roofy

90-36 149 Street

Queens, NY 11435BBL 4-09678-0112Map

Owner of record: Jamaica Seven LLC C/O

90-36 149 Street is an elevator apartment building built in 1941 in Queens, 11435. It has 112 residential units across 6 floors. The owner of record is Jamaica Seven LLC C/O. HPD has recorded 155 housing violations here, most recently on September 30, 2026. 38 of the 50 most recent violations are still open. City tax records listed 95 rent-stabilized apartments here in 2024.

HPD violations
155
DOB violations
38
ECB violations
29
HPD complaints
258

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
95
About 85% of the building's 112 apartments
Down from 111 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 155

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the 3rd room from north at east located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective entrance door lock at lobby, 1st story

    Sep 30, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the private hallway , the kitchen located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door, 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door, 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak the ceiling in the 3rd room from north at east located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st window frame from north at east wall, 1st door frame from west at north wall in the 3rd room from north at east located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 2nd closet from west at north wall door frame, 1st closet from west at north wall door frame in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall, east wall, west wall, 2nd closet from west at north wall door in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at the east wall in the bathroom located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , ceiling, 1st window frame from north at east wall, 1st door frame from west at north wall, south wall, 1st door from west at north wall in the 3rd room from north at east located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Notice of issuance sent to tenant
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at the east in the kitchen located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to the east wall in the foyer located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the 3rd room from north at west located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6s, 6th story, 1st apartment from west at north

    Sep 30, 2026 · Apt 6S

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6s, 6th story, 1st apartment from west at north

    Sep 30, 2026 · Apt 6S

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets in the bathtub in the bathroom located at apt 6s, 6th story, 1st apartment from west at north

    Sep 30, 2026 · Apt 6S

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6s, 6th story, 1st apartment from west at north

    Sep 30, 2026 · Apt 6S

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall, 1st door from west at north wall in the 3rd room from north at east located at apt 3n, 3rd story, 1st apartment from east at south , section at west

    Sep 30, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1t, 1st story, 2nd apartment from west at north

    Sep 25, 2026 · Apt 1T

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1t, 1st story, 2nd apartment from west at north

    Sep 25, 2026 · Apt 1T

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1t, 1st story, 2nd apartment from west at north

    Sep 25, 2026 · Apt 1T

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1t, 1st story, 2nd apartment from west at north

    Sep 25, 2026 · Apt 1T

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east

    Sep 20, 2026 · Apt 1D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway located at apt 3m, 3rd story, 2nd apartment from north at east , section at west

    Sep 20, 2026 · Apt 3M

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east

    Sep 20, 2026 · Apt 1D

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east

    Sep 20, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east

    Sep 20, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6s, 6th story, 1st apartment from west at north

    Jun 24, 2026 · Apt 6S

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of a/c unit install at window leading to fire escape in the 3rd room from east at south located at apt 6s, 6th story, 1st apartment from west at north

    Jun 24, 2026 · Apt 6S

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front at south at fire passage way

    Apr 29, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Apr 9, 2026 · Apt 1L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Apr 9, 2026 · Apt 1L

    Open — False certification
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet ceiling,west wall,north wall in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Apr 9, 2026 · Apt 1L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Apr 9, 2026 · Apt 1L

    Open — False certification
  • A

    Paint with light colored paint to the satisfaction of this department north wall and ceiling at public hall, 6th story

    Mar 20, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west , section ''east''

    Oct 24, 2025 · Apt 1L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west , section ''east''

    Oct 24, 2025 · Apt 1L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hasp and eye at door capable of being pad-locked in the entrance located at apt 6e, 6th story, 3rd apartment from north at east , section '' a-l''

    Sep 18, 2024 · Apt 6E

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Aug 30, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 2nd story, section ''a-l''

    Aug 20, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 3rd story, section ''a-l''

    Aug 20, 2024

    Closed — Violation closed

DOB building violations · 38

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 21, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 21, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 4, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2017

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
Show 28 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2016

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 14, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 14, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 4, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 4, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 27, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 29, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 29, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 9, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 9, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 20, 1995

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 20, 1995

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    Device #4p1362

    May 8, 1991

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    (51)remove exessive noise from shaft while car is in motion

    Oct 13, 1988

    Dob violation - resolved
  • Elevator elevatorrequired

    (07)remove excessive noise (35)provide cover on main flr

    Oct 13, 1988

    Dob violation - resolved

ECB violations · 29

  • Class - 2

    1) repair fire fighter's hat light on car station remains lit. 2) provide in case of fire signage on designated floor landings 3 and 6.

