124-16 84 Road
Queens, NY 11415BBL 4-09246-0305Map
Owner of record: Cretwood Apartment Owners
124-16 84 Road is an elevator apartment building built in 1938 in Queens, 11415. It has 72 residential units across 6 floors. The owner of record is Cretwood Apartment Owners. HPD has recorded 65 housing violations here, most recently on October 2, 2020. 48 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 65
- DOB violations
- 33
- ECB violations
- 23
- HPD complaints
- 49
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- BHazardous
Provide an adequate supply of gas to the fixtures the gas range in the kitchen located at apt 5f, 5th story, 1st apartment from east at south
Oct 2, 2020 · Apt 5F
Open — Nov sent out - ANon-hazardous
Replace with new the missing pop-up stopper at wash basin in the bathroom located at apt 5f, 5th story, 1st apartment from east at south
Oct 2, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5f, 5th story, 1st apartment from north at east
Aug 25, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5f, 5th story, 1st apartment from north at east
Aug 25, 2020 · Apt 5F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 5f, 5th story, 1st apartment from north at east
Aug 25, 2020 · Apt 5F
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring the ceiling in the 3rd private hallway from east at north located at apt 5f, 5th story, 1st apartment from east at south
Aug 22, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at east wall in the 2nd private hallway from east located at apt 5f, 5th story, 1st apartment from east at south
Aug 22, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5f, 5th story
Aug 22, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5f, 5th story
Aug 22, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Replace with new the missing ceiling light fixture in the 3rd room from north at west located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of hot plate being used for cooking located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline pipe, sink in the kitchen located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the north west 2 room located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
May 7, 2020 · Apt 5F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling near apartment 1 j at public hall, 1st story, section ''west''
Feb 19, 2020
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant plaster material at ceiling near apartment 1j at public hall, 1st story, section ''west''
Feb 19, 2020
Open — Nov sent out - ANon-hazardous
Replace with new the missing soffit pannel at ceiling of extended roof ,(building entrance )
Feb 19, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall of the vestibule , 1st story
Feb 19, 2020
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant plaster material south wall of the vestibule , 1st story
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 2nd story, section ''east''
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 4th story, section ''east''
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 5th story, section ''east''
Feb 19, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th story, section ''east''
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 2nd story, section ''west''
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 4th story, section ''west''
Feb 19, 2020
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering carpet at public hall, 6th story, section ''west''
Feb 19, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the vestibule (building entrance ) , 1st story
Feb 19, 2020
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
Oct 26, 2019 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
Oct 26, 2019 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline pipe under sink in the kitchen located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
Oct 26, 2019 · Apt 5F
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
Oct 26, 2019 · Apt 5F
Open — Nov sent out - BHazardous
Replace with new the missing ceiling light fixture in the foyer located at apt 5f, 5th story, 1st apartment from north at east , section ''east''
Oct 26, 2019 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 4j, 4th story, 1st apartment from west at north
Dec 7, 2016 · Apt 4J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from north at west located at apt 4j, 4th story, 1st apartment from west at north
Dec 7, 2016 · Apt 4J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 4j, 4th story, 1st apartment from west at north
Dec 7, 2016 · Apt 4J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 2nd room from north at west located at apt 4j, 4th story, 1st apartment from west at north
Dec 7, 2016 · Apt 4J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from north at east located at apt 4j, 4th story, 1st apartment from west at north
Dec 7, 2016 · Apt 4J
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2016
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the private hallway located at apt 6h, 6th story
Mar 11, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color closet at south wall in the private hallway located at apt 6h, 6th story
Mar 11, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north at east located at apt 6h, 6th story
Mar 11, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing. in the entire apartment located at apt 6h, 6th story
Mar 11, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 6h, 6th story
Mar 11, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective walls and ceiling at 6th story at public hall
Mar 11, 2016
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective walls and ceiling at bulkhead. at public hall
Mar 11, 2016
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watt. at north yard
Mar 11, 2016
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the private hallway located at apt 6h, 6th story, 2nd apartment from north at east
Mar 8, 2016 · Apt 6H
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 6h, 6th story, 2nd apartment from north at east
Mar 8, 2016 · Apt 6H
Open — Nov sent out
DOB building violations · 33
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 14, 2018
Dob violation - resolved - Elevator elevatorrequired
Cease use
May 2, 2017
Dob violation - resolved - Elevator elevatorrequired
Cease use
May 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2012
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2011
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Sep 16, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2008
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Mm
Sep 6, 1989
Dob violation - dismissed - Elevator elevatorrequired
(47)*a)remove all non elevator storage.*c)repair door lock.*d) clean oil on floor.(51)provide in cab capacity plate 1800lbs.(52)file a bn & obtain a permit for refurbished cab walls.(53)replace broken cab light guard.(54)clean car top
Sep 2, 1988
Dob violation - resolved - Elevator elevatorrequired
(51)provide in cab capacity plate 1800lbs.(52)file a bn & obtain a permit for refurbished cab walls.(53)replace broken light guard.(54) clean car top.(55)provide l.b electric box cover under car
Sep 2, 1988
Dob violation - resolved
ECB violations · 23
- Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #911558.remedy:submit acceptable required te
Dec 2, 2022
Resolve - Class - 2
Failure to maintain exterior bldg walls&appurtenances.as noted:atoi i observed on exp1,2,4:cracked bricks&mortar joints;spalling bricks&damaged mortar joints@parapet wall&7fl.maintain exterior bldg walls;provid
Sep 23, 2022 · Penalty $620
Resolve - Class - 2
Removal of safety measures w/o"dept"approval.noted:the safety measureshave been removed w/o dept(dob)approval,even though the facade is still declared"unsafe"when.rem:submit an accept amended tr-6 facade report
Apr 23, 2014 · Penalty $400
Resolve - Class - 2
37h09,08v01,32#10,34o02,56y02,56y13,16##. 37h09-deflcts sheave worn. 16##-hatch door pivots worn numerous floors.
