88-30 182 Street
Queens, NY 11423BBL 4-09917-0013Map
Owner of record: 88 30 182nd St Realty Corp
88-30 182 Street is an elevator apartment building built in 1955 in Queens, 11423. It has 65 residential units across 6 floors. The owner of record is 88 30 182nd St Realty Corp. HPD has recorded 33 housing violations here, most recently on July 27, 2024. 25 of the 33 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.
- HPD violations
- 33
- DOB violations
- 35
- ECB violations
- 17
- HPD complaints
- 139
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flowers pots at 4th story balcony at south stack at building front at fire escape
Jul 27, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5d, 5th story, 3rd apartment from south at west
Sep 21, 2022 · Apt 5D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 3rd apartment from south at west
Sep 21, 2022 · Apt 5D
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 5d, 5th story, 3rd apartment from south at west
Sep 21, 2022 · Apt 5D
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 5d, 5th story, 3rd apartment from south at west
Sep 21, 2022 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5d, 5th story, 3rd apartment from south at west
Sep 21, 2022 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 3rd apartment from south at west
Jun 17, 2021 · Apt 5D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5d, 5th story, 3rd apartment from south at west
Jun 17, 2021 · Apt 5D
Open — Notice of issuance sent to tenant - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2019
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all fire escapes and balconies, all stories
May 9, 2019
Open — Invalid certification
Show 23 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant plaster material at ceiling , west and east walls at public hall, 6th story
Nov 3, 2018
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Nov 3, 2018
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak west and east wall at public hall, 6th story
Nov 3, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling ,west and east walls at public hall, 6th story
Nov 3, 2018
Closed — Violation dismissed - ANon-hazardous
Refit all walls cabinet doors and base cabinets doors in the kitchen located at apt 5j, 5th story, 1st apartment from north at east
Jun 20, 2018 · Apt 5J
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 5j, 5th story, 1st apartment from north at east
Jun 20, 2018 · Apt 5J
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 5j, 5th story, 1st apartment from north at east
Jun 20, 2018 · Apt 5J
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at washbasin in the bathroom located at apt 5j, 5th story, 1st apartment from north at east
Jun 20, 2018 · Apt 5J
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2k, 2nd story, 2nd apartment from north at east
Jan 6, 2018 · Apt 2K
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jan 6, 2018
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 5j, 5th story, 1st apartment from north at east
May 14, 2012 · Apt 5J
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 5j, 5th story, 1st apartment from north at east
May 14, 2012 · Apt 5J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east at south located at apt 5j, 5th story, 1st apartment from north at east
May 14, 2012 · Apt 5J
Open — Nov sent out - BHazardous
Replace with new the missing terra cotta coping at northwest corner parapet wall roof.
May 14, 2012
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors at bulk head to roof
May 14, 2012
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of tree branches on northwest rear fire escape
May 14, 2012
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of water leaks northwall and ceiling in the bathroom located at apt 5j, 5th story
Nov 12, 2010 · Apt 5J
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 5j, 5th story
Nov 12, 2010 · Apt 5J
Open — Not complied with - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and northwall in the bathroom located at apt 5j, 5th story
Nov 12, 2010 · Apt 5J
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective - tested by inspector located at apt 3e, 3rd story, 4th apartment from south at west
Oct 15, 2008 · Apt 3E
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3e, 3rd story, 4th apartment from south at west
Aug 4, 2008 · Apt 3E
Open — Not complied with - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling at 3 sty apt 3l front room tenant ms menaro 291 9339 er1. , section '' ''
Oct 24, 1990 · Apt 3L
Open — Defect letter issued
DOB building violations · 35
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 19, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Jun 18, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Jun 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 22, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2017
Dob violation - resolved
Show 25 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 16, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 1994
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 1993
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Elevator elevatorrequired
(47)window (50)to moto room (51)repair light fixture under car (52)file a bn for refurnished cab and have same tested by this dept
May 13, 1989
Dob violation - resolved
ECB violations · 17
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #913565. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Resolve - Class - 1
Door zone restrictor defective not working. the car door can be opened outside of the landing zone(cu).
