roofy

153-11 90 Avenue

Queens, NY 11432BBL 4-09755-0061Map

Owner of record: 90 Jamaica Group LLC

153-11 90 Avenue is an elevator apartment building built in 2017 in Queens, 11432. It has 10 residential units across 6 floors. The owner of record is 90 Jamaica Group LLC. HPD has recorded 3 housing violations here, most recently on March 31, 2023. City tax records listed 10 rent-stabilized apartments here in 2024.

HPD violations
3
DOB violations
2
ECB violations
11
HPD complaints
8

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 31, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
10
About 100% of the building's 10 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 3

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations · 2

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 6, 2020

    Dob violation - active

ECB violations · 11

  • Class - 2

    Construction superintendent failed to perform duties as per rule. at the time of inspection on an active jobsite currently at roof level. upon request as required as per code i ask superintendent(xing lin) for

    Mar 22, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Insulation placement and/or r-values do not meet min. required. nb job #421197804. at time of an energy compliance inspection. i observed that the exterior walls on exposure #1,#2,#3 & #4 on 6th floor were inst

    Jun 15, 2018

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. as noted: at time of inspection active site 6 story bldg, i observed loading materials operations, truck used to lift materials to 6 floor using crane an

    May 8, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section.@ the time of inspection an active construction site,observed @ cellar & 1st fl @ exposure #1 & exposure #3 failure to maintain adequate housekeeping.garbag

    Mar 7, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Logs inadequate.as noted,@ time of inspection,active site,6 story bldgupon request of log book to verify compliance,none was provided.superintendent was not presnce @ site.provide & maintain logs as required.re

    Mar 7, 2018

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures/temporary construction.no guardrails.@ the time of inspection there were no guardrails @ elevator shaft on roof level.also no top board @ slab opening bas

    Mar 7, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    3301.7.failure to provide pre approved design drawing.@ time of inspection construction site active 6 story building.multiple platforms erected @ 1 story,2 story,elevator bulkhead @ roof.2 wood staircase erecte

    Mar 7, 2018

    Resolve
  • Class - 1

    Failure to instute/maintain safety equipment or temporary constructionguardrails. as noted: at time of inspection on an active construction site observed at floor #2 workers at elevator shaft opening,exp#1 & 3

    Aug 31, 2017 · Penalty $1,200

    Resolve
  • Class - 2

    Job site plywood construction fence not pursuant to sub section. as noted: at time of inspection,job site closed,observed at exp#4 missing panels of plywood construction fence. remedy: comply w/sub section corr

    Apr 10, 2017

    Resolve
  • Class - 2

    Sec. 3304.7 failure to provide adequate means of exit from excavation.as noted: at time of inspection at an active construction site,i observed in adequate unsecure ladder at exp#1 in which was been used as egr

    Nov 16, 2016

    Resolve
Show 1 more ↓
  • Class - 1

    Failure to maintain adequate housekeeping per section req constructionmaterial & debris not properly stored or removed from site. as noted: at time of inspection at an active construction site observed at found

    Nov 16, 2016 · Penalty $2,400

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Sep 10, 2026 · Apt BLDG

    Open
  • Plumbing

    Water supply

    Jul 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 24, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2020 · Apt 6A

    Close
  • Door/window

    Window frame

    Aug 6, 2020 · Apt 6A

    Close
  • Plumbing

    Basin/sink

    Aug 6, 2020 · Apt 6A

    Close
  • General

    Ventilation system

    Aug 6, 2020 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2019 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2017
Floors
6
Residential units
10
Building area
10,336 ft²
Lot area
3,000 ft²
Zoning
R7X
Community board
412
Council district
27
Block / lot
9755 / 61
Assessed value
$680,850
Landmark / historic district
No

HPD registration #433345, last renewed Jul 29, 2025.

Questions about 153-11 90 Avenue

Who owns 153-11 90 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 90 Jamaica Group LLC.

Does 153-11 90 Avenue have violations?

Yes. NYC HPD has recorded 3 housing violations at this property.

Is 153-11 90 Avenue rent stabilized?

NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 153-11 90 Avenue built?

City records list 2017 as the year it was built.

How many apartments are in 153-11 90 Avenue?

It has 10 residential units and 11 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.