84-11 Lander Street
Queens, NY 11435BBL 4-09716-0118Map
Owner of record: Lander Plaza LLC
84-11 Lander Street is an elevator apartment building built in 2013 in Queens, 11435. It has 37 residential units across 6 floors. The owner of record is Lander Plaza LLC. HPD has recorded 18 housing violations here, most recently on September 26, 2026. 10 of the 18 most recent violations are still open. City tax records listed 37 rent-stabilized apartments here in 2024.
- HPD violations
- 18
- DOB violations
- 4
- ECB violations
- 23
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door (b) leading to cellar story at public hall, 1st story
Sep 26, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16, 4th story, 1st apartment from south at west , section at north
Sep 26, 2026 · Apt 16
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective counter top at sink in the kitchen located at apt 16, 4th story, 1st apartment from south at west , section at north
Sep 26, 2026 · Apt 16
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 16, 4th story, 1st apartment from south at west , section at north
Sep 26, 2026 · Apt 16
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 16, 4th story, 1st apartment from south at west , section at north
Sep 26, 2026 · Apt 16
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at fire stairs ''a'' , fire stairway ceiling light fixture , 6th story
Apr 17, 2019
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 31, 6th story, apartment at west
Jan 18, 2019 · Apt 31
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color celing in the 1st room from north located at apt 31, 6th story, apartment at west
Jan 18, 2019 · Apt 31
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 31, 6th story, 4th apartment from south at west
Jan 18, 2019 · Apt 31
Open — Nov sent out
Show 8 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 31, 6th story, 4th apartment from south at west
Jan 18, 2019 · Apt 31
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 31, 6th story, 4th apartment from south at west
Jan 18, 2019 · Apt 31
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 31, 6th story, 4th apartment from south at west
Jan 18, 2019 · Apt 31
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 8, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 8, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 8, 2018
Closed — Violation dismissed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 15, 3rd story, apartment at north
Feb 8, 2015 · Apt 15
Closed — Violation closed
DOB building violations · 4
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2016
Dob violation - resolved - Unsafe buildings none
Ub-unsafe buildings none
May 27, 2010
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 27, 2008
Dob violation - dismissed
ECB violations · 23
- Class - 2
48b07 hydro tank is low on oil.
Jan 11, 2017 · Penalty $500
Active - Class - 2
67x10,03d06,40p16. 67x10-repair emergency phone; 03d06-properl secure the calls panel; 40p16-no access to machine room.
Jan 12, 2016 · Penalty $250
Resolve - Class - 1
Erected on instaalled supported scaffold 40ft or higher w/o a permit noted at 7story new bldg under construction at exp 3&4 appx 71ft of supported scaffold erected appx 45'ft in height aat rear and planked walk
Jun 4, 2012 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at active job site observed accumulations of piled up construction debris @ exterior of site,next to front entry
Jan 9, 2012 · Penalty $800
Resolve - Class - 1
Sec. 3301.2. holes/openings not covered. noted: at time of inspection at active job site observed holes, openings not covered at various locations of site next to elevator locations & next to hvac penetrations
Jan 9, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. @ above active construction site,the following was observed @ cellar level, pile of masonry debris & wood piled up in the hallway.impeading eg
Jul 13, 2011 · Penalty $2,400
Resolve - Class - 2
Failure to post "no smoking sign" at const/demo site as per fire code. at above active job-site 7 story masonry/steel bldg has no "no smoking" signs are missing from all floors and stair cases. remedy:post no-s
Jul 13, 2011 · Penalty $400
Resolve - Class - 1
Failure to provide sidewalk shed where require. noted construction of 6 story building in progress set back approx 15' from sidewalk with no shed provided. remedy: provide sidewalk shed.
Apr 26, 2011 · Penalty $4,800
Resolve - Class - 1
Failure to comply w/the commissioner's order to stop work noted observed 3 men remaining reshores & tossing them into rear yard of site fromupper floors at time of inspection. remedy: comply w/commissioner's
Apr 26, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations noted:men working on balconies w/no fall protection, balconies have no toe boards man throwing reshores off 3flr balcony,stairs
Apr 25, 2011 · Penalty $2,400
Resolve
Show 13 more ↓
- Class - 1
Bc3301.2)holes/openings not covered.noted:@ time of inspection @ above job site observed no covered openings @ 7 flr of bldg (q-neck area)creating unsafe conditions for site workers.rem:immediately seal/cover a
Apr 6, 2011 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.noted:@ time of inspection @ job site observed accumulations of broken concrete,loose materials scattered @ front yard of job site,creating uns
Apr 6, 2011 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp construction.no guard rails.noted:@ time of inspection on jobsite a 7 flr,q0deck fl stair case opening has no guard rails.rem:immediately provide
Apr 6, 2011 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain in safety equipment measures or temporary construction no guardrails provided.as noted:@ time of inspection @ a active construction site,bldg up to 6 stories,@ flr#6 @ exposure#1
Mar 24, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to maintain adequate houskeeping per section requirements.as noted:@ time of insp @ a active construction site,bldg up to 6 stories,@ flr#1,exposures#1,2,&4 observed excessive amounts of debris, wood,sk
Mar 24, 2011 · Penalty $2,400
Resolve - Class - 2
3303.2.4)sanitary facilities.noted:@ time of inspection on an active construction site,approx 12 workers on site.no sanitary facilities provided for workers use.rem:provide sanitary facilities.
