roofy

160 Richmond Terrace

Staten Island, NY 10301BBL 5-00012-0015Map

Owner of record: Richmond Group Capital LLC

160 Richmond Terrace is an elevator apartment building built in 2022 in Staten Island, 10301. It has 74 residential units across 7 floors. The owner of record is Richmond Group Capital LLC. HPD has recorded 91 housing violations here, most recently on August 11, 2026. 22 of the 50 most recent violations are still open. City tax records listed 74 rent-stabilized apartments here in 2024.

HPD violations
91
DOB violations
3
ECB violations
7
HPD complaints
400

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
74
About 100% of the building's 74 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 91

  • C

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Aug 11, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 11, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing , 1st story

    Aug 11, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper door at compactor closet, 6th story

    Mar 20, 2026

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective 3rd and 4th concrete step tread from landing at fire stairs ''a'' at fire stairs, 1st story

    Mar 20, 2026

    Open — False certification
  • A

    Replace with new the missing safety plastic covers on 2nd electrical outlet from east at south wall at public hall, 1st story

    Mar 10, 2026

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Dec 2, 2025

    Closed — Violation dismissed
  • A

    Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 7th story

    Dec 2, 2025

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 22, 2025 · Apt 2J

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 22, 2025 · Apt 2J

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 22, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell/buzzer intercom from buiding entrance to apt #2j ( 2story, south4) at front areaway

    Nov 14, 2025

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective bell/buzzer intercom from buiding entrance to apt#2j( 2story, south4) at front areaway

    Nov 14, 2025

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 5, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 5, 2025 · Apt 2J

    Open — Nov certified late
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Nov 5, 2025 · Apt 2J

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective 5th concrete tread from bottom up at stair ''b'' at public hall stairs, 3rd story

    Oct 29, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective 3rd and 6th concrete tread from bottom up at stair ''c'' at cellar level at public hall stairs

    Oct 29, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective 3rd and 4th concrete tread from bottom up at stair ''a'' at public hall stairs, 1st story

    Oct 29, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective 6th concrete tread from bottom up at stair ''a'' at public hall stairs, 2nd story

    Oct 29, 2025

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 29, 2025 · Apt 2J

    Open — Nov certified late
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 29, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2j, 1st story, 4th apartment from east at south

    Oct 23, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste line under sink in the kitchen located at apt 2j, 1st story, 4th apartment from east at south , section ''south''

    Oct 23, 2025 · Apt 2J

    Closed — Violation dismissed
  • C

    Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 21, 2025 · Apt 2J

    Open — Nov certified late
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 21, 2025 · Apt 2J

    Open — Nov certified late
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 21, 2025 · Apt 2J

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door inside compactor closet, latch at public hall, 2nd story

    Oct 15, 2025

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 6, 2025 · Apt 2J

    Open — Invalid certification
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 6, 2025 · Apt 2J

    Open — Invalid certification
  • C

    Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 6, 2025 · Apt 2J

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft under sink at south in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Oct 6, 2025 · Apt 2J

    Closed — Violation dismissed
  • A

    Replace with new the missing safety plastic covers on electrical outlet at west wall at public hall, 2nd story

    Sep 16, 2025

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south original violation 18218192 issued 10-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Sep 10, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Sep 10, 2025 · Apt 2J

    Open — Not complied with
  • B

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Sep 10, 2025 · Apt 2J

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Sep 10, 2025 · Apt 2J

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Sep 10, 2025 · Apt 2J

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Sep 10, 2025 · Apt 2J

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Aug 8, 2025 · Apt 2J

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south original violation 18147603 issued 08-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 8, 2025 · Apt 2J

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south

    Aug 8, 2025 · Apt 2J

    Open — Not complied with
  • C

    Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Aug 8, 2025 · Apt 2J

    Open — Nov certified late
  • A

    Cleanse to the satisfaction of this department the mildew on wood base inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south

    Aug 5, 2025 · Apt 2J

    Open — Invalid certification
  • C

    Repair the broken or defective connection at waste line under sink in the kitchenette located at apt 2j, 2nd story, 4th apartment from east at south