Aug 20, 2013 · Penalty $250
Resolve - Class - 2
38h11,34o02,56y02,56y13,32h10,03b10. 38h11-worn travelling cable; 03b10-interference on phone line to much static noise.
Aug 20, 2013 · Penalty $250
Resolve - Class - 1
1rcny 9-01 rigger failed to designated a foreman noted at time of insp no rigging foreman on site while worker was on a 2pt suspended scaffold mr rajinder singh showed up after insp was completed cert #10394 fo
Oct 11, 2011 · Penalty $1,600
Resolve - Class - 1
Noted worker on suspended scaffold did not have cert of fitness on him or a cop on site at time of insp rem: comply w/ code
Oct 11, 2011 · Penalty $1,600
Resolve - Class - 2
Noted no notification for suspended scaffold off c hooks in use at exp 2 rem: notify the dept
Oct 11, 2011 · Penalty $400
Resolve - Class - 1
Noted daily insp record show that all safety harness are free from wear & tear conditions upon insp found 3 defective harness in disrepair and had harness cut up on site to prevent future use of these belts rem
Oct 11, 2011 · Penalty $10,000
Resolve - Class - 2
100b11,34o02,39o02,59y02,57d06,16h11.(100b11)replace toe guard to 21" as per apendix k3.(57d06)hoist motor unsecured.(16h11)hatch door pivots worn.replace pivots.
Sep 30, 2010 · Penalty $2,500
Resolve
Show 13 more ↓
- Class - 3
16l10,52k11.(16l10)top pivot on 1st flr.(52k11)rusted ropes.
Sep 30, 2010 · Penalty $500
Resolve - Class - 2
Local law 6 cycle report filed as unsafe,unsafe condition existed & no measures taken to secure safety of public as per 27-129(d) & 1 rcny 32-03(b)(5)(i).no sidewalk shed,fence,netting or street closure was
Oct 8, 2008 · Penalty $4,000
Resolve - Non-hazardous
Failure to maintain exterior bldg wall/ defects are: at parapet various locations. step cracking evident previously tuck pointed. pointing has failed & resulting is required. spalling brick surface evident at
Mar 3, 2007 · Penalty $2,500
Resolve - Non-hazardous
14i11,28h1,30o2,36t16,46q3,50y14,55i11,74m7. 14-need screw. 74-fire extinguisher in mr.
Oct 24, 1997
Resolve - Non-hazardous
22d6,28h1,30o2,31m7,36t16,46q3,50y14,57i11,74m7. 31-cover all boxes inshaft. 74-fire extinguisher in mr.
Oct 24, 1997
Resolve - Non-hazardous
9m, 570, 740. 2 car door gibs. clean top of car.
May 9, 1995
Resolve - Non-hazardous
40l, 10#, 9m, 570. eliminate excessive noise. provide sound. provide2 gibs.
May 9, 1995
Resolve - Non-hazardous
35# 75# 35# properly secure smoke hole grating 75# perform 5 year test properly tag device and file elev 3 form
Oct 26, 1993
Resolve - Non-hazardous
35# 75# 35# properly secure smoke hole grating 75# prform 5 year test properly tag device and file elev 3 form
Oct 26, 1993
Resolve - Non-hazardous
03o,35o,57o,63l, 03-top of elevator.
Feb 5, 1993
Resolve - Non-hazardous
26i,#(26) provide missing rubber roller on upper normal limit.
Aug 19, 1991 · Penalty $75
Resolve - Non-hazardous
21l,8v,03m,03i,03o, #(03)capacity plate & clean top of car.
