114-30 Rockaway Beach Boulevard
Queens, NY 11694BBL 4-16166-7502Map
Owner of record: B 114 LLC
114-30 Rockaway Beach Boulevard is a condominium built in 2017 in Queens, 11694. It has 27 residential units across 3 floors. The owner of record is B 114 LLC. HPD has recorded 37 housing violations here, most recently on June 3, 2026. 7 of the 37 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 37
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 90
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Jun 3, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on fire door leading to car garage at north at public hall, 1st story
Jun 3, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 4, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 4, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 4, 2024
Closed — Violation closed - BHazardous
Properly secure the loose hanging fire exit sign at public hall, 2nd story
Oct 11, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd story
Oct 11, 2023
Closed — Violation closed - BHazardous
Replace with new the missing door knob on firedoor a, door south 1, at west side at public hall, 2nd story
Oct 11, 2023
Closed — Violation closed - BHazardous
Properly secure the loose handle on north 1 firedoor to firestairs at public hall, 1st story
Oct 11, 2023
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective light switch on east wall in the foyer located at apt 2l, 2nd story, 1st apartment from south at west
Oct 11, 2023 · Apt 2L
Closed — Violation closed
Show 27 more ↓
- BHazardous
Properly repair or replace the broken or defective light switch on west wall in the private hallway located at apt 2l, 2nd story, 1st apartment from south at west
Oct 11, 2023 · Apt 2L
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1a, 1st story, 1st apartment from south at west
Feb 5, 2023 · Apt 1A
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Feb 5, 2023 · Apt 1A
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 2, 2021
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 2, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 2, 2021
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story, 3rd apartment from east at south
Aug 5, 2020 · Apt 3F
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 5, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 5, 2020
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 5, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 5, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 5, 2020
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at 3rd floor boiler room , 3rd story
Aug 5, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Aug 5, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 24, 2020
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 28, 2020
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 28, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 21, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 21, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 21, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 21, 2020
Closed — Violation closed
DOB building violations · 3
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active
ECB violations · 2
- Class - 2
At time of inspection, observation was made inside of genesis adult day care center gathered people approximately 40 using space for entertainment and rehabilitation services. approximately 90 individual seatin
Mar 9, 2023 · Penalty $800
Active - Class - 2
At time of inspection, observation was made inside of genesis adult day care active rehabilitation and entertainment services which consist of approximately 40 people, 80 individual seating chairs. according c
Mar 9, 2023 · Penalty $1,250
Active
Complaints
- Heat/hot water
Entire building
Jul 22, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 27, 2023 · Apt 2L
Close - Appliance
Electric/gas range
Oct 8, 2023 · Apt 2L
Close - Electric
No lighting
Oct 8, 2023 · Apt 2L
Close - Plumbing
Bathtub/shower
Oct 8, 2023 · Apt 2L
Close - Water leak
Slow leak
Aug 16, 2023 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 3, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Jun 1, 2021 · Apt 3I
Close - Heat/hot water
Apartment only
May 30, 2021 · Apt 3I
Close - Plumbing
Water supply
Aug 19, 2020 · Apt 3F
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Aug 8, 2020 · Apt 3J
Close - Heat/hot water
Apartment only
Aug 2, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Jul 25, 2020 · Apt 3F
Close - Door/window
Door
Jul 21, 2020 · Apt 3J
Close - Heat/hot water
Apartment only
Jul 19, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Jul 6, 2020 · Apt 3F
Close - Door/window
Door
Jul 3, 2020 · Apt 3J
Close - Heat/hot water
Apartment only
Jun 18, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
Jun 16, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
Jun 13, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
Jun 6, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
Jun 1, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
May 25, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
May 24, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
May 15, 2020 · Apt 3I
Close - General
Bell/buzzer/intercom
May 15, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
May 6, 2020 · Apt 2C
Close - Heat/hot water
Apartment only
Apr 30, 2020 · Apt 3I
Close - Heat/hot water
Apartment only
Apr 18, 2020 · Apt 3I
Close - Electric
Outlet/switch
Apr 30, 2019 · Apt 3J
Close - Electric
Electric-supply
Sep 15, 2009 · Apt 1E
Close - Electric
Electric-supply
Jul 13, 2009 · Apt 1R
Close - General
Cooking gas
Jul 13, 2009 · Apt 1R
Close - Heating
Heat related
Jul 13, 2009 · Apt 1R
Close - Paint/plaster
Ceiling
Jul 13, 2009 · Apt 1R
Close - Plumbing
Water-leaks
Jul 13, 2009 · Apt 1R
Close - Electric
Lighting
Jul 13, 2009 · Apt 1R
Close - Paint/plaster
Ceiling
Jul 13, 2009 · Apt 1R
Close - Plumbing
Toilet
Jul 13, 2009 · Apt 1R
Close - General
Floor
Jul 13, 2009 · Apt 1R
Close - Appliance
Electric/gas range
Jul 13, 2009 · Apt 1R
Close - Electric
Electric-supply
May 8, 2009 · Apt 1R
Close - Paint/plaster
Wall
May 8, 2009 · Apt 1R
Close - Plumbing
Toilet
May 8, 2009 · Apt 1R
Close - General
Mold
May 8, 2009 · Apt 1R
Close - General
Windows
May 8, 2009 · Apt 1R
Close - Electric
Electric-supply
Jun 24, 2008 · Apt 4
Close - Nonconst
Vermin
Nov 12, 2007 · Apt 4
Close - Plumbing
Shower-stall
Apr 2, 2007 · Apt 1L
Close - General
Windows
Apr 2, 2007 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2017
- Floors
- 3
- Residential units
- 27
- Building area
- 43,680 ft²
- Lot area
- 18,029 ft²
- Zoning
- R5B
- Community board
- 414
- Council district
- 32
- Block / lot
- 16166 / 7502
- Assessed value
- $2,102,400
- Landmark / historic district
- No
HPD registration #433102, last renewed Sep 5, 2025.
Questions about 114-30 Rockaway Beach Boulevard
Who owns 114-30 Rockaway Beach Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is B 114 LLC.
Does 114-30 Rockaway Beach Boulevard have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 114-30 Rockaway Beach Boulevard rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 114-30 Rockaway Beach Boulevard built?
City records list 2017 as the year it was built.
How many apartments are in 114-30 Rockaway Beach Boulevard?
It has 27 residential units and 29 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.