170-14 89 Avenue
Queens, NY 11432BBL 4-09805-0054Map
Owner of record: 89 Property LLC
170-14 89 Avenue is an elevator apartment building built in 2019 in Queens, 11432. It has 10 residential units across 6 floors. The owner of record is 89 Property LLC. HPD has recorded 33 housing violations here, most recently on May 11, 2026. 7 of the 33 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 33
- DOB violations
- 0
- ECB violations
- 30
- HPD complaints
- 21
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at front entrance door to building , 1st story
Oct 13, 2025
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at front entrance door to building , 1st story
Oct 13, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective water closet bowl in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2024 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire stair door latch at public hall stairs, 2nd story
Nov 15, 2024
Closed — Violation closed - CImmediately hazardous
Remove all obstructions from water closet , in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Oct 24, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wash basin wasteline in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Oct 24, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch assembly on door in the entrance located at apt 2b, 2nd story, 1st apartment from east at south
Oct 24, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Oct 24, 2024 · Apt 2B
Open — Invalid certification
Show 23 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch door to stairway at public hall, 2nd story
Oct 24, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch assembly door to stairway at public hall, 2nd story
Oct 24, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Oct 5, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagentic locking device at vestibule door to public hall , 1st story
Jul 11, 2024
Closed — Violation dismissed - BHazardous
Provide security by means of a heavy duty lock and latch set at vestibule door to public hall , 1st story
Jul 11, 2024
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at front entrance door to building at public hall, 1st story
Jun 4, 2024
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jun 4, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at front entrance door to building at public hall, 1st story
Jun 4, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at south wall approximately 10 sq ft. in the 1st room from north located at apt 5b, 5th story, 1st apartment from east at south
Mar 28, 2024 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 5b, 5th story, 1st apartment from east at south
Mar 28, 2024 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Mar 28, 2024 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Mar 28, 2024 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... 3 square feet in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east original violation 15723065 issued 15-feb-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 15, 2023 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 3 square feet in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lower sash of window in the 2nd room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Feb 15, 2023 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 15, 2023
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 30
- Class - 1
Class 1 rts: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition
Apr 1, 2026 · Penalty $1,250
Active - Class - 1
At front of building, motor cycle partially obstructs exit passageway and ramp., remove obstruction
Feb 28, 2024 · Penalty $1,250
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at time of scheduled inspection for partial stop work order rescind re-inspection that was conducted last on 1/16/2020 badge#3075 commented "no wo
Sep 26, 2020 · Penalty $5,000
Resolve - Class - 1
Permit holder failed to ensure that each worker received site safety orientation at time of inspection on a 6 story new building ucrrently forming the bulkhead observed 5 workers on site engaging in constructio
Jan 13, 2020 · Penalty $2,500
Resolve - Class - 2
3301.13.1=inadequate site safety plan at time of inspection on a proposed 6 story building currently at roof level framing the bulkhead observed a sidewlak shed in place at exposure #1 with a supported scaffodl
Jan 13, 2020
Resolve - Class - 1
3301.2=no fall protection at time of inspection on a 6 story new building observed missing guardrial on 3rd floor balconies epxosure #3 and at roof level observed workers engaging in brick work on teh parapet w
Jan 13, 2020 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure that workers attend pre-shift safety meeting prior to commencement of work at time of inspection a proposed 6 story new building currenlt forming the bulkhead observed 5 workers o
Jan 13, 2020 · Penalty $2,500
Resolve - Class - 1
Inadequate roof protection-exposure#2 and 4.at the time of inspection on a proposed 6story building currently at bulkhead level observed inadequate roof protection in place at exposures 2 and 4. consisting of p
Nov 23, 2019 · Penalty $2,500
Resolve - Class - 2
Supported scaffold not maintained per code(exposures#1and#3)at time of inspection on proposed 6story building currently at bulkhead level observed a supported scaffold in place up to roof level at exposures #1#
Nov 23, 2019
Resolve - Class - 2
Temporray public walkway with the site.at time of inspection on a propposed 6story building currently at bulkhead level observed at exposure #1 missing protection on the gap between the fence and the sidewalk s
Nov 23, 2019
Resolve
Show 20 more ↓
- Class - 2
Bc3307.6.5.4 storage or placement of items (sidewalk shed)at time of inspection on a proposed 6story building currently at bulkhead level observed on exposure1 storage of scaffolding frames exceeding the height
Nov 23, 2019
Resolve - Class - 1
Sec. 3303.4.5.2 storage near unenclosed perimeters as noted: at time of my inspection,active site. 6 sty bldg i observed different construction materials stored within 1-3 feets from unenclosed perimeters resul
