, 4th story, 4th apartment from south at west
Dec 11, 2025 · Apt 4S
Closed — Violation closed - ANon-hazardous
Replace with new the missing safety plastic covers on electrical outlets at west, east and north walls at public hall, 1st story
Dec 11, 2025
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6d, 6th story, 2nd apartment from east at south
Dec 11, 2025 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 5th story, section ''south''
Dec 11, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story, section ''south''
Dec 11, 2025
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6a, 6th story, 2nd apartment from south at west
Dec 11, 2025 · Apt 6A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Dec 11, 2025 · Apt 3D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3e, 3rd story, 1st apartment from east at south
Dec 11, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 2nd story, 1st apartment from south at west
Dec 11, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2m, 2nd story, 1st apartment from north at east
Dec 11, 2025 · Apt 2M
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5h, 5th story, 4th apartment from west at north
Dec 11, 2025 · Apt 5H
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4r, 4th story, 1st apartment from west at north
Dec 11, 2025 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob at radiator at south wall in the 1st room from east located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 3rd story, 1st apartment from east at south
Nov 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 3rd story balcony 1st fire escape from south at building front
Nov 5, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protruding beyond window sill on 3rd story balcony 2nd stack from west at south exterior wall
Oct 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 3rd story balcony 1st stack from south at building front
Oct 28, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 5th story balcony stack from east at north exterior wall
Oct 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Oct 8, 2025
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Oct 8, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 3g, 3rd story, 1st apartment from north at east , section ''south''
May 27, 2025 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate on top and bottom at riser pipe in the bathroom located at apt 3g, 3rd story, 1st apartment from north at east , section ''south''
May 27, 2025 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3g, 3rd story, 1st apartment from north at east , section ''south''
May 27, 2025 · Apt 3G
Closed — Violation dismissed
DOB building violations · 65
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - dismissed - Construction other optional
.emergency work order due to severly bulging masonry at all exposure cracked/spalling terracotta at exposure 1 (east)and cracked masonry at exposure#2 (south)&exposure#4 (north).remedy:make immediate repairs under superv.of lic.prof.also remove/secure any loose materials.immed provide shed@expo#1/2/4 and controoed access at expo#3 (west elev.)
Mar 13, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Immediately install a sidewalk shed at: exposure 1 (east) 200.0 lf, exposure 2 ( south) 100.0 lf , exposure 4 (north) 100.0 lf
Aug 9, 2021
Dob violation - dismissed - Construction other optional
Partial vacate order. observed on 08/06/2021 by facade inspector there is bulging masonry at exposure #3(west)parapets. partially vacate exposure#3(west)courtyard. vacate area only to be used as emergency egress. remedy: vacate exposure #3(west)courtyard
Aug 6, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2020
Dob violation - resolved
Show 40 more ↓
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2007
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2004
Dob violation - resolved
ECB violations · 24
- Class - 2
Failure tp maintain building exterior wall(s) or appurtenances. note:-at the time of inspection observed(1) at expo. #1 east elevation cracked terra cotta on the third floor level, (2)at expo. #3 west elevation
Apr 26, 2024
Resolve - Class - 1
Failure to mainatin exterior building facade and appurtenances. observed at exposure 1(east) bulging masonary at parapet and first floor, cracked terra cotta or third floor, and two broken cellar windows and se
Mar 13, 2024
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. dob records indicates full swo was issued on 11/15/2022 for work in progress by (3) workers at exterior facades under expired permit# s00622418-i1
Mar 6, 2023 · Penalty $5,000
Resolve - Class - 1
Work without a permit, 28-301.1, atoi, on a 6-story, 103-family building, observed 3 workers are working on repairing the front facade, a suspended scaffold in duty, however the job permit # s00622418-i1-gc (in
Nov 15, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in a code-compliant manner, 28-301: atoi, observed on a 6-story building (103 apartments) many old metal doors, empty containers, and other metal & wood debris are stacked in the fi
Nov 15, 2022
Resolve - Class - 2
Boiler leaking, missing rear door sight glass, sail switch is bypassed,missing pull chains on relief valves, discharge pipe on low water cutoff needs to be six inches from floor
Nov 4, 2022 · Penalty $625
Resolve - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#811871. remedy:submit acceptable requir
Oct 19, 2022 · Penalty $3,125
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.at eastelevation exposure#1 observed bulging masonry at parapet wall cracked terra cotta at 3rd floor.at south elevation exposure#2 observed bulgin
Sep 16, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway note previous ecb #35577905z required the woner to all obstructions from the fir escapes at the time of my insepction on 08-06-2021 observed the fire escapes at t
Aug 6, 2021 · Penalty $1,563
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances observed at exposure #1(east ) bulging masonry at parapet cracked terra cotta at 3rd floor 2) exposure #1 (south) bulging masonry at parapet 3) exp
Aug 6, 2021 · Penalty $2,500
Resolve
Show 14 more ↓
- Class - 1
Failure to provide unobstructed exit passageway.at south elevation exp2 observed flower pots obstructing fire escape at 2nd floor west side.remedy:remove egress obstruction.