Jul 23, 1990
Resolve - Non-hazardous
40l,8v,26i,03m,03o,62m, #(26)top.roller. #(03)capacity plate & clean top of car. #(62)cover for "lb" light cable travler.
Jul 23, 1990 · Penalty $75
Resolve
Complaints
- Unsanitary condition
Sewage
May 26, 2026 · Apt 1G
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 6, 2021 · Apt 6C
Close - Door/window
Window frame
May 5, 2020 · Apt 5F
Close - Unsanitary condition
Pests
May 5, 2020 · Apt 5K
Close - Heat/hot water
Apartment only
May 5, 2020 · Apt 5F
Close - Safety
Smoke detector
May 5, 2020 · Apt 5F
Close - Safety
Sprinkler
May 5, 2020 · Apt 5F
Close - Safety
Smoke detector
May 5, 2020 · Apt 5F
Close - Safety
Carbon monoxide detector
May 5, 2020 · Apt 5F
Close
Show 39 more ↓
- Flooring/stairs
Floor
May 5, 2020 · Apt 5F
Close - Electric
No lighting
May 5, 2020 · Apt 5F
Close - Electric
Wiring
May 5, 2020 · Apt 5F
Close - Plumbing
Basin/sink
May 5, 2020 · Apt 5F
Close - Plumbing
Basin/sink
May 5, 2020 · Apt 5F
Close - General
Cooking gas
May 5, 2020 · Apt 5F
Close - Paint/plaster
Ceiling
Feb 10, 2020 · Apt BASEME
Close - Paint/plaster
Wall
Feb 10, 2020 · Apt BASEME
Close - Flooring/stairs
Floor
Feb 10, 2020 · Apt BASEME
Close - Flooring/stairs
Floor
Feb 10, 2020 · Apt BASEME
Close - Unsanitary condition
Mold
Feb 10, 2020 · Apt BASEME
Close - Heat/hot water
Entire building
Oct 29, 2019 · Apt 6A
Close - Plumbing
Basin/sink
Oct 18, 2019 · Apt 5F
Close - Appliance
Electric/gas range
Oct 18, 2019 · Apt 5F
Close - Electric
Wiring
Oct 18, 2019 · Apt 5F
Close - Flooring/stairs
Floor
Oct 18, 2019 · Apt 5F
Close - Plumbing
Basin/sink
Oct 18, 2019 · Apt 5F
Close - Electric
No lighting
Oct 18, 2019 · Apt 5F
Close - Water leak
Heavy flow
Jul 23, 2017 · Apt 5F
Close - Paint/plaster
Ceiling
Dec 6, 2016 · Apt 4J
Close - Paint/plaster
Wall
Dec 6, 2016 · Apt 4J
Close - Heat/hot water
Entire building
Nov 7, 2016 · Apt 5
Close - Paint/plaster
Ceiling
Oct 10, 2016 · Apt 4J
Close - Paint/plaster
Wall
Oct 10, 2016 · Apt 4J
Close - Paint/plaster
Wall
Mar 8, 2016 · Apt 6H
Close - Paint/plaster
Ceiling
Mar 8, 2016 · Apt 6H
Close - Water leak
Slow leak
Mar 8, 2016 · Apt 6H
Close - Unsanitary condition
Mold
Mar 8, 2016 · Apt 6H
Close - Plumbing
Water supply
Mar 6, 2016 · Apt 6H
Close - Paint/plaster
Ceiling
Dec 21, 2015 · Apt 6H
Close - Water leak
Heavy flow
Dec 21, 2015 · Apt 6H
Close - Paint/plaster
Wall
Dec 21, 2015 · Apt 6H
Close - Unsanitary condition
Mold
Dec 21, 2015 · Apt 6H
Close - Electric
Lighting
Nov 6, 2007 · Apt 4B
Close - General
Floor
Nov 6, 2007 · Apt 4B
Close - Plumbing
Shower-stall
Nov 6, 2007 · Apt 4B
Close - Plumbing
Basin/sink
Nov 6, 2007 · Apt 4B
Close - General
Doors
Apr 30, 2007 · Apt 1J
Close - General
Doors
Apr 30, 2007 · Apt 1J
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1938
- Floors
- 6
- Residential units
- 72
- Building area
- 82,767 ft²
- Lot area
- 28,000 ft²
- Zoning
- R7A
- Community board
- 409
- Council district
- 29
- Block / lot
- 9246 / 305
- Assessed value
- $2,928,150
- Landmark / historic district
- No
HPD registration #402826, last renewed Sep 11, 2025.
Questions about 124-16 84 Road
Who owns 124-16 84 Road?
The owner of record in NYC Department of City Planning PLUTO data is Cretwood Apartment Owners.
Does 124-16 84 Road have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 124-16 84 Road rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 7% of its 72 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 124-16 84 Road built?
City records list 1938 as the year it was built.
How many apartments are in 124-16 84 Road?
It has 72 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.