42-18 201 Street
Queens, NY 11361BBL 4-06258-0016Map
Owner of record: Pandora Realty LLC
42-18 201 Street is a walk-up apartment building built in 1950 in Queens, 11361. It has 54 residential units across 3 floors. The owner of record is Pandora Realty LLC. HPD has recorded 58 housing violations here, most recently on August 26, 2026. 4 of the 50 most recent violations are still open. City tax records listed 52 rent-stabilized apartments here in 2024.
- HPD violations
- 58
- DOB violations
- 4
- ECB violations
- 7
- HPD complaints
- 59
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north 1 fire escape at west
Aug 26, 2026
Open — Nov certified on time - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft east wall in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Open — Not complied with - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 1st room from north at west, the 2nd room from north located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 2nd closet from east at south wall door frame, 1st door from north at east wall, 1st closet from east at south wall door frame in the foyer located at apt 5g, 2nd story, 2nd apartment from south at west
Dec 12, 2025 · Apt 5G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 5G
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 5G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater then 10 sqft at north wall, south wall, east wall, ceiling in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 5G
Open — First no access to re- inspect violation - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 5g, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 5G
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 5g, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 5G
Open — Certification postponment denied - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 13, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color then wall around the window in the 3rd room from east at north located at apt 5d, 4th story, apartment at south
Mar 27, 2018 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the wall around the widow in the 3rd room from east at south located at apt 5d, 4th story, apartment at south
Mar 27, 2018 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in room and inside the closet in the 3rd room from east at south located at apt 5d, 4th story, apartment at south
Mar 27, 2018 · Apt 5D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east at south located at apt 5d, 4th story, apartment at south
Mar 27, 2018 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling inside closet in the 1st room from east at north located at apt 5d, 3rd story, apartment at south
Dec 13, 2017 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling inside closet in the 1st room from east at north located at apt 5d, 3rd story, apartment at south
Dec 13, 2017 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Mar 24, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 24, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Mar 24, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Mar 24, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Mar 24, 2017
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt a6, 3rd story, 2nd apartment from south at west
Jan 18, 2017 · Apt A6
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt a6, 3rd story, 2nd apartment from south at west
Jan 18, 2017 · Apt A6
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt a6, 3rd story, 2nd apartment from south at west
Jan 18, 2017 · Apt A6
Closed — Violation dismissed - ANon-hazardous
Refit doors of sink cabinet, in the kitchen located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - ANon-hazardous
Refit doors of wall cabinets, in the kitchen located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - ANon-hazardous
Refit windows, in the entire apartment located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - ANon-hazardous
Refit closet doors, in the entire apartment located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures , in the entire apartment located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures sink,( 0 volume) in the kitchen located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures sink kitchen,( 0 voume) shutoff by land/lord. in the kitchen located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures washbasin (0 volume) shut off by land/lord. in the kitchen located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures bathroom, in the bathroom located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling, in the 1st room from east at south located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Replace with new the broken or defective medicine cabinet, in the bathroom located at apt 6f, 3rd story, 1st apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Replace with new the broken or defective door, in the bathroom located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the entire apartment located at apt 6f, 3rd story, 2nd apartment from east at south
Mar 9, 2016 · Apt 6F
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 3 sty. apt. 6f - vacate # 128053
Feb 24, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 6f, 3rd story, 1st apartment from north at east
Jan 21, 2016 · Apt 6F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling 10sq/ft west wall bathroom10sq/ft in the bathroom located at apt 6f, 3rd story, 1st apartment from west at north , section ''42-22-201 ''
Aug 20, 2012 · Apt 6F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom located at apt 6f, 3rd story, 1st apartment from west at north , section ''42-22 201 ''
Aug 20, 2012 · Apt 6F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the 2nd room from east located at apt 6f, 3rd story, section ''42-22-201''
Aug 20, 2012 · Apt 6F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at north wall. appox. 2 sq.ft. in the bathroom located at apt g8, 3rd story, 2nd apartment from south at west , section ''42-18'', at north
Mar 28, 2011 · Apt G8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the 1st room from north at west located at apt g8, 3rd story, 2nd apartment from south at west , section ''42-18'', at north
Mar 28, 2011 · Apt G8
Closed — Violation closed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply w/the commissioner's order contained in nov #34994900k issued on 12.26.12. (work w/o permit @ basement) remedy: comply w/ the commissioner's order.
Feb 25, 2014 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34994900k issued on 12/26/12. illegal plumbing/partitions @ basement. remedy: comply w/the comm's order.
Dec 27, 2013 · Penalty $12,000
Resolve - Class - 1
Failed to comply w/comm's order to correct vio #34994900k issued on 12.26.12 (illegal plumbing/partitions @ basement). remedy: comply w/comm's order.
Oct 26, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the commissioner's order to correct conditions cited in nov 34994900k issued 12.26.12 for installing partitions plumbing& gas in basementw/oa permit.remedy:comply w/the commissioner's order.
