roofy

141 St Marks Place

Staten Island, NY 10301BBL 5-00015-0001Map

Owner of record: 141 Ag LLC

141 St Marks Place is an elevator apartment building built in 1925 in Staten Island, 10301. It has 42 residential units across 6 floors. The owner of record is 141 Ag LLC. HPD has recorded 290 housing violations here, most recently on October 4, 2026. 43 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.

HPD violations
290
DOB violations
25
ECB violations
17
HPD complaints
449

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
39
About 93% of the building's 42 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 290

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the foyer located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall, east wall in the foyer located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft st north wall north wall in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, west wall, 1st closet from north at east wall door, west wall, ceiling in the foyer located at apt 2e, 2nd story, 2nd apartment from west at north

    Oct 4, 2026 · Apt 2E

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2g, 2nd story, 2nd apartment from north at east

    Sep 3, 2026 · Apt 2G

    Open — Notice of issuance sent to tenant
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the foyer located at apt 2g, 2nd story, 2nd apartment from north at east

    Sep 3, 2026 · Apt 2G

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective hinges at closet door in the 5th room from north at east located at apt 2g, 2nd story, 2nd apartment from north at east

    Sep 3, 2026 · Apt 2G

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 2g, 2nd story, 2nd apartment from north at east

    Sep 3, 2026 · Apt 2G

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2g, 2nd story, 2nd apartment from north at east

    Sep 3, 2026 · Apt 2G

    Open — Civ14 mailed
  • C

    Properly repair or replace the broken or defective glass pane at vestibule door , 1st story

    Sep 3, 2026

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd private hallway from north located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Civ14 mailed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq-ft observed at ceiling and south wall in the 2nd private hallway from north located at apt 2h, 2nd story, 1st apartment from east at south

    Sep 2, 2026 · Apt 2H

    Open — Notice of issuance sent to tenant
  • A

    Replace with new the missing safety caps at electrical outlet at north wall at public hall, 1st story

    Jul 13, 2026

    Open — Nov sent out
  • C

    Properly secure the loose washbasin in the bathroom located at apt 1c, 1st story, 3rd apartment from south at west

    Jul 13, 2026 · Apt 1C

    Open — First no access to re- inspect violation
  • C

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1c, 1st story, 3rd apartment from south at west

    Jul 13, 2026 · Apt 1C

    Open — First no access to re- inspect violation
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jul 13, 2026

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of uncapped radiator shut-off valve at public hall, 5th story

    Jul 2, 2026

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4b, 4th story, 1st apartment from south at west

    Jun 16, 2026 · Apt 4B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof exit

    Jun 16, 2026

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 2nd apartment from south at west

    Jun 16, 2026 · Apt 5C

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-apt dd, 1st bsmt-apt from west at north

    Jun 16, 2026 · Apt DD

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-apt aa, 4th bsmt-apt from west at north

    Jun 16, 2026 · Apt AA

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1f, 1st story, 1st apartment from north at east

    Jun 16, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2h, 2nd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 2H

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Jun 16, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2a, 2nd story, 2nd apartment from east at south

    Jun 16, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Jun 16, 2026

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5d, 5th story, 1st apartment from west at north

    Jun 16, 2026 · Apt 5D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 1c, 1st story, 3rd apartment from south at west

    Jun 10, 2026 · Apt 1C

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of key operated lock at door preventing entrance to fire escape in the 5th room from north located at apt 2g, 2nd story, 2nd apartment from north at east

    Jun 10, 2026 · Apt 2G

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2g, 2nd story, 2nd apartment from north at east

    Jun 10, 2026 · Apt 2G

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2e, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2E

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 2e, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2E

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 1c, 1st story, 3rd apartment from south at west

    Jun 10, 2026 · Apt 1C

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1c, 1st story, 3rd apartment from south at west

    Jun 10, 2026 · Apt 1C

    Closed — Violation closed

DOB building violations · 25

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 25, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 13, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 30, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2012

