150-18 75 Avenue
Queens, NY 11367BBL 4-06704-0001Map
Owner of record: Kew Gardens Hills, LLC
150-18 75 Avenue is a walk-up apartment building built in 1950 in Queens, 11367. It has 144 residential units across 3 floors. The owner of record is Kew Gardens Hills, LLC. HPD has recorded 1,696 housing violations here, most recently on October 4, 2026. 50 of the 50 most recent violations are still open. City tax records listed 137 rent-stabilized apartments here in 2024.
- HPD violations
- 1,696
- DOB violations
- 107
- ECB violations
- 3
- HPD complaints
- 3,446
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,696
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3g, 3rd story, 1st apartment from south at west
Oct 4, 2026 · Apt 3G
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the caulking along sink at counter top at west wall in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Oct 4, 2026 · Apt 3G
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the grout at east and south walls in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
Oct 4, 2026 · Apt 3G
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft observed at ceiling and west wall in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
Oct 4, 2026 · Apt 3G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective lock and latch set located in the entrance to building , 1st story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover at all electrical outlets at public hall, 1st story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover at all electrical outlets at public hall, 2nd story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover at all electrical outlets at public hall, 3rd story
Oct 2, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at norht wall in the 1st room from north located at apt 2f, 2nd story, 1st apartment from east at south
Oct 1, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Oct 1, 2026 · Apt 2F
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and westt wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south
Oct 1, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Oct 1, 2026 · Apt 2F
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 1st room from east at south located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east at north located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking device assembly at building front entrance door at public hall, 1st story
Sep 30, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the kitchen located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell buzzer from building front entrance to north wall in the foyer located at apt 1e, 1st story, 1st apartment from east at south
Sep 30, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Sep 28, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Sep 17, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2H
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 2h, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east located at apt 2h, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2H
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerator doors in the kitchen located at apt 2c, 2nd story, 2nd apartment from east at south
Sep 2, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at door to yard on west wall at public hall, 1st story
Aug 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies all stories at north stack building front at fire escape
Aug 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom , the 3rd room from north at west located at apt 2a, 2nd story, 1st apartment from south at west
Aug 27, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Aug 27, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Aug 27, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 3rd room from north at west located at apt 2a, 2nd story, 1st apartment from south at west
Aug 27, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Aug 27, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Aug 26, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Aug 26, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Aug 26, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north
Aug 23, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north
Aug 23, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north
Aug 23, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north
Aug 23, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at south, the bathroom located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door , 1st story
Aug 14, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at south located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 9, wg to repair = 2 in the entire apartment located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2g, 2nd story, 1st apartment from east at south
Aug 14, 2026 · Apt 2G
Open — Notice of issuance sent to tenant
DOB building violations · 107
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Oct 16, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Sep 1, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
ECB violations · 3
- Class - 3
Work does not conform to approved construction documents and/or approved amendments for job #440426807. noted: (1)plan shows railing on both sides of the ramp found railing on only one side.(2)ramp access to bu
Oct 16, 2017 · Penalty $100
Resolve - Non-hazardous
Failure to maintain defect is: at west side of the bldg there is drop apr.12"-15" between surface of sidewalk and ground level.rem:make conform to the bldg code, maintain surfaces.