Jan 13, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.at rear of premise and 8ft plywood fence with door has been pad locked unobstructing passageway from rear fire escapes.rem:remove obstructions.
Jun 24, 2020 · Penalty $312
Resolve - Class - 1
Failure to take provide safety measure such as sidewalk sheds fence etc where required to protect & secure public safety from documented"unsafe"facade as per/ra on 1-22-18. complaint#4720295 unsafe facade & as
Jan 26, 2018 · Penalty $2,400
Resolve - Class - 2
Wrk w/out permit.wrk noted:at apt"6l";erected full partition with doorcreated room.room has 3 ventelation openings approx:2.5(ft)(w)x 1.0 ft(l) and glass window approx:1.5ft(w)x 3ft(l).install electrical wiring
Sep 26, 2016 · Penalty $400
Resolve - Class - 2
67x10,40d06,52b06,61m07,100m07,42q03. 67x- emergency phone inoperable.40d- properly secure smoke grating hole in motor room flr. 52b- securecables' guard. 61m- knock out on top of a box. 100m- provide print for
Aug 1, 2012 · Penalty $500
Resolve - Class - 2
67x10,70o02,100b11,40p16: (67x10)in car emergency phone inoperative;(100b11)provide mini 21' toe guard as per appendix k;
Dec 13, 2011
Resolve - Class - 2
14m07 97e01 71x10 70o02 60q03 67-eliminate scraping noise btwn 1st floor and bsmt
Oct 13, 2010 · Penalty $500
Resolve - Class - 2
14m7.98u5.100e1.100e1 scrapping noise from bsmt to lobby
Feb 23, 2010 · Penalty $2,500
Resolve - Class - 2
98m05
Aug 26, 2009 · Penalty $500
Resolve
Show 7 more ↓
- Class - 3
Failure to maintain building wall(s) or appurtenances (exterior). noted: at fire escape in front of the bldg adjacent hillside ave observed some flower plants. remedy: maintain bldg properly. remove any ite
Jul 8, 2009 · Penalty $500
Resolve - Non-hazardous
39,p,07 66,o,02 39p07 leave key on premise to roof mr
Jul 3, 2003 · Penalty $180
Resolve - Non-hazardous
35p17.
May 14, 2002
Resolve - Non-hazardous
75u5/11q3/8v1/74d6/5j1/58o2/59o2/9h12/ 74 properly secure hand rail 5 adjust cab door
Feb 4, 2002
Resolve - Non-hazardous
39h08-emeven wear.
Jul 18, 2000 · Penalty $2,500
Resolve - Non-hazardous
73o34d55l22d08j35p 35-no key for lock on door.
Nov 28, 1997 · Penalty $180
Resolve - Non-hazardous
03-r, 35-p, 57o, 62-l, 74-l, 3)- cab interior installed without a per-mit. 62) ight fixtures. 74) motor room window.