    Oct 5, 2026 · Penalty $625

    Active
  • Class - 2

    Air proving sail switch inoperative, missing discharge piping on backflow preventer. boiler ratings plate illegible.

    Sep 19, 2022

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:at exposure#1 east elevation(149st)step cracked brick masonry on parapetwall.exposure#2 south elevation step cracked brick masonry on the para

    Mar 20, 2021 · Penalty $620

    Resolve
  • Class - 2

    Failure to maintain exterior building facade an dappurtenances note at the time of my inspection observed at 1) east elevation (149 st) step cracked brick masonry on parapet wall and below floors (1) cracked wi

    Jan 21, 2021

    Resolve
  • Class - 1

    1rcny 103-04 1rncy-misc/rs-misc woner failed to repair defectiev condition (east elevation 149 st damaged window pane glass & north elevation lowe ct damaged brick sill at 1st flor within time fram erecommended

    Jan 21, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #816591. rmdy: submit required technical report.

    Oct 15, 2018

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. note: at the time of re-inspection to verify previous summons #35265350l dated: 02/05/18. observe repair work is not adequate at exp #1. east elev

    Jul 24, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facade & appurtenances. note: at thetime of inspection observe,cracks/step crack at prapet masonry wall & loose/spalled brick mortar joint at parapet wall at exst & north eleva

    Feb 5, 2018 · Penalty $250

    Resolve
  • Class - 2

    3307.6.2,partial stop work order for suspended scaffold issued pursuant to 28-207.2 & posted @ premises.areas to be protected.note:suspendedscaffold in connection w/ c-hooks have been erected @ front @ the bldg

    May 30, 2014 · Penalty $400

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to correct the violating condition & file a cert.of correction with the nyc dob for nov#34873492j.remedy:correct the violating condition & file a certificate of correction.

    Sep 19, 2011 · Penalty $400

    Resolve
Show 19 more ↓
  • Class - 2

    Failure to comply w/the comm's order to correct the violating condition & file a cert.of correction with the nycdob for nov#34873493l remedycorrect the violating condition & file a certificate of correction.

    Sep 19, 2011 · Penalty $400

    Resolve
  • Class - 1

    Supervision/use of rigging equipment w/o a rigger's license. noted: no license rigger on site for suspended scaffold in use @ exposure 1. rem:discontinue use/scaffold removed @ my request @ time of inspection t

    Apr 4, 2011 · Penalty $4,800

    Resolve
  • Class - 1

    Fail to safeguard all persons & prop affected by construction operations. noted: rigging equipment in use @ roof level of a 6-story bldg w/no danger signs or flag man in place for pedestrian traffic, observed p

    Apr 4, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide elevator landing sign that shall read:in case of fire use stairs unless otherwise instructed @ the elevator's bank(two)mostly on floor 2 to 6.failure to provide 3in minimum high,alphabetic le

    Jan 19, 2010

    Resolve
  • Class - 3

    Work contrary to approved construction for alt 2 job #402568627. permit expired on 1/1/08 non-conformance observed: plans shows area of work on plot plan with pavers dimension to be 8'-0" x 60'-0" i. found pave

    Mar 19, 2009

    Resolve
  • Class - 3

    52h11.40b09. 40 remove all non elevator equipment from motor rm

    Aug 4, 2008 · Penalty $100

    Resolve
  • Hazardous

    Work without a permit expired permit

    Mar 3, 2008 · Penalty $250

    Resolve
  • Hazardous

    Failure to provide contractor's sign.

    Mar 3, 2008

    Resolve
  • Non-hazardous

    Work without permit work noted: on first floor (lobby) erected partions for office. constructed of aluminum frame and glass panels approx. 12 feet high by 12 feet long by 12 feet wide with, door approx. 36

    Dec 30, 2004 · Penalty $500

    Resolve
  • Non-hazardous

    18o07,40u16. 18-o-07, basement lock cover.

    Mar 8, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit work noted created hole in the wall and installed an exhaust fan in apartment 1s between this apartment and public moll. remedy: obtain a permit or restore to prior legal condition.

    Apr 6, 1998

    Resolve
  • Non-hazardous

    52h,75u. 52 reline brake. 75 perform 5 yr test tag device file elev 3 form.

