160 Richmond Terrace
Staten Island, NY 10301BBL 5-00012-0015Map
Owner of record: Richmond Group Capital LLC
160 Richmond Terrace is an elevator apartment building built in 2022 in Staten Island, 10301. It has 74 residential units across 7 floors. The owner of record is Richmond Group Capital LLC. HPD has recorded 91 housing violations here, most recently on August 11, 2026. 22 of the 50 most recent violations are still open. City tax records listed 74 rent-stabilized apartments here in 2024.
- HPD violations
- 91
- DOB violations
- 3
- ECB violations
- 7
- HPD complaints
- 400
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Aug 11, 2026
Open — Nov certified on time - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 11, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing , 1st story
Aug 11, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at hopper door at compactor closet, 6th story
Mar 20, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective 3rd and 4th concrete step tread from landing at fire stairs ''a'' at fire stairs, 1st story
Mar 20, 2026
Open — False certification - ANon-hazardous
Replace with new the missing safety plastic covers on 2nd electrical outlet from east at south wall at public hall, 1st story
Mar 10, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 2, 2025
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 7th story
Dec 2, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Nov 22, 2025 · Apt 2J
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Nov 22, 2025 · Apt 2J
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Nov 22, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell/buzzer intercom from buiding entrance to apt #2j ( 2story, south4) at front areaway
Nov 14, 2025
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective bell/buzzer intercom from buiding entrance to apt#2j( 2story, south4) at front areaway
Nov 14, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Nov 5, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Nov 5, 2025 · Apt 2J
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Nov 5, 2025 · Apt 2J
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective 5th concrete tread from bottom up at stair ''b'' at public hall stairs, 3rd story
Oct 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 3rd and 6th concrete tread from bottom up at stair ''c'' at cellar level at public hall stairs
Oct 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 3rd and 4th concrete tread from bottom up at stair ''a'' at public hall stairs, 1st story
Oct 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 6th concrete tread from bottom up at stair ''a'' at public hall stairs, 2nd story
Oct 29, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Oct 29, 2025 · Apt 2J
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Oct 29, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2j, 1st story, 4th apartment from east at south
Oct 23, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line under sink in the kitchen located at apt 2j, 1st story, 4th apartment from east at south , section ''south''
Oct 23, 2025 · Apt 2J
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Oct 21, 2025 · Apt 2J
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Oct 21, 2025 · Apt 2J
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Oct 21, 2025 · Apt 2J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hopper door inside compactor closet, latch at public hall, 2nd story
Oct 15, 2025
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Oct 6, 2025 · Apt 2J
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Oct 6, 2025 · Apt 2J
Open — Invalid certification - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Oct 6, 2025 · Apt 2J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft under sink at south in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Oct 6, 2025 · Apt 2J
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety plastic covers on electrical outlet at west wall at public hall, 2nd story
Sep 16, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south original violation 18218192 issued 10-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Sep 10, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Sep 10, 2025 · Apt 2J
Open — Not complied with - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Sep 10, 2025 · Apt 2J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Sep 10, 2025 · Apt 2J
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Sep 10, 2025 · Apt 2J
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Sep 10, 2025 · Apt 2J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Aug 8, 2025 · Apt 2J
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south original violation 18147603 issued 08-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 8, 2025 · Apt 2J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2j, 2nd story, 4th apartment from east at south
Aug 8, 2025 · Apt 2J
Open — Not complied with - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Aug 8, 2025 · Apt 2J
Open — Nov certified late - ANon-hazardous
Cleanse to the satisfaction of this department the mildew on wood base inside base cabinet under sink in the kitchen located at apt 2j, 2nd story, 4th apartment from east at south
