40-35 190 Street
Queens, NY 11358BBL 4-05355-0008Map
Owner of record: 40 190th St Mgt LLC
40-35 190 Street is a walk-up apartment building built in 1926 in Queens, 11358. It has 16 residential units across 4 floors. The owner of record is 40 190th St Mgt LLC. HPD has recorded 15 housing violations here, most recently on January 14, 2026. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 15
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 99
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
Jan 14, 2026
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing guide stop at guide rods building west at fire escape
Feb 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 29, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 29, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at public hall, 1st story
Jan 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 25, 2021
Closed — Violation dismissed
Show 5 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jan 25, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective closet doors. in the 3rd bedroom from east located at apt 3a, 3rd story, 1st apartment from south at west
Sep 11, 2014 · Apt 3A
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass lower sash southwest window. in the 3rd bedroom from east located at apt 3a, 3rd story, 1st apartment from south at west
Sep 11, 2014 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair the broken or defective top and bottom window sash. in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Sep 11, 2014 · Apt 3A
Closed — Violation closed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to post or distribute safe construction bill of rights. noted:contractor is actively working on alt3 app#440541503 and has failed topost or distribute the safe construction bill of rights to the tenants
Apr 15, 2019
Resolve - Class - 2
Failure to notify the dept,72 hours prior to commencement of work. noted:contractor is actively working on alt3 app#440541503 and has failedto provide notification to the dept prior to the commencement of work.
Apr 15, 2019
Resolve - Class - 2
Failure to post or distribute notice of tpp. noted:contractor is actively working on alt3 app#440541503 and has failed to post or distribute"notice of tenant protection plan" to the tenants of this occupied bui
Apr 15, 2019
Resolve
Complaints
- Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt Z
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 10
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Apr 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 4
- Residential units
- 16
- Building area
- 10,200 ft²
- Lot area
- 4,500 ft²
- Zoning
- R3X
- Community board
- 411
- Council district
- 19
- Block / lot
- 5355 / 8
- Assessed value
- $581,400
- Landmark / historic district
- No
HPD registration #403763, last renewed Sep 6, 2025.
Questions about 40-35 190 Street
Who owns 40-35 190 Street?
The owner of record in NYC Department of City Planning PLUTO data is 40 190th St Mgt LLC.
Does 40-35 190 Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 40-35 190 Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 31% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 40-35 190 Street built?
City records list 1926 as the year it was built.
How many apartments are in 40-35 190 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.