    Jul 20, 1996

    Resolve
  • Non-hazardous

    75u. perform.

    Jul 20, 1996

    Resolve
  • Non-hazardous

    08v, 57o.

    Mar 20, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    08v, 57o.

    Mar 20, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    18m,57o,73#,(18)covers at 1st floor.(73)perform 5 yr test properly tagdevice & file elev 3 form.

    Mar 31, 1992 · Penalty $75

    Resolve
  • Non-hazardous

    15i,17m,36i,57o,73#,(15)6 floor (17)car door (36)door lock (73)perform5yr test,properly tag device & file elev 3 form.

    Mar 31, 1992 · Penalty $75

    Resolve
  • Non-hazardous

    52h,73#,#(52)brake linings #73)five year test and file elv3.

    Sep 4, 1990 · Penalty $75

    Resolve
  • Non-hazardous

    52h,50y,73#,02l,#(52)brake linings #(73)five year test and file elv3 #(02)provide proper sounding.

    Sep 4, 1990 · Penalty $75

    Resolve

Complaints

  • Water leak

    Damp spot

    Oct 15, 2026 · Apt 6K

    Open
  • Unsanitary condition

    Mold

    Oct 15, 2026 · Apt 6K

    Open
  • Paint/plaster

    Ceiling

    Oct 15, 2026 · Apt 6K

    Open
  • Unsanitary condition

    Pests

    Sep 23, 2026 · Apt 3N

    Close
  • Unsanitary condition

    Pests

    Sep 23, 2026 · Apt 3N

    Close
  • Water leak

    Slow leak

    Sep 17, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2026 · Apt 3N

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2026 · Apt 3N

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2026 · Apt 6S

    Close
  • Plumbing

    Basin/sink

    Aug 31, 2026 · Apt 1T

    Close
Show 40 more ↓
  • Electric

    No lighting

    Aug 31, 2026 · Apt 1T

    Close
  • Water leak

    Slow leak

    Aug 31, 2026 · Apt 1T

    Close
  • Electric

    Outlet/switch

    Aug 31, 2026 · Apt 1T

    Close
  • Flooring/stairs

    Floor

    Aug 31, 2026 · Apt 1T

    Close
  • Flooring/stairs

    Floor

    Aug 31, 2026 · Apt 1T

    Close
  • Paint/plaster

    Ceiling

    Aug 31, 2026 · Apt 1T

    Close
  • Electric

    Lighting

    Aug 30, 2026 · Apt 1T

    Close
  • Electric

    Outlet/switch

    Aug 30, 2026 · Apt 1T

    Close
  • Water leak

    Heavy flow

    Aug 30, 2026 · Apt 1T

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2026 · Apt 1T

    Close
  • Water leak

    Slow leak

    Aug 30, 2026 · Apt 1T

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 3M

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 6S

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 6S

    Close
  • Heat/hot water

    Apartment only

    Apr 28, 2026 · Apt 1T

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 6F

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2025 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2025 · Apt 4O

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 1T

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2024 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Aug 9, 2024 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Aug 9, 2024 · Apt 1L

    Close
  • Appliance

    Refrigerator

    Aug 9, 2024 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Aug 9, 2024 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Aug 9, 2024 · Apt 1L

    Close
  • Electric

    Outlet/switch

    Aug 8, 2024 · Apt 4O

    Close
  • Electric

    Power outage

    Jul 29, 2024 · Apt 4O

    Close
  • Door/window

    Window pane

    Jul 9, 2024 · Apt 4O

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1941
Floors
6
Residential units
112
Building area
110,538 ft²
Lot area
28,485 ft²
Zoning
R7X
Community board
412
Council district
27
Block / lot
9678 / 112
Assessed value
$4,032,000
Landmark / historic district
No

HPD registration #419060, last renewed Jul 24, 2026.

Questions about 90-36 149 Street

Who owns 90-36 149 Street?

The owner of record in NYC Department of City Planning PLUTO data is Jamaica Seven LLC C/O.

Does 90-36 149 Street have violations?

Yes. NYC HPD has recorded 155 housing violations at this property.

Is 90-36 149 Street rent stabilized?

NYC Department of Finance tax bills listed 95 rent-stabilized units here in 2024 (about 85% of its 112 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 90-36 149 Street built?

City records list 1941 as the year it was built.

How many apartments are in 90-36 149 Street?

It has 112 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.