Aug 12, 2013 · Penalty $2,400
Resolve - Class - 1
Fail to comply w/commissioner's order contained in nov #34994900k issued on 12/26/2012 for work w/o a permit - erected partition walls, installed 3-pc bathroom & gas line for stove @ basement lvl.no record of c
Feb 5, 2013 · Penalty $2,400
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved number of families.dob records coq#60673 indicates premisesto be legally approved for 54 class"a"apts.(1st & 2nd & 3rd flrs) and
Dec 26, 2012 · Penalty $1,200
Resolve - Class - 1
Work w/o a permit.work noted: at basement level erected full height partitions for 3 bedrooms,bathroom,kitchen,installed water & waste line for (tub,toilet,sink)residential sink & gas line w/gas stove.rmdy:obta
Dec 26, 2012 · Penalty $1,600
Resolve
Complaints
- Safety
Fire escape
Aug 20, 2026 · Apt BLDG
Close - Door/window
Window pane
Jan 27, 2026 · Apt F
Close - Unsanitary condition
Mold
Dec 7, 2025 · Apt 5G
Close - Unsanitary condition
Mold
Nov 20, 2025 · Apt 5G
Close - Unsanitary condition
Pests
Nov 20, 2025 · Apt 5G
Close - Heat/hot water
Entire building
Oct 11, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 25, 2025 · Apt E5
Close - Water leak
Slow leak
Mar 24, 2018 · Apt 5D
Close - Unsanitary condition
Mold
Mar 24, 2018 · Apt 5D
Close - Water leak
Heavy flow
Mar 10, 2018 · Apt 5D
Close
Show 40 more ↓
- Unsanitary condition
Mold
Mar 10, 2018 · Apt 5D
Close - Paint/plaster
Ceiling
Mar 10, 2018 · Apt 5D
Close - Water leak
Slow leak
Nov 26, 2017 · Apt 5D
Close - Unsanitary condition
Mold
Nov 26, 2017 · Apt 5D
Close - Plumbing
Radiator
Jan 6, 2017 · Apt A6
Close - Paint/plaster
Wall
Mar 7, 2016 · Apt 6F
Close - Plumbing
Water supply
Mar 7, 2016 · Apt 6F
Close - Paint/plaster
Wall
Mar 7, 2016 · Apt 6F
Close - Unsanitary condition
Mold
Mar 7, 2016 · Apt 6F
Close - General
Cabinet
Mar 7, 2016 · Apt 6F
Close - Water leak
Slow leak
Mar 7, 2016 · Apt 6F
Close - Paint/plaster
Ceiling
Mar 7, 2016 · Apt 6F
Close - Paint/plaster
Wall
Mar 7, 2016 · Apt 6F
Close - Unsanitary condition
Mold
Feb 23, 2016 · Apt 6F
Close - Door/window
Door
Feb 23, 2016 · Apt 6F
Close - Paint/plaster
Wall
Feb 23, 2016 · Apt 6F
Close - General
Cabinet
Feb 23, 2016 · Apt 6F
Close - Paint/plaster
Wall
Feb 23, 2016 · Apt 6F
Close - Paint/plaster
Wall
Feb 23, 2016 · Apt 6F
Close - Paint/plaster
Wall
Feb 23, 2016 · Apt 6F
Close - Paint/plaster
Ceiling
Feb 23, 2016 · Apt 6F
Close - Heating
Heat related
Jan 27, 2014 · Apt NA
Close - Heating
Heat related
Jan 27, 2014 · Apt 2G
Close - Heating
Heat related
Jan 23, 2014 · Apt 5G
Close - Heating
Heat related
Jan 6, 2014 · Apt 1G
Close - Heating
Heat related
Nov 1, 2012 · Apt 2G
Close - Heating
Heat related
Oct 15, 2012 · Apt NA
Close - Paint/plaster
Wall
Aug 30, 2012 · Apt E3
Close - Electric
Lighting
Aug 30, 2012 · Apt E3
Close - Paint/plaster
Wall
Aug 30, 2012 · Apt E3
Close - General
Mold
Aug 14, 2012 · Apt 6F
Close - Heating
Heat related
Oct 29, 2011 · Apt BLDG
Close - Paint/plaster
Wall
Mar 8, 2011 · Apt G8
Close - Paint/plaster
Ceiling
Mar 8, 2011 · Apt G8
Close - Paint/plaster
Wall
Mar 8, 2011 · Apt G8
Close - General
Windows
Mar 8, 2011 · Apt G8
Close - General
Windows
Mar 8, 2011 · Apt G8
Close - Paint/plaster
Wall
Mar 8, 2011 · Apt G8
Close - Paint/plaster
Wall
Mar 8, 2011 · Apt G8
Close - Paint/plaster
Wall
Mar 8, 2011 · Apt G8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1950
- Floors
- 3
- Residential units
- 54
- Building area
- 44,100 ft²
- Lot area
- 42,500 ft²
- Zoning
- R3-2
- Community board
- 411
- Council district
- 19
- Block / lot
- 6258 / 16
- Assessed value
- $2,925,450
- Landmark / historic district
- No
HPD registration #417617, last renewed Jul 28, 2026.
Questions about 42-18 201 Street
Who owns 42-18 201 Street?
The owner of record in NYC Department of City Planning PLUTO data is Pandora Realty LLC.
Does 42-18 201 Street have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 42-18 201 Street rent stabilized?
NYC Department of Finance tax bills listed 52 rent-stabilized units here in 2024 (about 96% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 42-18 201 Street built?
City records list 1950 as the year it was built.
How many apartments are in 42-18 201 Street?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.