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2011

    Dob violation - resolved
Show 15 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 14, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 4, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 6, 2007

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Oct 29, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 1993

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 1992

    Vp*-violation unserved ecb- dismissed
  • Plumbing none

    P-plumbing none

    Jul 12, 1991

    Dob violation - dismissed
  • Plumbing none

    P-plumbing none

    Jul 12, 1991

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Oct 12, 1989

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51)clean installation (52)repair work light (53)provide cab capacity plate (54)provide elec cover cab & shaftway

    Jan 10, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    51-clean installation 52-repair work light 53-provide cab capacity plate 54-provide light in elev cover cab and shaftway

    Jan 10, 1989

    Dob violation - resolved

ECB violations · 17

  • Class - 1

    Unlawfully contd work while on notice of swo.working against active swo work was completed certified10/9/20.in ref to complaint5130283,ecb35284955h&app500321761 prior to rescinding swo comply w/swo

    Feb 3, 2022

    Resolve
  • Class - 1

    Unlawful act. failure to comply with an order of the commissioner. records indicate no application filed to correct,certify and remove violations contained in summons #35284955h and #35346130y. comply with

    Oct 25, 2018

    Resolve
  • Class - 1

    Unlawful act, failure to comply with an order of the commissioner. records indicate no application filed to correct, certify and remove violations contained in summons #35284955h. rem: comply with commissioner'

    Aug 30, 2018 · Penalty $3,125

    Resolve
  • Class - 1

    Unlawful act. failure to comply with an order of the commissioner. records indicate no application filed to correct, certify and remove violations contained in summons's #35313206k and 35284955. rmdy:comply

    Jul 3, 2018

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summ/vio#35323211y issued on 03/15/18 and to file a cofc pursuant to 28-201.1 and 1rcny 12-01.for cofc failure to maintain.rem:comply w/comm;s order and/or file

    May 25, 2018 · Penalty $625

    Resolve
  • Class - 1

    Unlawful acts, fail to comply with an order of the commissioner. records indicate no application on file to remove, correct and certify violations contained in summons #35268511r and 35284955h. rem: comply with

    May 1, 2018

    Resolve
  • Class - 1

    Failure to maintain bldg wall(s) or appurtenance.noted @time of insp observed a 20ft w x 5ft h section of stucco became disslodged & collapsed to the ground.the section of stucco became dislodged @the 6th fl le

    Mar 15, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Unlawful act. failure to comply w/an order of the commissioner. records indicate no application filed to certify,correct & remove violations contained in summons#35284955h. remedy: comply w/comm's order.

    Jan 24, 2018

    Resolve
  • Class - 1

    Electrical work w/permit.observed in apt 4h,accompanied by supt wife,that the recpt outlet where fire had occupied had been replaced w/new prior to obtaining permit.since fdny shut the apt off testing of the ol

    Sep 19, 2017 · Penalty $400

    Resolve
  • Class - 2

    B254 16 34b 50b 50d 15 4a 50a 50c 50e. 50a-insulate boiler piping & fittings, install valves @ header & return. 50c-remove all storage. 50d-remove all flamables. 50e-register new beckett gas burner & legalize o

    Sep 20, 2011 · Penalty $2,500

    Resolve
Show 7 more ↓
  • Non-hazardous

    Failure to comply w/commissioner's order to correct the violating condition & file a certificate of correction w/the dept of bldg. for vio# 34446170k. remedy: obtain permit & file a certificate of correction

    Mar 28, 2006 · Penalty $500

    Resolve
  • Non-hazardous

    Work without a permit,noted at west basement 1 apartment is being divided into 2 apartments with new supply & waste lines for 3 pc bathroom & kitchen sink partitions also erected dividing apartment for bathroom

    Feb 16, 2005 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to provide elevator landing sign that shall read: in case of fire use stairs, unless otherwise instructed, at the elevatorbank on floor 2 to 5. failure to provide 3-inch minimum height numerical sign

    Jan 14, 2003

    Resolve
  • Non-hazardous

    36,30,new rockmill mp 70-9945 low pressure scotch marine fire tube boiler not registered w/dept. of bldgs. boiler division.dob records show spencer ft boiler.

