roofy

150-10 79 Avenue

Queens, NY 11367BBL 4-06712-0032Map

Owner of record: Dayton Small Realty Co., INC.

150-10 79 Avenue is an elevator apartment building built in 1961 in Queens, 11367. It has 60 residential units across 6 floors. The owner of record is Dayton Small Realty Co., INC.. HPD has recorded 39 housing violations here, most recently on March 11, 2026. 5 of the 39 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.

HPD violations
39
DOB violations
23
ECB violations
4
HPD complaints
106

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
19
About 32% of the building's 60 apartments
Up from 18 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 39

  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south original violation 18705147 issued 11-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 11, 2026 · Apt 2C

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2C

    Open — Certification postponment denied
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d , 2nd story, 1st apartment from north at east

    Dec 31, 2025 · Apt 2D

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d , 2nd story, 1st apartment from north at east

    Dec 31, 2025 · Apt 2D

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west

    Nov 22, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Nov 22, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 22, 2025

    Open — Invalid certification
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2e, 2nd story, 3rd apartment from north at east

    Nov 22, 2025 · Apt 2E

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 3rd apartment from north at east

    Nov 22, 2025 · Apt 2E

    Open — Invalid certification
Show 29 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective latch compactor closet door at public hall, 6th story, section ''a-f'', at east

    Nov 11, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch assembly on compactor closet door at public hall, 6th story, section ''a-f'', at east

    Nov 11, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges bulkhead door to roof at public hall, 6th story, section ''a-f'', at east

    Nov 11, 2024

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of kickdown door stopper installed on 1st door from west at north public hall at cellar, section ''west''

    Nov 11, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch assembly at door at vestibule at cellar entrance story at public hall

    Oct 28, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch assembly at door leading to garbage/refuse room at cellar entrance story at public hall

    Oct 28, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch assembly at door at vestibule cellar entrance story at public hall

    Oct 28, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch assembly and hinges at door leading to garbage/refuse room at cellar entrance story at public hall

    Oct 28, 2024

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing angle iron l- bracket, bottom front return rail, west of building front entrance at fire escape, 5th story

    Jul 21, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jul 21, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 21, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box . at public hall

    Jul 21, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 18, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective the fire door leading to west section at basement

    Jan 10, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective fire door to west section at basement at public hall

    Dec 31, 2022

    Closed — Violation closed
  • A

    Refit fire door to west section at basement at public hall

    Dec 31, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6k, 6th story, 4th apartment from east at south

    Dec 31, 2022 · Apt 6K

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 6k, 6th story, 4th apartment from east at south

    Dec 31, 2022 · Apt 6K

    Closed — Violation closed
  • A

    Refit entrance door in the entrance located at apt 6k, 6th story, 4th apartment from east at south

    Dec 31, 2022 · Apt 6K

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement story public hall at boiler room

    Dec 31, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 2nd apartment from east at south

    Dec 21, 2021 · Apt 2F

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 2nd apartment from east at south

    Dec 21, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Code: arrange and make self-closing the doors in the entrance located at apt 2f, 2nd story, 2nd apartment from east at south

    Dec 21, 2021 · Apt 2F

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate for egress in the 1st room from north located at apt 1a, 2nd story, 1st apartment from east at south

    May 18, 2017 · Apt 1A

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of bicycles, baby strollers and other house hold items at public hall, 1st story

    May 18, 2017

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 18, 2017

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at garage

    May 6, 2016

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floor at elevator

    May 6, 2016

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Dec 5, 2013

    Closed — Violation dismissed

DOB building violations · 23

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 30, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 19, 2021

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 2, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 16, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2013

    Dob violation - resolved
Show 13 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2008

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 30, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    4p3678

    Oct 30, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    4p3678

    Jun 29, 1999

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Improper fusing on the controller 2 of them bypass(cu). provide overspeed switch for car governor controller has a drive(cu). adjust car door fully opend. in car position indicator defective. properly size all

    Jan 5, 2022 · Penalty $1,250

    Active
  • Class - 2

    19m07,05m07. 19m- provide hoistway door safety retainers {2 brackets}.05m- provide door zone lock.

    Jan 14, 2013

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building dept. change of use from side yard to parking cars, no curb cut. remedy: discontinue illegal use or ammend c of o.

    Nov 29, 1994

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building department records. change of use from: side yard to: parking cars, no curb cut. remedy: discontinue illegal use or amend c of o

    May 31, 1994

    Resolve

Complaints

  • Electric

    Outlet/switch

    Feb 1, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Feb 1, 2026 · Apt 2C

    Close
  • Water leak

    Heavy flow

    Feb 1, 2026 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2025 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2025 · Apt 2C

    Close
  • Appliance

    Electric/gas range

    Nov 20, 2025 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Nov 20, 2025 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2025 · Apt 2C

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Mar 4, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 2E

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 26, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2024 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Jul 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2023 · Apt 6F

    Close
  • Door/window

    Door

    Sep 9, 2023 · Apt L2

    Close
  • Door/window

    Door

    Sep 9, 2023 · Apt L2

    Close
  • Plumbing

    Toilet

    Sep 9, 2023 · Apt L2

    Close
  • Door/window

    Window pane

    Sep 9, 2023 · Apt L2

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 25, 2022 · Apt L1

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2022 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2022 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2021 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Nov 24, 2021 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 27, 2021 · Apt BLDG

    Close
  • Electric

    Power outage

    Aug 31, 2021 · Apt GRD

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2021 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2020 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2019 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2019 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Oct 21, 2019 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2018 · Apt 6A

    Close
  • Electric

    Power outage

    Aug 15, 2018 · Apt L2

    Close
  • Electric

    Power outage

    Jun 21, 2018 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1961
Floors
6
Residential units
60
Building area
55,662 ft²
Lot area
20,151 ft²
Zoning
R4
Community board
408
Council district
24
Block / lot
6712 / 32
Assessed value
$1,965,600
Landmark / historic district
No

HPD registration #420030, last renewed Jul 22, 2026.

Questions about 150-10 79 Avenue

Who owns 150-10 79 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Dayton Small Realty Co., INC..

Does 150-10 79 Avenue have violations?

Yes. NYC HPD has recorded 39 housing violations at this property.

Is 150-10 79 Avenue rent stabilized?

NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 32% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 150-10 79 Avenue built?

City records list 1961 as the year it was built.

How many apartments are in 150-10 79 Avenue?

It has 60 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.