153-11 90 Avenue
Queens, NY 11432BBL 4-09755-0061Map
Owner of record: 90 Jamaica Group LLC
153-11 90 Avenue is an elevator apartment building built in 2017 in Queens, 11432. It has 10 residential units across 6 floors. The owner of record is 90 Jamaica Group LLC. HPD has recorded 3 housing violations here, most recently on March 31, 2023. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 3
- DOB violations
- 2
- ECB violations
- 11
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 2
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2020
Dob violation - active
ECB violations · 11
- Class - 2
Construction superintendent failed to perform duties as per rule. at the time of inspection on an active jobsite currently at roof level. upon request as required as per code i ask superintendent(xing lin) for
Mar 22, 2019 · Penalty $2,500
Resolve - Class - 2
Insulation placement and/or r-values do not meet min. required. nb job #421197804. at time of an energy compliance inspection. i observed that the exterior walls on exposure #1,#2,#3 & #4 on 6th floor were inst
Jun 15, 2018
Resolve - Class - 2
Pedestrian protection does not meet code specifications. as noted: at time of inspection active site 6 story bldg, i observed loading materials operations, truck used to lift materials to 6 floor using crane an
May 8, 2018 · Penalty $2,400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section.@ the time of inspection an active construction site,observed @ cellar & 1st fl @ exposure #1 & exposure #3 failure to maintain adequate housekeeping.garbag
Mar 7, 2018 · Penalty $2,500
Resolve - Class - 2
Logs inadequate.as noted,@ time of inspection,active site,6 story bldgupon request of log book to verify compliance,none was provided.superintendent was not presnce @ site.provide & maintain logs as required.re
Mar 7, 2018
Resolve - Class - 1
Failure to institute/maintain safety equipment measures/temporary construction.no guardrails.@ the time of inspection there were no guardrails @ elevator shaft on roof level.also no top board @ slab opening bas
Mar 7, 2018 · Penalty $2,500
Resolve - Class - 2
3301.7.failure to provide pre approved design drawing.@ time of inspection construction site active 6 story building.multiple platforms erected @ 1 story,2 story,elevator bulkhead @ roof.2 wood staircase erecte
Mar 7, 2018
Resolve - Class - 1
Failure to instute/maintain safety equipment or temporary constructionguardrails. as noted: at time of inspection on an active construction site observed at floor #2 workers at elevator shaft opening,exp#1 & 3
Aug 31, 2017 · Penalty $1,200
Resolve - Class - 2
Job site plywood construction fence not pursuant to sub section. as noted: at time of inspection,job site closed,observed at exp#4 missing panels of plywood construction fence. remedy: comply w/sub section corr
Apr 10, 2017
Resolve - Class - 2
Sec. 3304.7 failure to provide adequate means of exit from excavation.as noted: at time of inspection at an active construction site,i observed in adequate unsecure ladder at exp#1 in which was been used as egr
Nov 16, 2016
Resolve
Show 1 more ↓
- Class - 1
Failure to maintain adequate housekeeping per section req constructionmaterial & debris not properly stored or removed from site. as noted: at time of inspection at an active construction site observed at found
Nov 16, 2016 · Penalty $2,400
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 10, 2026 · Apt BLDG
Open - Plumbing
Water supply
Jul 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 6, 2020 · Apt 6A
Close - Door/window
Window frame
Aug 6, 2020 · Apt 6A
Close - Plumbing
Basin/sink
Aug 6, 2020 · Apt 6A
Close - General
Ventilation system
Aug 6, 2020 · Apt 6A
Close - Heat/hot water
Entire building
Dec 21, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2017
- Floors
- 6
- Residential units
- 10
- Building area
- 10,336 ft²
- Lot area
- 3,000 ft²
- Zoning
- R7X
- Community board
- 412
- Council district
- 27
- Block / lot
- 9755 / 61
- Assessed value
- $680,850
- Landmark / historic district
- No
HPD registration #433345, last renewed Jul 29, 2025.
Questions about 153-11 90 Avenue
Who owns 153-11 90 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 90 Jamaica Group LLC.
Does 153-11 90 Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 153-11 90 Avenue rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 153-11 90 Avenue built?
City records list 2017 as the year it was built.
How many apartments are in 153-11 90 Avenue?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.