roofy

91-17 172 Street

Queens, NY 11432BBL 4-09808-0014Map

Owner of record: Dynamic 9117 LLC

91-17 172 Street is a walk-up apartment building built in 1931 in Queens, 11432. It has 16 residential units across 4 floors. The owner of record is Dynamic 9117 LLC. HPD has recorded 237 housing violations here, most recently on June 10, 2026. 39 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.

HPD violations
237
DOB violations
10
ECB violations
24
HPD complaints
266

What to know

Concern
18 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
9
About 56% of the building's 16 apartments
Down from 16 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 237

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the kitchen located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, south wall in the kitchen located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from east at south wall, east wall, west wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the 3rd room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower sash spring balance at the 1st window from north at east in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective upper sash spring balance at the 1st window from west at north in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective upper sash spring balance at the window at east in the bathroom located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower sash spring balance at the 1st, 2nd, and 3rd window at east in the 3rd room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower sash spring balance at the window at east in the kitchen located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective procelain glaze at bathtub in the bathroom located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , north wall, north wall, 1st closet from east at south wall door in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , north wall, north wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , 1st closet from north at east wall door frame, 1st closet from north at east wall door frame in the private hallway located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , baseboard at west wall, baseboard at east wall, baseboard at west wall, baseboard at east wall in the 3rd room from north located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , east wall, west wall, east wall, west wall in the kitchen located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from east at south wall, east wall, west wall in the private hallway located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 10, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 3rd room from east at south located at apt 2a, 2nd story, 1st apartment from south at west

    Jan 29, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west

    Jan 29, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective upper sash spring balance at 2nd window from south at west wall in the 3rd room from east at south located at apt 2a, 2nd story, 2nd apartment from south at west

    Nov 28, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from north at east wall, 1st door frame from south at west wall in the private hallway located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from east at south located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Defect letter issued
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 3rd room from east at south located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door, 1st door from south at west wall, 1st closet from west at north wall wall in the private hallway located at apt 2a, 2nd story, 2nd apartment from south at west

    Oct 21, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower sash lock at the 1st window from east at south in the 2nd room from east at north located at apt 2a, 2nd story, 2nd apartment from north at east

    Sep 19, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective 1st window from east at south upper sash spring balance in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Sep 19, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective closet door at the south in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east

    Sep 19, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Sep 19, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Sep 19, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west

    Jul 27, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Replace with new the missing door saddle at entrance in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west

    May 13, 2025 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway located at apt 2a, 2nd story, 2nd apartment from south at west

    May 13, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west

    May 13, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective bottom interior stop at 1st window from north at east wall in the 3rd room from east at north located at apt 2a, 2nd story, 2nd apartment from south at west

    May 13, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west

    May 13, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at bulkhead door to roof

    May 12, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west

    Mar 12, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west

    Mar 12, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2a, 2nd story, 2nd apartment from south at west

    Mar 12, 2025 · Apt 2A

    Open — Not complied with

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 2, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. observed several cracks at exposure #1 of the masonry facade from the 2nd floor to the parapet wall

    Jul 21, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Erect sidewalk shed

    Jul 21, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 24

  • Class - 1

    Permanent dwelling used/converted for other than permanent residentialpurposes. department of building records indicates building to be a class a multiple dwelling. noted at unit 23 been used/converted and occu

    Jul 22, 2026 · Penalty $57,530

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of required number of means of egress for every floor per bc 1018.1 27-366, bc 1021.1 bc 1006.3 for transient use at unit 2b. previous violation 35725

    Jul 22, 2026 · Penalty $6,280

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of a system of automatic sprinkler where is required for bc 903.2; 27-954 for transient use in unit 2b. previous violation 35726025r. remedy: disconti

    Jul 22, 2026 · Penalty $6,280

    Active
  • Class - 1

    Bc 907.2.8. failure to provide a fire alarm system of transient use atunit 2b. previous violation 35726026z. remedy: discontinue illegal use.

    Jul 22, 2026 · Penalty $6,280

    Active
  • Class - 2

    28-301.1. failure to maintain building in code-compliant manner. notedsidewalk shed not illuminated as per code bc 3307.6.4.8. noted 2 of the 4 light fixture not in working condition at fye 1. remedy: repair an

    Jul 22, 2026 · Penalty $1,280

    Active
  • Class - 2

    Permanent dwelling used/converted for other than permanent residentialpurposes.dob records indicates building to be legally approved as a class a multiple dwelling now apartment#1c on 1st floor has been used/co

    Apr 2, 2026 · Penalty $2,530

    Active
  • Class - 1

    Failure to maintain building in code compliant manner.lack of requirednumber of means of egress for every floor per bc 1018.1(2008 code);27-366,102.1(2014 code);bc 1006.3(2022 code)for transient use at apartmen

    Apr 2, 2026 · Penalty $2,530

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner,failure to provide a system of automaitc sprinklers where is required as per bc 903.2 and 27-954 for transient use at apartment#1c on 1st floor.rem:disconti

    Apr 2, 2026 · Penalty $2,530

    Active
  • Class - 1

    Bc 907.2.8 failure to provide required class j fire alarm system for transient use at apartment#1c on 1st floor.rem:discontinue illegal occupancy.