Apr 20, 2001 · Penalty $180
Resolve - Non-hazardous
Failure to maintain.defect is:at the west side of the bldg there is drop appr.12'-15'between surface of sidewalk and the ground.also crack at sidewalk.rem:repair and make safety-raise ground level around sidewa
Jan 11, 2001 · Penalty $350
Resolve
Complaints
- Plumbing
Bathtub/shower
Oct 10, 2026 · Apt 1D
Open - Water leak
Slow leak
Oct 9, 2026 · Apt 3E
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 3E
Open - Unsanitary condition
Mold
Oct 9, 2026 · Apt 3E
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 2G
Open - Unsanitary condition
Mold
Oct 9, 2026 · Apt 2G
Open - Paint/plaster
Ceiling
Oct 8, 2026 · Apt 2H
Open - Paint/plaster
Ceiling
Oct 8, 2026 · Apt 2H
Open - Unsanitary condition
Mold
Oct 8, 2026 · Apt 2H
Open - Unsanitary condition
Pests
Oct 8, 2026 · Apt 2H
Open
Show 40 more ↓
- Unsanitary condition
Mold
Oct 8, 2026 · Apt 1B
Open - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 6, 2026 · Apt 1F
Open - Unsanitary condition
Pests
Oct 6, 2026 · Apt 1F
Open - Electric
No lighting
Oct 4, 2026 · Apt 1A
Open - Appliance
Electric/gas range
Oct 4, 2026 · Apt 1A
Open - Paint/plaster
Ceiling
Sep 30, 2026 · Apt 2B
Open - General
Cabinet
Sep 29, 2026 · Apt 3G
Open - Electric
Power outage
Sep 29, 2026 · Apt 3G
Open - Appliance
Refrigerator
Sep 29, 2026 · Apt 3G
Open - Unsanitary condition
Mold
Sep 29, 2026 · Apt 3G
Open - General
Bell/buzzer/intercom
Sep 27, 2026 · Apt 3A
Open - Door/window
Door
Sep 27, 2026 · Apt 3A
Open - Plumbing
Toilet
Sep 27, 2026 · Apt 3A
Open - Plumbing
Toilet
Sep 27, 2026 · Apt 3A
Open - Paint/plaster
Ceiling
Sep 24, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 1B
Close - Paint/plaster
Wall
Sep 24, 2026 · Apt 1B
Close - General
Bell/buzzer/intercom
Sep 24, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Sep 24, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Sep 24, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt 1E
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 1E
Close - Flooring/stairs
Floor
Sep 23, 2026 · Apt 1E
Close - Plumbing
Bathtub/shower
Sep 21, 2026 · Apt 1E
Open - General
Bell/buzzer/intercom
Sep 21, 2026 · Apt 1E
Open - Plumbing
Bathtub/shower
Sep 21, 2026 · Apt 1E
Open - Unsanitary condition
Pests
Sep 18, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 17, 2026 · Apt 1E
Close - Unsanitary condition
Mold
Sep 17, 2026 · Apt 1E
Close - Water leak
Slow leak
Sep 17, 2026 · Apt 1E
Close - Unsanitary condition
Garbage/recycling storage
Sep 16, 2026 · Apt BLDG
Open - Electric
Power outage
Sep 16, 2026 · Apt 3A
Open - Unsanitary condition
Pests
Sep 7, 2026 · Apt 2H
Close - Paint/plaster
Ceiling
Sep 7, 2026 · Apt 2H
Close - Water leak
Slow leak
Sep 7, 2026 · Apt 2H
Close - Plumbing
Bathtub/shower
Sep 3, 2026 · Apt 1D
Close - General
Bell/buzzer/intercom
Sep 3, 2026 · Apt 1D
Close - Appliance
Electric/gas range
Sep 3, 2026 · Apt 1D
Close - Door/window
Window frame
Aug 24, 2026 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1950
- Floors
- 3
- Residential units
- 144
- Building area
- 116,784 ft²
- Lot area
- 120,000 ft²
- Zoning
- R4
- Community board
- 408
- Council district
- 24
- Block / lot
- 6704 / 1
- Assessed value
- $5,553,900
- Landmark / historic district
- No
HPD registration #409611, last renewed Oct 8, 2025.
Questions about 150-18 75 Avenue
Who owns 150-18 75 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kew Gardens Hills, LLC.
Does 150-18 75 Avenue have violations?
Yes. NYC HPD has recorded 1,696 housing violations at this property.
Is 150-18 75 Avenue rent stabilized?
NYC Department of Finance tax bills listed 137 rent-stabilized units here in 2024 (about 95% of its 144 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 150-18 75 Avenue built?
City records list 1950 as the year it was built.
How many apartments are in 150-18 75 Avenue?
It has 144 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.