398 Beach 13 Street
Queens, NY 11691BBL 4-15614-0107Map
Owner of record: 398 Beach 13 LLC
398 Beach 13 Street is a walk-up apartment building built in 1931 in Queens, 11691. It has 6 residential units across 3 floors. The owner of record is 398 Beach 13 LLC. HPD has recorded 30 housing violations here, most recently on September 28, 2017. 3 of the 30 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 30
- DOB violations
- 11
- ECB violations
- 6
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 3, 2nd story
Sep 28, 2017 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective chipped enamel and porcelain finish bathtub interior in the bathroom located at apt 3, 2nd story
Sep 28, 2017 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the broken or defective top and bottom sash south window in the west living-room located at apt 3, 2nd story
Sep 28, 2017 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective top and bottom window sash in the kitchen located at apt 3, 2nd story
Sep 28, 2017 · Apt 3
Open — Nov sent out - BHazardous
Replace with new the broken or defective washbasin cabinet. in the bathroom located at apt 3, 2nd story
Mar 29, 2017 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of discarded radiator at public hall, 1st story
Feb 25, 2017
Closed — Violation dismissed - BHazardous
Replace with new the missing cap at newel post at balustrade at public hall, 2nd story
Feb 25, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the 1st living room from north at west located at apt 3, 2nd story, apartment at south
Mar 24, 2016 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... and mildew on west wall and south wall 96 in the 1st living room from north at west located at apt 3, 2nd story, apartment at south
Mar 24, 2016 · Apt 3
Open — Nov certified late - BHazardous
Replace with new the broken or defective door in the bathroom located at apt 3, 2nd story
May 20, 2015 · Apt 3
Closed — Violation closed
Show 20 more ↓
- BHazardous
Replace with new the broken or defective window glass lower sash in the west living-room located at apt 3, 2nd story
May 20, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood and vinyl floor tiles. in the kitchen located at apt 3, 2nd story
May 20, 2015 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings & walls throughout in the entire apartment located at apt 3, 2nd story
May 4, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly secure the loose radiator in the bathroom located at apt 3, 2nd story
May 4, 2015 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Mar 9, 2015
Closed — Violation closed - BHazardous
Replace with new the broken or defective sink cabinets. in the kitchen located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective wash basin in the bathroom located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly secure the loose radiator in the bathroom located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak water leak wall and ceiling. in the bathroom located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls. in the bathroom located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective the ceramic tile floor. in the bathroom located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector which is defective. in the entire apartment located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the entire apartment located at apt 3, 2nd story, apartment at south
Mar 1, 2015 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from east located at apt 3, 2nd story, 2nd apartment from north at east
Feb 22, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Feb 22, 2014 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Feb 22, 2014 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Feb 22, 2014 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story
Jan 11, 2007 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story
Jan 11, 2007 · Apt 1
Closed — Violation closed - ANon-hazardous
File with this department a registration statement for building.
May 2, 2001
Closed — Violation closed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 3
3/b354/50-flu for the 6 hot water heats must enter chimney above oil boiler flu
Feb 4, 2011
Resolve - Class - 3
Fail to maintain bldg in code complaint manner:service equip boiler noted@ cellar level boiler rm has penetrations @ walls & ceiling.also penetrations evident @ various cellar ceiling sheetrock.rem:maintain
Dec 2, 2009
Resolve - Class - 2
Work w.o permit. work noted: at cellar level at boiler room new copperwater lines evident & new vent evident. remedy: obtain permit or restore to prior legal condition.
Dec 2, 2009 · Penalty $800
Resolve - Class - 1
50a50b50c50d. 50a 6 hot water heaters that flue pipes connected to must be increased to small. 50b termination point of flu illegal must be installed to legal chimney. 50c safety relief valves not piped down
Jun 12, 2009 · Penalty $1,000
Resolve - Class - 2
7b50a50b50c. 50a oil line can not be exposed 50b must have automatic mixing valve. 50c need checks valve b/w backflow preventer and boiler.
Jun 12, 2009
Resolve - Hazardous
Occupancy contrary to that allowed by the c of o or bldg dept records.partitions erected and kitchen and bath facilities have been installedcellar changed from storage and ordinary use to an apt.