    Apr 26, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    75u 47l 40o 46b 05 74o 54l cease the use of device 5p34 until 46-b-15-counter weight lands before car reaches top floor and 05-b-11 -15 repaired car runs with gate open 2 inches

    Apr 10, 1999 · Penalty $500

    Resolve
  • Non-hazardous

    75u,46l,39h,46m, 39-h-12 regroove or replace traction sheave 46-m-07, provide shackle springs on car side.

    Aug 26, 1998

    Resolve
  • Non-hazardous

    14m,21l,35p,13l,74#,74a#,74b#,28l,73o,74c#,#74 provide cab capacity plate. #74a repair work lights #74b provide all elec. covers #74c adjust floor stops.

    Sep 6, 1991

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Sep 28, 2026 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Sep 28, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Mold

    Aug 30, 2026 · Apt 2H

    Close
  • Plumbing

    Bathtub/shower

    Aug 30, 2026 · Apt 2H

    Close
  • Plumbing

    Water supply

    Jun 26, 2026 · Apt 2G

    Close
  • Plumbing

    Water supply

    Jun 10, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Mar 11, 2026 · Apt ENTIRE

    Close
  • Unsanitary condition

    Mold

    Mar 11, 2026 · Apt ENTIRE

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 11, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 11, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Mar 7, 2026 · Apt 2E

    Close
  • Plumbing

    Bathtub/shower

    Mar 7, 2026 · Apt 2E

    Close
  • Water leak

    Heavy flow

    Mar 7, 2026 · Apt 2E

    Close
  • Plumbing

    Water supply

    Mar 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 2G

    Close
  • Plumbing

    Bathtub/shower

    Jan 6, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Mold

    Jan 2, 2026 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2025 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2025 · Apt 1A

    Close
  • Door/window

    Door

    Aug 18, 2025 · Apt DD

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2024 · Apt 2G

    Close
  • Flooring/stairs

    Floor

    Aug 16, 2024 · Apt 2G

    Close
  • Plumbing

    Water supply

    Aug 16, 2024 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2024 · Apt 2G

    Close
  • Door/window

    Window frame

    Aug 16, 2024 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2024 · Apt 2H

    Close
  • Water leak

    Heavy flow

    Dec 18, 2023 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2023 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Nov 1, 2023 · Apt 2G

    Close
  • Water leak

    Slow leak

    Nov 1, 2023 · Apt 2G

    Close
  • Plumbing

    Water supply

    Nov 1, 2023 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Nov 1, 2023 · Apt 2G

    Close
  • Flooring/stairs

    Floor

    Nov 1, 2023 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2023 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2023 · Apt 5F

    Close
  • Door/window

    Door

    Jul 21, 2023 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Jun 26, 2023 · Apt BASE

    Close
  • Door/window

    Door

    Mar 22, 2023 · Apt 2G

    Close
  • Safety

    Smoke detector

    Mar 22, 2023 · Apt 2G

    Close
  • Flooring/stairs

    Floor

    Mar 22, 2023 · Apt 2G

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1925
Floors
6
Residential units
42
Building area
39,910 ft²
Lot area
12,240 ft²
Zoning
R3A
Community board
501
Council district
49
Block / lot
15 / 1
Assessed value
$1,115,100
Landmark / historic district
No

HPD registration #500253, last renewed Jun 15, 2026.

Questions about 141 St Marks Place

Who owns 141 St Marks Place?

The owner of record in NYC Department of City Planning PLUTO data is 141 Ag LLC.

Does 141 St Marks Place have violations?

Yes. NYC HPD has recorded 290 housing violations at this property.

Is 141 St Marks Place rent stabilized?

NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 93% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 141 St Marks Place built?

City records list 1925 as the year it was built.

How many apartments are in 141 St Marks Place?

It has 42 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.