147-01 Hillside Avenue
Queens, NY 11435BBL 4-09702-0062Map
Owner of record: 147-01 Hillside Owners, INC
147-01 Hillside Avenue is a walk-up apartment building built in 1931 in Queens, 11435. It has 24 residential units across 4 floors. The owner of record is 147-01 Hillside Owners, INC. HPD has recorded 583 housing violations here, most recently on September 9, 2026. 22 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 583
- DOB violations
- 8
- ECB violations
- 18
- HPD complaints
- 1,798
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 583
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from north located at apt 18, 3rd story, 1st apartment from north at east
Sep 9, 2026 · Apt 18
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 18, 3rd story, 1st apartment from north at east
Sep 9, 2026 · Apt 18
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from north located at apt 18, 3rd story, 1st apartment from north at east
Sep 9, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly secure the loose 2nd black metal baulister at stairs leading to east yard yard
Aug 6, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
Aug 6, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 4th story
Aug 6, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at skylight at public hall stairs, 4th story
Aug 6, 2026
Open — Nov certified on time - BHazardous
Repair the roof so that it will not leak over roof at public hall stairs, 4th story
Aug 6, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door leading to public hall , 1st story
Aug 6, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door leading to public hall , 1st story
Aug 6, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of ladder and construction materials under public hall stairs at public hall, 1st story
Aug 6, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 4th story
Aug 6, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of refridgerator with door attached at public hall, 1st story
Jul 12, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulk around the bathtub in the bathroom located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Open — Civ14 mailed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hotwater above 130f degrees in the entire apartment located at apt 5, 1st story, 2nd apartment from west at north
Jul 12, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard
Jun 16, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of ladders and construction materials at public hall, 1st story
Jun 12, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to west yard at public hall, 1st story
Jun 12, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall stairs, 4th story
May 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall stairs, 4th story
May 4, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall stairs, 4th story
May 4, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 26, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 20, 2026
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at boiler room
Apr 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 1st story, 2nd apartment from west at north
Apr 6, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Mar 25, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vestibule door at public hall, 1st story
Mar 14, 2026
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at lobby, 1st story
Feb 20, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 4th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 4th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall stairs, 4th story
Feb 20, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 4th story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of mattress and household items at public hall, 1st story
Feb 20, 2026
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at public hall, 1st story
Feb 20, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Jan 30, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
Jan 30, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Jan 30, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit installed at fire escape window at the west stack at the building front at fire escape, 4th story
Sep 10, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit installed at fire escape window at the west stack at the building front at fire escape, 3rd story
Sep 10, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit installed at fire escape window at west stack at building front at fire escape, 2nd story
Sep 10, 2025
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the , 1st yard from east
Sep 3, 2025
Open — Nov sent out
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 18
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39155552h, file a certificate of correction
Aug 7, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39154079r, file a certificate of correction
Aug 7, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain at time of inspection observed at exposure 3,at the rear, construction debris pile up buckets sheetrock wood ,metals blocking egress at the fire escape pathways for tenants to exit the build
Feb 10, 2026
Resolve - Class - 1
Failure to provide unobstructed exit passageway for summons 39155552h. observed there are still flowerpots at the middle opening on the top fire-escape platform. at the rear of the building, a vacuum equipment
Nov 21, 2025 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code-compliant manner for summons 39154079r. observed there are still flowerpots at the middle opening on the top fire-escape platform. at the rear of the building, a vacuum equi
Nov 21, 2025 · Penalty $25,000
Active - Class - 1
At rear of building, at 2nd and 4th floors window ac unit obstruct exit passageway on fire escape., remove obstruction
Aug 20, 2025 · Penalty $6,250
Active - Class - 1
At rear of building, fire escape at 2nd and 4th floors, window ac unit partially obstruct exit., remove obstruction
Jul 31, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, there are ac units and flowerpot partially obstructing the fire escape at various locations., repair and/replace
Jul 17, 2025 · Penalty $12,500
Active - Class - 2
Failure to maintain building in code-compliant manner. note: observed multiple flower pots stored on fire escape blocking egress pathway at exposure 2 of this location in violation of construction and fire code
Apr 23, 2025 · Penalty $1,280
Active - Class - 3
Heating system- boiler sign does not contain correct information as per hmc27-2003. correct violating condition and submit a certificate of correction.
Mar 8, 2022 · Penalty $250
Resolve
Show 8 more ↓
- Class - 1
Failure to provide unobstructed exit passageway. at 3rd fl rear fire escape,garbage bags are blocking exit from 4th fl. tenants in apt#16 did not answer door. super not at premises no answer to phone # for supe
Feb 13, 2022
Resolve - Class - 1
Failure to provide unobstructed exit passageway.atoi observed:@exp1,2,3 fire escape clear passageway obstructed by window mounted acunits household items,&debris@multiple locations.remove obstructions.