    Aug 5, 2025 · Apt 2J

    Closed — Violation closed
  • B

    Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 2nd story

    Aug 5, 2025

    Open — First no access to re- inspect violation
  • B

    Replace with new the missing safety plastic covers on electrical outlets at east and south walls at public hall, 1st story

    Aug 5, 2025

    Open — First no access to re- inspect violation
  • A

    Replace with new the missing safety plastic covers on electrical outlet at east and south walls at public hall, 1st story

    Aug 4, 2025

    Open — First no access to re- inspect violation
  • A

    Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 2nd story

    Aug 4, 2025

    Open — First no access to re- inspect violation

DOB building violations · 3

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 3, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed

ECB violations · 7

  • Class - 2

    Observed inactive site at 7th story framing with sidewalk shed at exp 1 and 4 and work and storage zone at exp1 with no solid enclosure or wire mesh to the deck of the sidewalk to protect pedestrians from mater

    Sep 13, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water procedures. at time of inspection on a proposed 8 story new building at 2 story super structure forming phase i observed at exposure 1 concrete washout water fro

    Jul 7, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide overhead protection for adjacent property. i observed no overhead protection at exp#2 for adjacent property walkway. this condition puts public in danger.stop all work at exp#2 above 1st stor

    Jun 24, 2022

    Resolve
  • Class - 2

    Failure to comply with dot regulations. i observed heavy construction equipment on streets and sidewalks not conforming to dot permits. no barriers provided around equipment to safeguard pedestrians. also obser

    Jun 24, 2022 · Penalty $2,400

    Resolve
  • Class - 2

    Bc 3307.2.1 dot permit at the time of inspection of proposed 8 story new building at foundation active jobsite observed heavy machinery onsite-two excavators.upon request of dot permit to cross sidewalk and upo

    Apr 19, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Ac 28-105.12.8 work does not conform to ssp/conditions not reflected on ssp.at the time of inspection of proposed 8 story new building at foundation active jobsite observed two excavators onsite.upon review of

    Apr 19, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide notification prior to starting demo noted:at the time of my inspection of an demo standoff inspection i observed that the1 story structure was down slab on grade was cracked for drainage as p

    Feb 1, 2022 · Penalty $2,500

    Resolve

Complaints

  • Water leak

    Heavy flow

    Oct 16, 2026 · Apt 2I

    Open
  • Plumbing

    Basin/sink

    Oct 16, 2026 · Apt 2I

    Open
  • Appliance

    Refrigerator

    Oct 16, 2026 · Apt 2I

    Open
  • Plumbing

    Bathtub/shower

    Oct 12, 2026 · Apt 3J

    Open
  • Plumbing

    Toilet

    Oct 12, 2026 · Apt 3J

    Open
  • Plumbing

    Toilet

    Oct 12, 2026 · Apt 3J

    Open
  • Appliance

    Refrigerator

    Aug 13, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Aug 5, 2026 · Apt 6E

    Close
  • Electric

    Power outage

    Mar 28, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Stairs

    Mar 28, 2026 · Apt 2J

    Close
Show 40 more ↓
  • Elevator

    Maintenance

    Mar 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Mar 20, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Mar 20, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Mar 20, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 20, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Mar 19, 2026 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Mar 19, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Stairs

    Mar 19, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 18, 2026 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Mar 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 18, 2026 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 18, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 18, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 18, 2026 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
2022
Floors
7
Residential units
74
Building area
51,970 ft²
Lot area
9,016 ft²
Zoning
R6
Community board
501
Council district
49
Block / lot
12 / 15
Assessed value
$4,452,300
Landmark / historic district
No

HPD registration #501832, last renewed Sep 22, 2025.

Questions about 160 Richmond Terrace

Who owns 160 Richmond Terrace?

The owner of record in NYC Department of City Planning PLUTO data is Richmond Group Capital LLC.

Does 160 Richmond Terrace have violations?

Yes. NYC HPD has recorded 91 housing violations at this property.

Is 160 Richmond Terrace rent stabilized?

NYC Department of Finance tax bills listed 74 rent-stabilized units here in 2024 (about 100% of its 74 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 160 Richmond Terrace built?

City records list 2022 as the year it was built.

How many apartments are in 160 Richmond Terrace?

It has 74 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.