roofy

89-12 162 Street

Queens, NY 11432BBL 4-09760-0050Map

Owner of record: Vaja Jamaica Building A LLC

89-12 162 Street is an elevator apartment building built in 2025 in Queens, 11432. It has 227 residential units across 6 floors. The owner of record is Vaja Jamaica Building A LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
4
ECB violations
12
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 4

  • Unsafe buildings none

    Ub-unsafe buildings none

    Feb 1, 2022

    V%*-dob violation - dismissed
  • Immediate emergency anythingoptional

    Seal all accessible openings to secure against unauthorized access and to safeguard public

    Dec 28, 2021

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed at 4th floor fire and smoke damage in hallway.

    Dec 27, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2019

    Dob violation - resolved

ECB violations · 12

  • Class - 1

    In response to an incident where a large piece of plywood fall from the construction site & landing into the adjacent school play yard, while there was active recess taking place with a group of children that c

    Jun 3, 2026 · Penalty $10,000

    Resolve
  • Class - 2

    At time of inspection of an 16 story building i observed styrofoam stucco debris particles was all over the sidewalk, street & blowing up & down the block & inside the backyard of the school. creating an inhala

    Jun 3, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    No en drawing and architectural drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; contact via email: [email protected]

    May 1, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 3303.3 watch person. 16-story nb structure stage 128711 sq. ft. approx. site closed and there was no construction activity. upon shouting at perimeter and banging on fence to alert watchperson and to verify

    Jan 19, 2026 · Penalty $5,000

    Resolve
  • Class - 1

    At time of inspection, observed workers installing overhead protection at exposure four, second floor level, where cars and pedestrians walk in and out. protection should have been in place prior to performing

    Jan 15, 2026 · Penalty $10,000

    Resolve
  • Class - 1

    At time of inspection, after review of sidewalk shed plans, observed pedestrian walkway constructed at six feet wide instead of the approved ten feet. work not performed in accordance with approved plans and de

    Jan 15, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    3301.13.6 observed c.s #028317 designated as the primary on a building that meets the requirements of a major building, may only be designated for that job. dept records indicate cs #028317 on x00754631, x01238

    Dec 24, 2025 · Penalty $5,030

    Resolve
  • Class - 1

    Active 16-story major building. observed soe soldier piles installed at all expos, missing soldier pile on expo4. approved soe drawings show 11 soldier piles installed on expo4, only 10 installed. expo2 has 1 e

    Dec 4, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Active jobsite @ excavation/ foundation phase upon request for excavation plans, site safety plan, pe design drawings for stayform & inspections, pre-construction survey by registered professional, none were av

    Dec 4, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Atoi on an active jobsite of a 16-story building at foundation earthwork superstructure below 75 feet, obs that construction log book given was inadequate,missing info, docs details about daily construction act

    Dec 4, 2025

    Resolve
Show 2 more ↓
  • Class - 1

    Active 16-story major building. observed street ops, hoses going across sidewalk right of way tripping hazard, construction vehicles parked in front w/ inadequate protections in place. no flag persons in place

    Dec 4, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Responding a complaint observed: sidewalk shed installed at expo# 1. no underside lighting inoperable light bulbs, failure to maintain as per code 3307.6.4.8 become an unsafe and hazardous condition for pedestr

    Nov 8, 2023 · Penalty $5,000

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2025
Floors
6
Residential units
227
Building area
77,504 ft²
Lot area
18,385 ft²
Zoning
C4-4D
Community board
412
Council district
27
Block / lot
9760 / 50
Assessed value
$259,200
Landmark / historic district
No

Questions about 89-12 162 Street

Who owns 89-12 162 Street?

The owner of record in NYC Department of City Planning PLUTO data is Vaja Jamaica Building A LLC.

Does 89-12 162 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 89-12 162 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 89-12 162 Street built?

City records list 2025 as the year it was built.

How many apartments are in 89-12 162 Street?

It has 227 residential units and 228 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.