Jan 25, 1991
Resolve
Complaints
- Plumbing
Water supply
Aug 22, 2025 · Apt 5A
Close - Plumbing
Toilet
Jul 2, 2024 · Apt 4H
Close - Heat/hot water
Entire building
Jan 31, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 25, 2022 · Apt 5D
Close - Unsanitary condition
Pests
Aug 25, 2022 · Apt 5D
Close - Unsanitary condition
Pests
Jul 28, 2022 · Apt 5D
Close - Unsanitary condition
Pests
Jul 28, 2022 · Apt 5D
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2021 · Apt 5A
Close - Unsanitary condition
Pests
Jun 15, 2021 · Apt 5D
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 31, 2020 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 1, 2020 · Apt 4H
Close - Unsanitary condition
Pests
Sep 24, 2019 · Apt 3F
Close - Unsanitary condition
Pests
Sep 24, 2019 · Apt 3F
Close - Safety
Fire escape
May 8, 2019 · Apt BLDG
Close - Door/window
Door
Nov 12, 2018 · Apt 6L
Close - Water leak
Heavy flow
Oct 12, 2018 · Apt 6THFL
Close - Plumbing
Bathtub/shower
Jun 9, 2018 · Apt 5J
Close - Plumbing
Basin/sink
Jun 9, 2018 · Apt 5J
Close - Door/window
Door frame
Jun 9, 2018 · Apt 5J
Close - Paint/plaster
Ceiling
Jun 9, 2018 · Apt 5J
Close - Paint/plaster
Wall
Jun 9, 2018 · Apt 5J
Close - General
Cabinet
Jun 9, 2018 · Apt 5J
Close - Appliance
Refrigerator
Jun 9, 2018 · Apt 5J
Close - Door/window
Window frame
Jun 9, 2018 · Apt 5J
Close - Heat/hot water
Entire building
Jan 4, 2018 · Apt 2K
Close - Heat/hot water
Entire building
Mar 15, 2017 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 31, 2016 · Apt 1FL
Close - Heat/hot water
Entire building
Jan 18, 2016 · Apt 6C
Close - Heating
Heat related
Feb 28, 2014 · Apt NA
Close - Paint/plaster
Wall
Feb 26, 2014 · Apt 5D
Close - General
Mold
Feb 26, 2014 · Apt 5D
Close - General
Mold
Feb 26, 2014 · Apt 5D
Close - Heating
Heat related
Jan 24, 2014 · Apt NA
Close - Heating
Heat related
Jan 24, 2014 · Apt 2G
Close - Paint/plaster
Ceiling
Dec 11, 2011 · Apt 5J
Close - Paint/plaster
Ceiling
Dec 11, 2011 · Apt 5J
Close - Paint/plaster
Ceiling
Dec 11, 2011 · Apt 5J
Close - Plumbing
Basin/sink
Dec 11, 2011 · Apt 5J
Close - Plumbing
Bathtub/shower
Dec 11, 2011 · Apt 5J
Close - Plumbing
Basin/sink
Dec 11, 2011 · Apt 5J
Close - Plumbing
Water-leaks
Dec 11, 2011 · Apt 5J
Close - Plumbing
Water-leaks
Dec 11, 2011 · Apt 5J
Close - Plumbing
Water-leaks
Dec 11, 2011 · Apt 5J
Close - General
Locks
Dec 11, 2011 · Apt 5J
Close - Plumbing
Water supply
Oct 24, 2010 · Apt 5J
Close - Appliance
Electric/gas range
Oct 24, 2010 · Apt 5J
Close - Paint/plaster
Ceiling
Mar 16, 2010 · Apt 5A
Close - Plumbing
Water-leaks
Mar 16, 2010 · Apt 5A
Close - Plumbing
Water-leaks
Mar 16, 2010 · Apt 5A
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 24, 2026 | $121,200 | Coops - elevator apartments | — |
| Sep 10, 2026 | $132,000 | Coops - elevator apartments | — |
| Jul 20, 2026 | $220,000 | Coops - elevator apartments | — |
| Jun 4, 2026 | $290,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1955
- Floors
- 6
- Residential units
- 65
- Building area
- 58,146 ft²
- Lot area
- 14,935 ft²
- Zoning
- R4-1
- Community board
- 412
- Council district
- 23
- Block / lot
- 9917 / 13
- Assessed value
- $2,991,150
- Landmark / historic district
- No
HPD registration #400926, last renewed Sep 6, 2025.
Questions about 88-30 182 Street
Who owns 88-30 182 Street?
The owner of record in NYC Department of City Planning PLUTO data is 88 30 182nd St Realty Corp.
Does 88-30 182 Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 88-30 182 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 9% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 88-30 182 Street built?
City records list 1955 as the year it was built.
How many apartments are in 88-30 182 Street?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.