88-02 Rockaway Beach Blvd
Queens, NY 11693BBL 4-16123-0086Map
Owner of record: Ocean Terrace 8802 LLC
88-02 Rockaway Beach Blvd is a walk-up apartment building built in 1957 in Queens, 11693. It has 19 residential units across 7 floors. The owner of record is Ocean Terrace 8802 LLC. HPD has recorded 62 housing violations here, most recently on February 18, 2026. 3 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 62
- DOB violations
- 20
- ECB violations
- 26
- HPD complaints
- 126
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 62
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Feb 18, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges compactor closet door at public hall, 4th story
Jul 1, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story
Jun 14, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance lower window sash in the 1st bathroom from north located at apt 4a, 4th story, 2nd apartment from south at west
Apr 15, 2025 · Apt 4A
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west
Feb 5, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west
Feb 5, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at east located at apt 6b, 6th story, 1st apartment from east at south
Jun 28, 2023 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Refit windows in the 2nd room from north at east located at apt 6b, 6th story, 1st apartment from east at south
Jun 28, 2023 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north at east located at apt 6b, 6th story, 1st apartment from east at south
Jun 28, 2023 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective intercom system at north wall in the kitchenette located at apt 6b, 6th story, 1st apartment from east at south
Jun 28, 2023 · Apt 6B
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door stopper installed at vestibule door , 1st story
Aug 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Jul 28, 2022 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak around window east wall in the 1st room from east at north located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window east wall in the 1st room from east at north located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak around window east wall in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak around window south wall in the 3rd room from east located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window south wall in the 3rd room from east located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
May 13, 2022 · Apt 6B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 12, 2021
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at window header in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at south
Feb 23, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell/buzzer intercom system from the front of the building, at north wall in the foyer located at apt 6b, 6th story, 1st apartment from east at south
Feb 23, 2021 · Apt 6B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 6b, 6th story, 1st apartment from east at south
Jan 13, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
Jan 13, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
Jan 13, 2021 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
Jan 13, 2021 · Apt 6B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 6b, 6th story, 1st apartment from east at south
Dec 2, 2020 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 6b, 6th story, 1st apartment from east at south
Dec 2, 2020 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower sash at window in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at south
Dec 2, 2020 · Apt 6B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the 1st bathroom from east located at apt 6b, 6th story, 1st apartment from east at south
Dec 2, 2020 · Apt 6B
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 26, 2017
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of condensation between double insulated glass at first window at south in the 4th room from east at south located at apt 6b, 6th story, 1st apartment from east at south
Jul 26, 2017 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard in the entrance located at apt 6b, 6th story, 1st apartment from east at south
Jul 26, 2017 · Apt 6B
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 6b, 6th story, 1st apartment from east at south
Jul 26, 2017 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system located at apt 6b, 6th story, 1st apartment from east at south
Jul 26, 2017 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; located at apt 6b, 6th story, 1st apartment from east at south
Jul 26, 2017 · Apt 6B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Jul 22, 2017 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 3a, 3rd story, 2nd apartment from east at south
Jul 22, 2017 · Apt 3A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Jul 22, 2017 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Jul 22, 2017 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Jul 22, 2017 · Apt 3A
Closed — Violation closed - ANon-hazardous
Refit the lower sash window at west in the kitchen located at apt 6b, 6th story, 1st apartment from south at west
Dec 13, 2015 · Apt 6B
Closed — Violation closed
DOB building violations · 20
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2011
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 29, 2007
Vw*-violation - work w/o permit dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 22, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 8, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 14, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 1, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 26
- Class - 2
(1) communication in-car inoperative. (2) misaligned cab mirror. (3) provide missing tampered screw for car station. (4) secure open electrical fixture top of car. (5) provide signage for mr. (6) expired brake
Oct 16, 2026 · Penalty $625
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Mar 17, 2021 · Penalty $1,250
Active - Class - 2
42b10,05d10,41b07 42b10 removed jumped fulses on controller 05d10 repair door zone restrictor 41b07 provide proper door lock for machine room door.