Nov 12, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation-no control access zone,no personal fall protection system. as noted at time of my inspection active site-6 sty bldg. i observed no
Nov 12, 2019 · Penalty $10,000
Resolve - Class - 1
Sec. 3308.3;3308.5 failure to provide vertical safety netting requirements. as noted: at time of my inspection,active site 6 sty bldg,failure to provide netting requirements on roof level. the netting was loose
Nov 12, 2019 · Penalty $2,500
Resolve - Class - 1
3309.2 failure to obtain license legal agreement. at time of inspection of a 6 story new building under construction at 6 fl level partiallyactive job site-responding to a complaint from adjacent property at ex
Sep 17, 2019
Resolve - Class - 1
Stair inlays missing. at time of inspection of a 6 story new building under construction at 6th fl level. responding to a complaint i observed that stairs inlays from 1st fl going to 2nd fl were missing. this c
Sep 17, 2019
Resolve - Class - 1
3309.10;failure to provide roof protection at time of inspection of a 5 story new building with rebar work in progress at roof level during inspection noted that there is no roof protetcion at exposure #2 and 4
Aug 29, 2019
Resolve - Class - 1
3301.2:failure to provide overhead protection at time of my inspection of a 5 stroy new building with rebar work in progress at roof level during inspection noted that there is no overhead protetcion at exposue
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
Construction super failed to perform duties per code at time of inspection of 5 story new building with rebar work in progress at roof level during inspection noted several violating condition (1) no roof levl
Aug 29, 2019 · Penalty $10,000
Resolve - Class - 1
No guardrails system at time of inspection of a 5 story new building with rebar work in progress at roof level during inspectionnoted that there is no guard rails ystem as required by code stop all work 10 away
Aug 29, 2019 · Penalty $5,000
Resolve - Class - 1
Inadeqauet housekeeping at time of inspection of a 5 stroy new building with rebar work in progress at roof level during inspection noted a large amount of debris nd garbage all over teh site creating a trippin
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
No handrails at time of inspection of a 5 stroy new building with rebar work in progress at roof level during inspection noted that there is no handrails as required by code comply with code
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
Bc1906612-failure to secure reshores in proximity to the facade.as noted at time of my inpsection active construction site,6th floor workingdeck.failure to secure reshores in proximity to the facade.reshore sha
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
3301.6:failure to provide design drawing for platform at time of inspection of a 5 story building with rebar work in progress at roof/level during inspection noted that all playtform at elevator shaft and stair
Aug 29, 2019
Resolve - Class - 2
Inadequate construction fence at time of inspection of a 5 stroy new building with rebar work in progress at roof level during inspection noted that the construction fence was leaning and missing panels at the
Aug 29, 2019
Resolve - Class - 1
Bc3309.14-protection of windows.as noted:at time of my inspection,active site,6th floor level,i observed no protection was provided to the windows of adjoining building at expo#4(10feet within expo#4)remedy:sto
Aug 28, 2019 · Penalty $2,500
Resolve - Class - 1
3301.13.1;failure to maintain/display on site construction documents site safety plan.at time of my inspection observed active job site the construction documents site safety plan was not on site as required up
Apr 23, 2019 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment on site expired pemrit.at time of my inspection observed active job site the fence permit was expired on 04-20-2019 failure to provide on renew permit as required.stop all work
Apr 23, 2019
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at time of inspection on a full demolition site noticed that the constuction fence at exp #2 much of the fence was missing leaving cons
Jan 22, 2019
Resolve - Class - 1
3303.4.1.1 slipping and tripping hazards. at the time of my inspectionof a demo sign-off i observed the sidewalk in front of the site to be cracked and bumpy witnessed several people cross street to avoid walki
Jan 17, 2019
Resolve
Complaints
- Plumbing
Water supply
Sep 29, 2026 · Apt 5B
Close - Unsanitary condition
Garbage/recycling storage
Feb 10, 2026 · Apt 1B
Close - Elevator
Maintenance
Sep 29, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Feb 3, 2025 · Apt 5B
Close - Paint/plaster
Wall
Feb 3, 2025 · Apt 5B
Close - Water leak
Heavy flow
Feb 3, 2025 · Apt 5B
Close - Paint/plaster
Ceiling
Feb 3, 2025 · Apt 5B
Close - Plumbing
Toilet
Nov 12, 2024 · Apt 2B
Close - Unsanitary condition
Sewage
Oct 15, 2024 · Apt 2B
Close - Unsanitary condition
Sewage
Oct 15, 2024 · Apt 2B
Close
Show 11 more ↓
- Door/window
Door
Sep 28, 2024 · Apt BLDG
Close - Door/window
Door
Jun 4, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 15, 2024 · Apt 5B
Close - Paint/plaster
Ceiling
Mar 15, 2024 · Apt 5B
Close - Heat/hot water
Apartment only
Feb 14, 2023 · Apt 5B
Close - Unsanitary condition
Mold
Feb 14, 2023 · Apt 5B
Close - Water leak
Damp spot
Feb 14, 2023 · Apt 5B
Close - Flooring/stairs
Floor
Feb 14, 2023 · Apt 5B
Close - Door/window
Window frame
Feb 14, 2023 · Apt 5B
Close - Paint/plaster
Wall
Feb 14, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2019
- Floors
- 6
- Residential units
- 10
- Building area
- 9,202 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 412
- Council district
- 27
- Block / lot
- 9805 / 54
- Assessed value
- $759,600
- Landmark / historic district
- No
HPD registration #433938, last renewed Jul 20, 2026.
Questions about 170-14 89 Avenue
Who owns 170-14 89 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 89 Property LLC.
Does 170-14 89 Avenue have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 170-14 89 Avenue rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 170-14 89 Avenue built?
City records list 2019 as the year it was built.
How many apartments are in 170-14 89 Avenue?
It has 10 residential units.