Aug 5, 2025 · Apt 2J
Open — Invalid certification - CImmediately hazardous
Repair the broken or defective connection at waste line under sink in the kitchenette located at apt 2j, 2nd story, 4th apartment from east at south
Aug 5, 2025 · Apt 2J
Closed — Violation closed - BHazardous
Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 2nd story
Aug 5, 2025
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing safety plastic covers on electrical outlets at east and south walls at public hall, 1st story
Aug 5, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Replace with new the missing safety plastic covers on electrical outlet at east and south walls at public hall, 1st story
Aug 4, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Replace with new the missing safety plastic covers on electrical outlets at west and south walls at public hall, 2nd story
Aug 4, 2025
Open — First no access to re- inspect violation
DOB building violations · 3
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed
ECB violations · 7
- Class - 2
Observed inactive site at 7th story framing with sidewalk shed at exp 1 and 4 and work and storage zone at exp1 with no solid enclosure or wire mesh to the deck of the sidewalk to protect pedestrians from mater
Sep 13, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to perform proper concrete washout water procedures. at time of inspection on a proposed 8 story new building at 2 story super structure forming phase i observed at exposure 1 concrete washout water fro
Jul 7, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to provide overhead protection for adjacent property. i observed no overhead protection at exp#2 for adjacent property walkway. this condition puts public in danger.stop all work at exp#2 above 1st stor
Jun 24, 2022
Resolve - Class - 2
Failure to comply with dot regulations. i observed heavy construction equipment on streets and sidewalks not conforming to dot permits. no barriers provided around equipment to safeguard pedestrians. also obser
Jun 24, 2022 · Penalty $2,400
Resolve - Class - 2
Bc 3307.2.1 dot permit at the time of inspection of proposed 8 story new building at foundation active jobsite observed heavy machinery onsite-two excavators.upon request of dot permit to cross sidewalk and upo
Apr 19, 2022 · Penalty $1,250
Resolve - Class - 2
Ac 28-105.12.8 work does not conform to ssp/conditions not reflected on ssp.at the time of inspection of proposed 8 story new building at foundation active jobsite observed two excavators onsite.upon review of
Apr 19, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to provide notification prior to starting demo noted:at the time of my inspection of an demo standoff inspection i observed that the1 story structure was down slab on grade was cracked for drainage as p
Feb 1, 2022 · Penalty $2,500
Resolve
Complaints
- Water leak
Heavy flow
Oct 16, 2026 · Apt 2I
Open - Plumbing
Basin/sink
Oct 16, 2026 · Apt 2I
Open - Appliance
Refrigerator
Oct 16, 2026 · Apt 2I
Open - Plumbing
Bathtub/shower
Oct 12, 2026 · Apt 3J
Open - Plumbing
Toilet
Oct 12, 2026 · Apt 3J
Open - Plumbing
Toilet
Oct 12, 2026 · Apt 3J
Open - Appliance
Refrigerator
Aug 13, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Aug 5, 2026 · Apt 6E
Close - Electric
Power outage
Mar 28, 2026 · Apt BLDG
Close - Flooring/stairs
Stairs
Mar 28, 2026 · Apt 2J
Close
Show 40 more ↓
- Elevator
Maintenance
Mar 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt BLDG
Close - Elevator
Maintenance
Mar 20, 2026 · Apt BLDG
Close - Electric
No lighting
Mar 20, 2026 · Apt BLDG
Close - Electric
No lighting
Mar 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 20, 2026 · Apt BLDG
Close - Electric
Power outage
Mar 19, 2026 · Apt BLDG
Close - Elevator
Maintenance
Mar 19, 2026 · Apt BLDG
Close - Flooring/stairs
Stairs
Mar 19, 2026 · Apt 2J
Close - Unsanitary condition
Garbage/recycling storage
Mar 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2026 · Apt BLDG
Close - Elevator
Maintenance
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2026 · Apt BLDG
Close - General
Signage missing
Mar 18, 2026 · Apt BLDG
Close - General
Cooking gas
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Elevator
Maintenance
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 18, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2022
- Floors
- 7
- Residential units
- 74
- Building area
- 51,970 ft²
- Lot area
- 9,016 ft²
- Zoning
- R6
- Community board
- 501
- Council district
- 49
- Block / lot
- 12 / 15
- Assessed value
- $4,452,300
- Landmark / historic district
- No
HPD registration #501832, last renewed Sep 22, 2025.
Questions about 160 Richmond Terrace
Who owns 160 Richmond Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Richmond Group Capital LLC.
Does 160 Richmond Terrace have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 160 Richmond Terrace rent stabilized?
NYC Department of Finance tax bills listed 74 rent-stabilized units here in 2024 (about 100% of its 74 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 160 Richmond Terrace built?
City records list 2022 as the year it was built.
How many apartments are in 160 Richmond Terrace?
It has 74 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.