Jan 19, 2017
Resolve - Class - 2
05x10/ 05-x-10 repair door zoze lock
Apr 7, 2014 · Penalty $250
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. observed supported scaffold at exp 4 removed w.o a permit or notification to dob. stop work order issued 9/14/2009. remedy: comply with swo & ob
Jan 22, 2010 · Penalty $4,800
Resolve - Class - 1
Work w/o a permit no scaffold permit appx 55'high supported scaffold has been erected on exposure 3 w/o any permit workers are working on the scaffold rem; stop all work on scaffold obtain permit
Jan 16, 2010 · Penalty $1,600
Resolve - Class - 1
Bc314.4.5 modifying and removing supported scaffold more than 40'ht w/o required training cert observed an appx 55'high pipe scaffold being dismantle no worker has scaffold training cert upon request at time of
Jan 16, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to institute maintain safety equipment no handrails on stairwell observed on 1st fl the handrail of 2 stair cases are missing rem: provide handrail
Jan 16, 2010 · Penalty $1,000
Resolve - Class - 2
Bc3303.5.1 failure to remove combustible waste materials as per fire code observed a pile of debris materials wooden pieces are kept on the construction site the combustible materials are not stored in a non co
Jan 16, 2010
Resolve - Class - 2
Failure to provide approved plans at jobsite at time of insp 7story bldg is under construction workers are working on scaffolding elevator is not in readiness no standpipe for fdny is provided upon request no a
Jan 16, 2010
Resolve
Show 16 more ↓
- Class - 1
Erected supported scaffold 40' or higher w/o a permitt. observed a 70'+ ht supported scaffold erected at exp 2 of above address on a roof w/o a permit. remedy: obtain a permit.
Sep 14, 2009 · Penalty $1,200
Resolve - Class - 2
Sidewalk shed erected at exps 1 and 4 under permit #402320270 does notmeet dob code specifications. observed at exp 4 a section of parapet enclosure missing and inoperative light fixtures. missing vandal-proof
Sep 14, 2009 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not meet dob code specifications observed sidewalk shed erected under permit #402320270 does not meet dob specifications a) missing 2 continuous bracings b) bracing at exp#4 bend c) inoperati
Dec 11, 2008 · Penalty $2,400
Resolve - Class - 2
Failure to post sign at sidewalk shed erected under permit #402320270 rem: post sign
Dec 11, 2008 · Penalty $400
Resolve - Class - 2
Work does not conform to approve plans. noted on(2nd per structures) framing. added column and beams not shown on plan. also elevator shaft location not as per plan. c-joist(detail) not shown on plan. job #4023
Sep 17, 2008 · Penalty $2,500
Resolve - Class - 2
Failure to obtain fdny permit for the use & storage of combustible mixtures & compressed gases on the construction site.note:welding operations of steel beam & columns using oxygen & acetylene was in progress
Aug 15, 2008
Resolve - Hazardous
Failure to provide approved plans at premises at time of inspection nb 402390685 no plans provide at time or inspection 3 men working stop all work make site safe remedy: provide plans contact this office
Dec 27, 2007
Resolve - Hazardous
Failure to safeguard public & property affected by construction/demo operations upon inspection at said site noticed container(6'h x 8'w x 20'l) on the street at curb side unprotected. there are no barricades
Oct 9, 2007 · Penalty $1,000
Resolve - Non-hazardous
Failure to safeguard public & property affected by construction/demolition operations. upon inspection at said site (88-02 rockaway bch blvd) noticed 2 containers on the street at curbside unprotected there are
Sep 26, 2007
Resolve - Hazardous
Failure to safeguard public & property affected by construction/demo operation. upon inspection at the said site noticed a 20'l x 8'h container on 88 st (beach) & rockaway beach blvd. unprotected w/o barrier
Aug 27, 2007 · Penalty $1,000
Resolve - Non-hazardous
Work w/o a permit. expired permit sidewalk shed installed at premises under alt 3 # 402320270 which expired 12/31/06.remedy:renew permit.
Mar 16, 2007 · Penalty $250
Resolve - Non-hazardous
Failure to post permit for work at premises. no permit posted at premises alt2 #402366701, alt3 # 402320270.remedy:post permit for work at premises.
Mar 16, 2007 · Penalty $130
Resolve - Non-hazardous
Failure to safeguard public & property affected by construction operations.noted:6'high security gates at rear detached & collapsed,allowingunauthorized entry to construction site,w/parts of exterior walls remo
Mar 6, 2007
Resolve - Non-hazardous
Failure to safeguard public & property affected by construction operations.noted:at rear of bldg,security gates completely collapsed,allowing unauthorized entry into construction site w/ parts of exterior walls
Feb 16, 2007
Resolve - Hazardous
Failure to safely & properly remove material/debris from construction site. construction debris from interior demolition @ above address store up @ rear yard blocking egress from adj. bldg #88-08.