Aug 9, 1996 · Penalty $800
Resolve
Complaints
- Electric
Outlet/switch
Feb 13, 2019 · Apt 5
Close - Electric
Outlet/switch
Feb 13, 2019 · Apt 5
Close - Unsanitary condition
Pests
Feb 13, 2019 · Apt 5
Close - Plumbing
Basin/sink
Feb 13, 2019 · Apt 5
Close - Water leak
Slow leak
Mar 21, 2018 · Apt 3
Close - Paint/plaster
Ceiling
Mar 21, 2018 · Apt 3
Close - Heat/hot water
Apartment only
Nov 8, 2017 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 11, 2017 · Apt 3
Close - Appliance
Refrigerator
Sep 11, 2017 · Apt 3
Close - Plumbing
Radiator
Sep 11, 2017 · Apt 3
Close
Show 40 more ↓
- Door/window
Window frame
Sep 11, 2017 · Apt 3
Close - Appliance
Electric/gas range
Sep 11, 2017 · Apt 3
Close - Water leak
Heavy flow
Sep 11, 2017 · Apt 3
Close - Door/window
Door
Mar 28, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Mar 28, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Mar 5, 2017 · Apt 3
Close - Paint/plaster
Ceiling
Sep 28, 2016 · Apt 5
Close - Unsanitary condition
Mold
Sep 28, 2016 · Apt 5
Close - Paint/plaster
Wall
Sep 28, 2016 · Apt 5
Close - Paint/plaster
Wall
Sep 28, 2016 · Apt 5
Close - Unsanitary condition
Mold
Sep 28, 2016 · Apt 5
Close - Unsanitary condition
Mold
Feb 18, 2016 · Apt 3
Close - Unsanitary condition
Mold
Feb 18, 2016 · Apt 3
Close - Unsanitary condition
Mold
Jun 29, 2015 · Apt 5
Close - Unsanitary condition
Mold
Jun 29, 2015 · Apt 3
Close - Plumbing
Radiator
Jun 29, 2015 · Apt 3
Close - Plumbing
Radiator
Jun 11, 2015 · Apt 3
Close - General
Cabinet
May 13, 2015 · Apt 3
Close - Door/window
Window pane
May 13, 2015 · Apt 3
Close - Water leak
Heavy flow
May 13, 2015 · Apt 3
Close - Flooring/stairs
Floor
May 13, 2015 · Apt 3
Close - Water leak
Heavy flow
May 13, 2015 · Apt 3
Close - Paint/plaster
Wall
May 13, 2015 · Apt 3
Close - Paint/plaster
Wall
May 13, 2015 · Apt 3
Close - Paint/plaster
Ceiling
Apr 28, 2015 · Apt 3
Close - Plumbing
Toilet
Apr 28, 2015 · Apt 3
Close - Paint/plaster
Ceiling
Apr 28, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Apr 28, 2015 · Apt 3
Close - Plumbing
Basin/sink
Apr 28, 2015 · Apt 3
Close - Paint/plaster
Wall
Apr 28, 2015 · Apt 3
Close - Paint/plaster
Wall
Apr 28, 2015 · Apt 3
Close - Water leak
Slow leak
Apr 28, 2015 · Apt 3
Close - Plumbing
Basin/sink
Apr 28, 2015 · Apt 3
Close - Flooring/stairs
Floor
Apr 28, 2015 · Apt 3
Close - Water leak
Slow leak
Apr 28, 2015 · Apt 3
Close - Plumbing
Radiator
Apr 28, 2015 · Apt 3
Close - Plumbing
Radiator
Apr 24, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Apr 24, 2015 · Apt 3
Close - Water leak
Slow leak
Mar 16, 2015 · Apt 3
Close - Flooring/stairs
Floor
Mar 16, 2015 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,472 ft²
- Lot area
- 4,400 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 31
- Block / lot
- 15614 / 107
- Assessed value
- $357,300
- Landmark / historic district
- No
HPD registration #409764, last renewed Jul 7, 2025.
Questions about 398 Beach 13 Street
Who owns 398 Beach 13 Street?
The owner of record in NYC Department of City Planning PLUTO data is 398 Beach 13 LLC.
Does 398 Beach 13 Street have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 398 Beach 13 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 398 Beach 13 Street built?
City records list 1931 as the year it was built.
How many apartments are in 398 Beach 13 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.