Jan 27, 2022 · Penalty $312
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs. for violationg conditions cited in vio#35405818j issued on 03/22/2019 pursuant to 28-201.2;28-204.1;1rcny 102.01.
Aug 12, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs. for violationg conditions cited in vio#35465927n issued on 01/14/2020 pursuant to 28-201.2;28-204.1;1rcny 102.01.
Aug 12, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the dept of buidlings.respondent failed to comply with commissioner's order to correct violating conditions and file a certif
Jul 16, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with dept of buildings.respondent failed to comply with commissioner's order to correct the violating conditions and file a certif
Jul 16, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order tof a file a certificate of correction the department of buildings violation #35405818j issued #3/22/2019 file a certificate of correction
Jan 14, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code-compliant manner. noted @the timeof inspection (1) missing an imporper support of ac units @exp 1 missing an improper support of ac units @exp 1&3 also @stair leading to
Mar 22, 2019 · Penalty $1,250
Resolve
Complaints
- Line of travel
Line of travel
Oct 16, 2026 · Apt BLDG
Open - Line of travel
Line of travel
Oct 16, 2026 · Apt 11
Open - Line of travel
Line of travel
Oct 16, 2026 · Apt 21
Open - Line of travel
Line of travel
Oct 16, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Oct 9, 2026 · Apt BLDG
Open - Unsanitary condition
Pests
Sep 21, 2026 · Apt 11
Close - Safety
Smoke detector
Sep 21, 2026 · Apt 11
Close - Safety
Window guard broken/missing
Sep 21, 2026 · Apt 11
Close - Safety
Carbon monoxide detector
Sep 21, 2026 · Apt 11
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 11
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Sep 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 19, 2026 · Apt BLDG
Close - Door/window
Door
Sep 18, 2026 · Apt BLDG
Close - Door/window
Door
Sep 18, 2026 · Apt BLDG
Close - Electric
Lighting
Sep 8, 2026 · Apt 18
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 18
Close - Flooring/stairs
Floor
Sep 8, 2026 · Apt 18
Close - Appliance
Refrigerator
Sep 8, 2026 · Apt 18
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 18
Close - Paint/plaster
Wall
Sep 8, 2026 · Apt 18
Close - Door/window
Window frame
Sep 8, 2026 · Apt 18
Close - Plumbing
Toilet
Sep 8, 2026 · Apt 18
Close - Paint/plaster
Radiator
Sep 8, 2026 · Apt 18
Close - Flooring/stairs
Floor
Sep 8, 2026 · Apt 18
Close - Electric
Outlet/switch
Sep 8, 2026 · Apt 18
Close - Unsanitary condition
Pests
Sep 5, 2026 · Apt 20
Close - Unsanitary condition
Garbage/recycling storage
Sep 4, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 18ON3R
Close - Outside building
Roofing
Sep 4, 2026 · Apt BASEME
Close - Outside building
Gutter/leader
Sep 4, 2026 · Apt BASEME
Close - Electric
Wiring
Sep 4, 2026 · Apt BASEME
Close - Door/window
Door
Sep 4, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 18
Close - Flooring/stairs
Floor
Sep 4, 2026 · Apt 18ON3R
Close - Flooring/stairs
Floor
Sep 4, 2026 · Apt 18
Close - Electric
Outlet/switch
Sep 4, 2026 · Apt 18
Close - Paint/plaster
Ceiling
Sep 4, 2026 · Apt 18
Close - Electric
Lighting
Sep 4, 2026 · Apt 18
Close - Electric
Lighting
Sep 4, 2026 · Apt 18ON3R
Close - Electric
Outlet/switch
Sep 4, 2026 · Apt 18ON3R
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 18ON3R
Close - Heat/hot water
Apartment only
Sep 4, 2026 · Apt 18ON3R
Close - Appliance
Refrigerator
Sep 4, 2026 · Apt 18ON3R
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 17, 2026 · Apt ALLBUI
Close - Heat/hot water
Entire building
Aug 17, 2026 · Apt 18
Close - Unsanitary condition
Garbage/recycling storage
Aug 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 12, 2026 · Apt BLDG
Open - General
Janitor/super
Aug 12, 2026 · Apt BLDG
Open
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 24
- Building area
- 20,834 ft²
- Lot area
- 6,000 ft²
- Zoning
- C4-4D
- Community board
- 408
- Council district
- 24
- Block / lot
- 9702 / 62
- Assessed value
- $689,850
- Landmark / historic district
- No
HPD registration #400277, last renewed Aug 15, 2025.
Questions about 147-01 Hillside Avenue
Who owns 147-01 Hillside Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 147-01 Hillside Owners, INC.
Does 147-01 Hillside Avenue have violations?
Yes. NYC HPD has recorded 583 housing violations at this property.
Is 147-01 Hillside Avenue rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 96% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 147-01 Hillside Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 147-01 Hillside Avenue?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.