Jun 19, 2006 · Penalty $500
Resolve - Non-hazardous
Failure to maintain. defect noted: awnings metal/canvas type approx. 4' x 5' x 2'h collapsed onto public sidewalk and approx. 4' x 15' x 2'hawning loose/hanging over a public sidewalk (1st flr level) also noted
Jan 18, 2006 · Penalty $350
Resolve
Complaints
- Door/window
Window frame
Mar 16, 2026 · Apt 4A
Close - Water leak
Heavy flow
Mar 6, 2026 · Apt 3A
Close - Water leak
Slow leak
Feb 24, 2026 · Apt 3A
Close - Door/window
Window frame
Feb 7, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 3B
Close - Electric
Power outage
Feb 6, 2026 · Apt 3B
Close - Door/window
Window frame
Feb 6, 2026 · Apt 3B
Close - Door/window
Door
Jan 27, 2026 · Apt 4A
Close - Door/window
Window frame
Jan 27, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 3A
Close
Show 40 more ↓
- Door/window
Window frame
Dec 31, 2025 · Apt 4A
Close - Door/window
Door frame
Dec 14, 2025 · Apt 4A
Close - Door/window
Window frame
Dec 14, 2025 · Apt 4A
Close - Door/window
Window frame
Nov 27, 2025 · Apt 4A
Close - Door/window
Door frame
Nov 17, 2025 · Apt 4A
Close - Door/window
Window frame
Nov 17, 2025 · Apt 4A
Close - Door/window
Window frame
Apr 9, 2025 · Apt 4A
Close - Door/window
Window frame
Mar 8, 2025 · Apt 4A
Close - Door/window
Door
Feb 19, 2025 · Apt 4A
Close - Door/window
Window frame
Feb 19, 2025 · Apt 4A
Close - Door/window
Window frame
Feb 13, 2025 · Apt 4A
Close - Door/window
Door
Feb 13, 2025 · Apt 4A
Close - Door/window
Door
Feb 9, 2025 · Apt 4A
Close - Door/window
Door
Jan 29, 2025 · Apt 4A
Close - Door/window
Window frame
Jan 29, 2025 · Apt 4A
Close - Door/window
Door frame
Jan 2, 2025 · Apt 4A
Close - Door/window
Window frame
Jan 2, 2025 · Apt 4A
Close - Water leak
Slow leak
Jan 13, 2024 · Apt 3A
Close - Unsanitary condition
Mold
Jan 13, 2024 · Apt 3A
Close - Water leak
Heavy flow
May 1, 2023 · Apt 6B
Close - Door/window
Window frame
May 1, 2023 · Apt 6B
Close - Flooring/stairs
Floor
May 1, 2023 · Apt 6B
Close - Safety
Fire escape
Feb 6, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 5, 2023 · Apt 3A
Close - Water leak
Heavy flow
Apr 19, 2022 · Apt 6B
Close - Unsanitary condition
Mold
Apr 19, 2022 · Apt 6B
Close - Water leak
Damp spot
Sep 29, 2021 · Apt 6B
Close - Unsanitary condition
Mold
Sep 29, 2021 · Apt 6B
Close - Door/window
Window frame
Sep 29, 2021 · Apt 6B
Close - Door/window
Window frame
Feb 10, 2021 · Apt 6B
Close - General
Bell/buzzer/intercom
Feb 10, 2021 · Apt 6B
Close - Door/window
Window frame
Feb 10, 2021 · Apt 6B
Close - Appliance
Electric/gas range
Feb 10, 2021 · Apt 6B
Close - Safety
Window guard broken/missing
Nov 30, 2020 · Apt 6B
Close - Water leak
Slow leak
Nov 30, 2020 · Apt 6B
Close - Heat/hot water
Apartment only
Feb 9, 2019 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 29, 2019 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 11, 2019 · Apt 3A
Close - Heat/hot water
Apartment only
Nov 29, 2018 · Apt 3B
Close - Heat/hot water
Apartment only
Oct 12, 2018 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1957
- Floors
- 7
- Residential units
- 19
- Building area
- 21,975 ft²
- Lot area
- 6,102 ft²
- Zoning
- R5D
- Community board
- 414
- Council district
- 32
- Block / lot
- 16123 / 86
- Assessed value
- $959,400
- Landmark / historic district
- No
HPD registration #431206, last renewed Jul 23, 2025.
Questions about 88-02 Rockaway Beach Blvd
Who owns 88-02 Rockaway Beach Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Ocean Terrace 8802 LLC.
Does 88-02 Rockaway Beach Blvd have violations?
Yes. NYC HPD has recorded 62 housing violations at this property.
Is 88-02 Rockaway Beach Blvd rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 88-02 Rockaway Beach Blvd built?
City records list 1957 as the year it was built.
How many apartments are in 88-02 Rockaway Beach Blvd?
It has 19 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.