Jan 11, 2011 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measure or temporary construction - no guard rails noted: at time of inspection on an active construction site bldg up to 5th flr deck, masonry & framers on site,
Jan 11, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to maintain/institute safety equipment measures or temporar construction. no hand rails. noted: at time of inspection bldg up to 5thflr deck steel stair installed from cellar to 5th flr. no handrails
Jan 11, 2011 · Penalty $1,000
Resolve - Class - 1
Sec. 3313.1. flammable and combustible gases, mixtures & other hazardous material noted: at time of inspection bldg up to 5th flr form q deck. observed at 2nd flr one tank each of oxygen and acetylene being
Jan 11, 2011 · Penalty $1,600
Resolve - Class - 2
Failure to post permit for work at premises noted job #402677630 dm house demolition work in progress no permit post no fence permit post no contractors sign post remedy: post permit for work at premises
Aug 8, 2008 · Penalty $400
Resolve - Class - 2
Failure to post permit for wrk @ premises noted job #402679641 dm house demolition wrk in progress no permit post no fence permit post no contractor sign post rem post permit for wrk @ premises
Aug 8, 2008 · Penalty $400
Resolve - Hazardous
Failure to maintain bldg haz. all the windows and doors have been removed and the house is accessible to anyone it is open and unguarded. remedy: maintain bldg obtain all necessary permits make safe.
Jun 27, 2008 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg. haz. the front door is open and windows have been removed and the house is accessible to anyone it is open and unguarded. remedy maintain building obtain all necessary permits make saf
Jun 27, 2008 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Sep 24, 2026 · Apt 16
Close - General
Cabinet
Sep 24, 2026 · Apt 16
Close - Unsanitary condition
Mold
Sep 24, 2026 · Apt 16
Close - Safety
Window guard broken/missing
Sep 24, 2026 · Apt 16
Close - Plumbing
Bathtub/shower
Feb 1, 2026 · Apt 5
Close - Plumbing
Basin/sink
Feb 1, 2026 · Apt 5
Close - Electric
Power outage
Sep 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2019 · Apt 33
Close - Water leak
Slow leak
Jan 15, 2019 · Apt 31
Close - Water leak
Slow leak
Jan 15, 2019 · Apt 31
Close
Show 15 more ↓
- Water leak
Slow leak
Jan 15, 2019 · Apt 31
Close - Electric
No lighting
Oct 16, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2018 · Apt 37
Close - Plumbing
Water supply
May 2, 2018 · Apt BLDG
Close - Electric
Power outage
Dec 29, 2017 · Apt BLDG
Close - Elevator
Maintenance
Dec 29, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt 15
Close - Heat/hot water
Apartment only
Feb 6, 2015 · Apt 15
Close - Heat/hot water
Apartment only
Feb 6, 2015 · Apt 15
Close - Heat/hot water
Apartment only
Feb 4, 2015 · Apt 15
Close - Heat/hot water
Apartment only
Jan 31, 2015 · Apt 15
Close - Heating
Heat related
Mar 14, 2008 · Apt 1
Close - Heating
Heat-plant
Mar 14, 2008 · Apt 1
Close - General
Mold
Mar 14, 2008 · Apt 1
Close - Electric
Wiring
Mar 14, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2013
- Floors
- 6
- Residential units
- 37
- Building area
- 27,500 ft²
- Lot area
- 9,200 ft²
- Zoning
- R6A
- Community board
- 408
- Council district
- 24
- Block / lot
- 9716 / 118
- Assessed value
- $2,558,250
- Landmark / historic district
- No
HPD registration #431578, last renewed Aug 25, 2025.
Questions about 84-11 Lander Street
Who owns 84-11 Lander Street?
The owner of record in NYC Department of City Planning PLUTO data is Lander Plaza LLC.
Does 84-11 Lander Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 84-11 Lander Street rent stabilized?
NYC Department of Finance tax bills listed 37 rent-stabilized units here in 2024 (about 100% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 84-11 Lander Street built?
City records list 2013 as the year it was built.
How many apartments are in 84-11 Lander Street?
It has 37 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.