Jun 30, 2021 · Penalty $312
Resolve - Class - 2
Failure to submit acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #811871.agg1:prior nov 37013342n under 28-
Jun 1, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain exterior facade and appurtenances. (1)at west elevation,exposure#3 observed:vertical and step cracks at masonry wall at parapet wall level north corner also observed spalled bricks at the pa
May 19, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances requiredf by 28-302.4 for control #811871. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 1
Cease use. 5j1,70z9,8v1,10k11,46p7,71l10. (5j)car door gap excessive adjust. (70z)remove water from pit. (10k)replace car door gibbs. (40p)provide access to motor room. (71l)repair pit light.
Mar 13, 2018
Resolve - Class - 1
08v01,02l10,32h11,56y13-08v01)adjust floor level in up and down direction. 02l10)repair phone. 32h11)replace guide shoes worn. 56y13)seal oil leak on hoist.
Oct 11, 2017
Resolve - Class - 1
Sec. 3307.5.2. flagperson not at location of work. noted: at exp #1 ondaniel low terrace the sidewalk was closed completely off causing pedestrians to walk in the street. men were working above on suspended
Oct 31, 2011
Resolve - Class - 1
Sec. 1rcny9-01. rigger failed to provide foreman for job site. at timeof inspection there was no foreman on site, 3 men (2) on scaffold and (1) on roof no one responded when i requested to speak w/the foreman.
Oct 31, 2011 · Penalty $1,600
Resolve - Class - 2
No certificate of fitness. noted: when requesting c/f only 1 of the workers on the scaffold could provide proof of training licensed rigger failed to ensure scaffold worker met minimum requirements. remedy:
Oct 31, 2011 · Penalty $400
Resolve - Class - 2
Fail to submit an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules & regulations
Nov 21, 2008 · Penalty $400
Resolve - Non-hazardous
50f11-74m07-11q03-15b01-38x11-32d06-74d06-57o02. 74-m toe guard missing 15-b laffy 2 basement doors checks adjust 32-d top of car's pipe secore 74-d top of car stud plate secure.
Apr 2, 2002 · Penalty $440
Resolve - Non-hazardous
74m07-11q03-38x11-15b01-15i11-57o02. 74-m toe guard missing 15-b 6, 2, basement doors check adjust 15-i 4, 3, repair.
Apr 2, 2002 · Penalty $440
Resolve - Non-hazardous
50f11/ 50y14/ 46h12/ 39h08/ 57o02/ 11q03/ 15e01/ 74m07
Aug 30, 2001 · Penalty $350
Resolve - Non-hazardous
50y14/ 39h08/ 46h12/ 11q03/ 08v01/ 57o02/ 74m07/
Aug 30, 2001 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Apr 9, 2026 · Apt 3P
Close - Water leak
Slow leak
Mar 23, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 3P
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt 1J
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 3N
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 3P
Close - Paint/plaster
Wall
Jan 3, 2026 · Apt EE
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jan 3, 2026 · Apt EE
Close - Flooring/stairs
Floor
Jan 3, 2026 · Apt EE
Close - Door/window
Door
Jan 3, 2026 · Apt EE
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 1K
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt 2G
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Plumbing
Water supply
Nov 8, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Sep 8, 2025 · Apt 3P
Close - Paint/plaster
Ceiling
May 23, 2025 · Apt 3G
Close - Paint/plaster
Wall
May 23, 2025 · Apt 3G
Close - Paint/plaster
Ceiling
May 23, 2025 · Apt 3G
Close - Safety
Carbon monoxide detector
May 23, 2025 · Apt 3G
Close - Safety
Smoke detector
May 23, 2025 · Apt 3G
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Feb 17, 2025 · Apt 4S
Close - Heat/hot water
Apartment only
Feb 7, 2025 · Apt 3P
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 3P
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 3P
Close - Heat/hot water
Entire building
Dec 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 3P
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 4S
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Plumbing
Water supply
Nov 24, 2024 · Apt BLDG
Close - Plumbing
Water supply
Nov 24, 2024 · Apt 1
Close - Heat/hot water
Entire building
Nov 22, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 17, 2024 · Apt 2S
Close - Plumbing
Bathtub/shower
Sep 17, 2024 · Apt 2S
Close - Water leak
Heavy flow
Sep 15, 2024 · Apt 3N
Close - Water leak
Slow leak
Sep 12, 2024 · Apt 3D
Close - Paint/plaster
Wall
Sep 12, 2024 · Apt 3D
Close - Flooring/stairs
Floor
Sep 12, 2024 · Apt 3D
Close - Unsanitary condition
Mold
Sep 12, 2024 · Apt 3D
Close - Unsanitary condition
Mold
Sep 10, 2024 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1932
- Floors
- 5
- Residential units
- 103
- Building area
- 96,780 ft²
- Lot area
- 22,000 ft²
- Zoning
- R2
- Community board
- 501
- Council district
- 49
- Block / lot
- 28 / 77
- Assessed value
- $3,844,350
- Landmark / historic district
- No
HPD registration #500071, last renewed Oct 7, 2025.
Questions about 30 Daniel Low Terrace
Who owns 30 Daniel Low Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Danway Realty LLC.
Does 30 Daniel Low Terrace have violations?
Yes. NYC HPD has recorded 288 housing violations at this property.
Is 30 Daniel Low Terrace rent stabilized?
NYC Department of Finance tax bills listed 102 rent-stabilized units here in 2024 (about 99% of its 103 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 30 Daniel Low Terrace built?
City records list 1932 as the year it was built.
How many apartments are in 30 Daniel Low Terrace?
It has 103 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.