    Apr 2, 2026 · Penalty $2,530

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner for summons 39119517y. at exposure 1, the front masonry facade is defective with cracks, bulging bricks, and missing mortar at various locations from the 2n

    Nov 26, 2025 · Penalty $25,000

    Active
Show 14 more ↓
  • Class - 1

    Failure to maintain building: the front masonry facade is defective with cracks bulging loose mortar in varoius locations from the 2nd floor to roof at time of inspection, repair and/replace; provide overhead p

    Jul 21, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35164578p issued on 12/08/16 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary to t

    Aug 21, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio #35164578p issued on 12/08/16 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for occupancy contrary by creating an illegal class

    Jul 5, 2017 · Penalty $800

    Resolve
  • Class - 1

    Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35164577n issued on 12-8-16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. at cellar level rar of premises,erected full

    Jun 1, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35164578p issued on 12/08/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    May 13, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/ io # 35164578n issued on 12/08/16 & to file a c of c pursuant to 28-2 1.1 & 1rcny 102-01. work w/o a permit. noted: @ cellar level plumbing

    Mar 21, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/ io # 35164578p issued on 12/08/16 & to file a c of c pursuant to 28-2 1.1 & 1rcny 102-01. failure to file a c of o. remedy: comply with com

    Mar 21, 2017 · Penalty $800

    Resolve
  • Class - 2

    Occupancy contrary to dob records. failure to comply w/the comm's order contained in summons/vio#35164578p issued on 12-18-16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded.

    Jan 21, 2017 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by dob records. note: hpd mdr# 401273 indicate above premises to be 4 story w/ 16 dwelling units 4 on each flr & 0 in the cellar. @ time of insp observed illegal class 'a' apt

    Dec 8, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Work w.o a permit.note:@cellar level (rear)of above premises full height partition walls were erected new plumbing lines were installed along w.electrical lines to create a class"a" apt w. living room,bedroom 3

    Dec 8, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. defected. primany egress, public hallway at 1sty lobby pandially obstructed by plywood 4'x8' sheets and several 4x8' sheets of sheek rock at time of inspec

    Nov 4, 2011

    Resolve
  • Class - 1

    Sec 28-201.1 failure to comply w/ an order of the comms to obtain permits for at bsmt installed partitions and water & waste lines w/ gas lines as per #34722252m rem: obtain dob permits

    May 27, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Work w/o permit. work noted: at basement erected full partitions & installed water & waste lines for a 3 pc bathroom (sink toilet tub) & residential sink w/gas line for stove at kitchen. remedy: obtain permit

    Nov 20, 2008 · Penalty $1,600

    Resolve
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. dob records indicate residence as a 16 family residence now altered as a 17 family. alteration work noted: at

    Nov 20, 2008 · Penalty $1,200

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Aug 11, 2026 · Apt 2C

    Open
  • Paint/plaster

    Wall

    Jun 10, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Jun 10, 2026 · Apt 2C

    Close
  • Plumbing

    Radiator

    Jun 10, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Jun 10, 2026 · Apt 2C

    Close
  • Door/window

    Window frame

    Jun 10, 2026 · Apt 2C

    Close
  • Plumbing

    Bathtub/shower

    Jun 10, 2026 · Apt 2C

    Close
  • Plumbing

    Bathtub/shower

    May 14, 2026 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    May 14, 2026 · Apt 2C

    Close
  • Plumbing

    Steam pipe/riser

    May 14, 2026 · Apt 2C

    Close
Show 40 more ↓
  • Door/window

    Window frame

    May 14, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    May 14, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    May 14, 2026 · Apt 2C

    Close
  • Paint/plaster

    Wall

    May 14, 2026 · Apt 2C

    Close
  • Water leak

    Slow leak

    Feb 2, 2026 · Apt 4A

    Close
  • Plumbing

    Water supply

    Feb 2, 2026 · Apt 4A

    Close
  • Plumbing

    Bathtub/shower

    Feb 2, 2026 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Jan 22, 2026 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2026 · Apt 2A

    Close
  • Safety

    Window guard broken/missing

    Jan 22, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Jan 22, 2026 · Apt 2A

    Close
  • Electric

    Wiring

    Jan 22, 2026 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Dec 24, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Dec 24, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Dec 24, 2025 · Apt 2A

    Close
  • Door/window

    Door frame

    Dec 24, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Nov 21, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Nov 21, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Nov 21, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Nov 10, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 6, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt BLDG

    Close
  • Door/window

    Window pane

    Oct 15, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Oct 15, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Oct 15, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Oct 15, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Oct 15, 2025 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Sep 18, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Sep 18, 2025 · Apt 2A

    Close
  • General

    Cabinet

    Sep 18, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Sep 18, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 18, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Sep 13, 2025 · Apt 3C

    Close
  • Plumbing

    Basin/sink

    Aug 20, 2025 · Apt 2A

    Close
  • Paint/plaster

    Cabinet

    Aug 20, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Aug 20, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Aug 20, 2025 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Jul 17, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jul 17, 2025 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1931
Floors
4
Residential units
16
Building area
14,400 ft²
Lot area
4,000 ft²
Zoning
R4-1
Community board
412
Council district
27
Block / lot
9808 / 14
Assessed value
$318,150
Landmark / historic district
No

HPD registration #401273, last renewed Sep 5, 2025.

Questions about 91-17 172 Street

Who owns 91-17 172 Street?

The owner of record in NYC Department of City Planning PLUTO data is Dynamic 9117 LLC.

Does 91-17 172 Street have violations?

Yes. NYC HPD has recorded 237 housing violations at this property.

Is 91-17 172 Street rent stabilized?

NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 56% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 91-17 172 Street built?

City records list 1931 as the year it was built.

How many apartments are in 91-17 172 Street?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.