88-23 179 Street
Queens, NY 11432BBL 4-09914-0027Map
Owner of record: 179 St Realty LLC
88-23 179 Street is a walk-up apartment building built in 1939 in Queens, 11432. It has 14 residential units across 3 floors. The owner of record is 179 St Realty LLC. HPD has recorded 73 housing violations here, most recently on March 1, 2026. 4 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 73
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 74
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balconies west stack building front at fire escape, 2nd story
Mar 1, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at yard door north wall at public hall, 1st story
Mar 1, 2026
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Jun 5, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story
Apr 7, 2024
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Apr 7, 2024
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story
Apr 7, 2024
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of street entrance door locked preventing ready access to intercom in vestibule
Feb 27, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 2, 2024 · Apt 3C
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 2, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet continuous water running at water closet in the bathroom located at apt 3c, 3rd story, 2nd apartment from north at east
Feb 2, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 1st closet from east at south wall door, south wall in the foyer located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the private hallway located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at north located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 1st door from south at west wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall, 1st radiator from north at east wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at north located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall in the 1st room from east at north located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash spring balance at 1st window from east at south wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the bathroom located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 1st room from east at north located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from west at north wall door frame, 1st door frame from south at west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from east located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st closet from east at south wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, north wall in the foyer located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the kitchen located at apt 1c, 1st story, 2nd apartment from north at east
Feb 1, 2024 · Apt 1C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall vestibule at public hall, 1st story
Nov 26, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at west wall vestibule at public hall, 1st story
Nov 26, 2023
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stacks and members at north 1 and north 2 fire escapes at building front
Aug 5, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling around skylight at public hall, 3rd story
Jul 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door leading to roof at public hall, 3rd story
Jul 7, 2023
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of door bells inaccessible at building front entrance door at public hall, 1st story
Jul 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at vestibule door at public hall, 1st story
Jul 7, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at vestibule door at public hall, 1st story
Feb 5, 2023
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yard
Jul 24, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door to north yard at public hall, 1st story
Jul 24, 2022
Closed — Violation dismissed - ANon-hazardous
Refit fire door to north yard at public hall, 1st story
Jul 24, 2022
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
May 14, 2026 · Apt 2E
Open - Plumbing
Water supply
Feb 26, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 3C
Close - Heat/hot water
Entire building
May 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 27, 2024 · Apt DRDD
Close - Heat/hot water
Entire building
Apr 6, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 1, 2024 · Apt 123
Close - Heat/hot water
Apartment only
Apr 1, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Feb 26, 2024 · Apt GGG
Close - Heat/hot water
Apartment only
Feb 26, 2024 · Apt BASEM
Close - Heat/hot water
Entire building
Feb 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2024 · Apt BLDG
Close - Plumbing
Water supply
Feb 2, 2024 · Apt BLDG
Close - Plumbing
Water supply
Feb 2, 2024 · Apt 3C
Close - Electric
Power outage
Feb 1, 2024 · Apt 1C
Close - Plumbing
Water supply
Feb 1, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 31, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 23, 2023 · Apt BLDG
Close - General
Bell/buzzer/intercom
Nov 13, 2023 · Apt 3C
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Plumbing
Water supply
Aug 26, 2023 · Apt BLDG
Close - Plumbing
Water supply
Aug 26, 2023 · Apt WHOLEB
Close - Heat/hot water
Entire building
Aug 26, 2023 · Apt 3C
Close - Plumbing
Water supply
Aug 26, 2023 · Apt 2D
Close - Door/window
Door
Aug 8, 2023 · Apt 3C
Close - Door/window
Door
Aug 8, 2023 · Apt 3C
Close - Door/window
Door
Aug 1, 2023 · Apt BLDG
Close - Plumbing
Water supply
Jul 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Plumbing
Water supply
Sep 30, 2022 · Apt 2D
Close - Plumbing
Water supply
Sep 30, 2022 · Apt 2D
Close - Heat/hot water
Entire building
Sep 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2022 · Apt BLDG
Close - Door/window
Door
Jul 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2021 · Apt 3E
Close - Door/window
Door
Jul 7, 2021 · Apt BLDG
Close - Door/window
Door
May 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
May 20, 2021 · Apt 3C
Close - Unsanitary condition
Mold
Oct 21, 2020 · Apt 3E
Close - Plumbing
Bathtub/shower
Oct 21, 2020 · Apt 3E
Close - Heat/hot water
Entire building
Dec 29, 2018 · Apt 3E
Close - Appliance
Electric/gas range
Oct 29, 2018 · Apt 3E
Close - Heat/hot water
Entire building
Oct 25, 2016 · Apt 3E
Close - General
Bell/buzzer/intercom
Jun 19, 2014 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1939
- Floors
- 3
- Residential units
- 14
- Building area
- 11,930 ft²
- Lot area
- 5,500 ft²
- Zoning
- R4-1
- Community board
- 412
- Council district
- 23
- Block / lot
- 9914 / 27
- Assessed value
- $532,350
- Landmark / historic district
- No
HPD registration #402002, last renewed Jul 3, 2025.
Questions about 88-23 179 Street
Who owns 88-23 179 Street?
The owner of record in NYC Department of City Planning PLUTO data is 179 St Realty LLC.
Does 88-23 179 Street have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 88-23 179 Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 100% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 88-23 179 Street built?
City records list 1939 as the year it was built.
How many apartments are in 88-23 179 Street?
It has 14 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.