41-60 Bowne Street
Queens, NY 11355BBL 4-05181-7502Map
Owner of record: Bowne LLC
41-60 Bowne Street is a condominium built in 1921 in Queens, 11355. It has 64 residential units across 6 floors. The owner of record is Bowne LLC. HPD has recorded 277 housing violations here, most recently on September 13, 2026. 8 of the 50 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 277
- DOB violations
- 10
- ECB violations
- 4
- HPD complaints
- 304
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 277
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 6th story balcony at fire escape at building front
Sep 13, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 4th story balcony at fire escape at building front
Sep 13, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air-conditioner protruding beyond window sill at 3rd story balcony at fire escape at building front
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective lower sash counter balance spring at south 1 window in the 3rd room from east located at apt 3g, 3rd story, 2nd apartment from north at east
Jul 22, 2026 · Apt 3G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3g, 3rd story, 2nd apartment from north at east
Jul 22, 2026 · Apt 3G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3g, 3rd story, 2nd apartment from north at east
Jul 22, 2026 · Apt 3G
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at east
Jul 22, 2026 · Apt 3G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at east
Jul 22, 2026 · Apt 3G
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 5b, 5th story, 2nd apartment from west at north
Oct 16, 2024 · Apt 5B
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Oct 16, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1k, 1st story, 1st apartment from south at west
May 31, 2024 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1k, 1st story, 1st apartment from south at west
May 31, 2024 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1k, 1st story, 1st apartment from south at west
May 31, 2024 · Apt 1K
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket at upper door of refrigerator in the kitchen located at apt 1k, 1st story, 1st apartment from south at west
May 31, 2024 · Apt 1K
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at 2nd stack from south at building east at fire escape
Apr 18, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch assembly at building entrance door at public hall, 1st story
Apr 18, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance at public hall, 1st story
Apr 18, 2024
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate from top front rail to top west return rail at 4th story balcony on south stack at building front, section 41-60 bowne street at fire escape
Sep 16, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate from top front rail to top west return rail at 4th story balcony on north stack at building front, section 41-60 bowne street at fire escape
Sep 16, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate from top front rail to top west return rail at 3rd story balcony on north stack at building front, section 41-60 bowne street at fire escape
Sep 16, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6e, 6th story, 1st apartment from south at west , section at north
Sep 10, 2023 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 6e, 6th story, 1st apartment from south at west , section at north
Sep 10, 2023 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building front entrance door at public hall, 1st story
Sep 5, 2023
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at the west wall at public hall, 4th story
Jan 12, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Feb 10, 2022 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic tiles at north wall, south wall, and west wall in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Feb 10, 2022 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective ceramic floor tiles (approx. 25 sq ft) in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Feb 10, 2022 · Apt 5E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Feb 10, 2022 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 8, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 1st story, 1st apartment from east at south
Jan 8, 2022 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the kitchen , the 3rd room from north, the 1st room from north at east located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door lock in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from north located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the 1st room from north at east located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 8 sq ft at the south and east wall in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Nov 9, 2021 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east , section ''north''
Jun 18, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east , section ''north''
Jun 18, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed
DOB building violations · 10
- Construction other optional
Failure to maintain building exterior facade and appurtenances.note at exp1 east courtyard setback north facing wall on 4th floor a piece of wood hanging from ac bracket.remedy:immediately remove piece of wood,m aintain building exterior facade and appurtenances as per 1rcny 103-04
Jul 3, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2019
Dob violation - resolved - Elevator elevatorrequired
Non elevator house lock remove from bsmt. hoistway door.(33)remov noise from overhead room sheaves.(35)post elevator co. sign.(05)proper vision guard.(03)cean car top, replace missing covers and car top ligh (32)shaftway electric box covers.(15)door checks.(03)remove paint from in cab capacity plate or replace same.(17)repl. brkn glass w/clear wir
Jan 10, 1990
Dob violation - resolved
ECB violations · 4
- Class - 2
Failure to maintain building exterior facade and appurtenances.-note: at time of inspection, i observed flower pots exp. #3 west 4th fl. fe.remedy: maintain building exterior facade and appurtenances, remove al
Jul 3, 2024 · Penalty $1,250
Resolve - Class - 2
2 amp fuse jump on the controller.
May 4, 2021
Resolve - Class - 2
56y02,56y13,40r09,70o02,42d06,08v01,05j01,20i11,67x10,10h11,14l11. 40r09-remove non-elevator related equipment out of machine room; 42d06-unsecured door () on controller; 05j01-adjust gap between doors.
Dec 3, 2015 · Penalty $250
Resolve - Class - 2
59y02,01b10,08v01,67x10,34e01. 01b10-no alarm on stop sw
Dec 3, 2015 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Sep 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 10, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jul 20, 2026 · Apt 3G
Close - Paint/plaster
Ceiling
Jul 20, 2026 · Apt 3G
Close - Water leak
Slow leak
Jul 20, 2026 · Apt 3G
Close - General
Bell/buzzer/intercom
Jun 18, 2026 · Apt 4C
Close - General
Bell/buzzer/intercom
Jun 18, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Apr 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Door/window
Window pane
May 12, 2025 · Apt 1H
Close - Heat/hot water
Entire building
Dec 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2024 · Apt BLDG
Close - Door/window
Window frame
May 29, 2024 · Apt 1STFLO
Close - Unsanitary condition
Mold
May 29, 2024 · Apt 1STFLO
Close - Unsanitary condition
Pests
May 29, 2024 · Apt 1K
Close - Unsanitary condition
Pests
Apr 26, 2024 · Apt 1K
Close - Unsanitary condition
Pests
Apr 26, 2024 · Apt 1K
Close - Heat/hot water
Entire building
Apr 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2023 · Apt BLDG
Close - Water leak
Heavy flow
Aug 28, 2023 · Apt 6E
Close - Water leak
Damp spot
Aug 28, 2023 · Apt 6E
Close - Heat/hot water
Entire building
Apr 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt 1C
Close - Heat/hot water
Entire building
Nov 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 1921
- Floors
- 6
- Residential units
- 64
- Building area
- 43,470 ft²
- Lot area
- 11,926 ft²
- Zoning
- R7-1
- Community board
- 407
- Council district
- 20
- Block / lot
- 5181 / 7502
- Assessed value
- $2,297,249
- Landmark / historic district
- No
HPD registration #400335, last renewed Jun 25, 2026.
Questions about 41-60 Bowne Street
Who owns 41-60 Bowne Street?
The owner of record in NYC Department of City Planning PLUTO data is Bowne LLC.
Does 41-60 Bowne Street have violations?
Yes. NYC HPD has recorded 277 housing violations at this property.
Is 41-60 Bowne Street rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 64% of its 64 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 41-60 Bowne Street built?
City records list 1921 as the year it was built.
How many apartments are in 41-60 Bowne Street?
It has 64 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.