17-11 Hancock Street
Queens, NY 11385BBL 4-03560-0045Map
Owner of record: Hancock St Residence LLC
17-11 Hancock Street is an elevator apartment building built in 2022 in Queens, 11385. It has 60 residential units across 7 floors. The owner of record is Hancock St Residence LLC. HPD has recorded 17 housing violations here, most recently on September 6, 2026. 3 of the 17 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 17
- DOB violations
- 3
- ECB violations
- 26
- HPD complaints
- 43
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft observed at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Sep 6, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 5d, 5th story, 5th apartment from south at west
Jun 19, 2026 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 5d, 5th story, 5th apartment from south at west
Jun 19, 2026 · Apt 5D
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective drawer at sink base cabinet in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Open — False certification - BHazardous
Properly repair with similar material the broken or defective laminated wood floor in the 1st room from north at west located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Properly secure the loose mortise lock assembly at door in the entrance located at apt 3b, 3rd story, 2nd apartment from west at north
Jun 2, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 2nd story
Mar 12, 2026
Closed — Violation dismissed
Show 7 more ↓
- BHazardous
Properly repair with similar material the broken or defective grout at ceramic tiles at south and west walls in the entire apartment located at apt 4a, 4th story, 2nd apartment from west at north
Apr 11, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2h, 2nd story, 4th apartment from east at south
Jan 3, 2024 · Apt 2H
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room locked at public hall at cellar story at boiler room
Nov 23, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Nov 23, 2023 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Nov 23, 2023 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2023
Closed — Violation dismissed
DOB building violations · 3
- Construction other optional
Special inspector, alberto roman, pe surrendered all filing privileges. job# q00658148-i1.
Aug 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed
ECB violations · 26
- Class - 2
I observed material storage in roadway contrary to ssp & dot permit q02-2022192-a12, missing barriers adjacent to the pedestrian walkway, causing a danger to the public (open debris container with concrete, sha
Jul 17, 2022 · Penalty $5,000
Resolve - Class - 1
3303.7.2 fire extinguishers-expired inspections.at time of inspection at a 7 story new building,i observed all fire extinguishers have expired tags-no inspection as required by nyc fire code.remedy:comply with
Mar 7, 2022
Resolve - Class - 2
Failure to post"no smoking"signs at construction/demolition sites per fire code.at time of my inspection at a 7 story new building,i did notobserved"no smoking"signs throughout all building.no smoking signs sha
Mar 7, 2022 · Penalty $625
Resolve - Class - 1
Failure to comply with manufacturer's specifications.at time of my inspection at an active jobsite 7 story new building,i observed plastic barriers at exp1 on street.barriers not filled and not connected as per
Mar 7, 2022
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments-sidewalk shed.at the time of inspection at an active jobsite 7 story new building,i observed sws at exp1 was not built as per
Mar 7, 2022
Resolve - Class - 1
3303.4.1.1 pedestrian sidewalk-maintainance.at time of inspection at an active jobsite 7 story new building,i observed at exp1 public sidewalk not maintained.sidewalk severely cracked,uneven with holes.this con
Mar 7, 2022
Resolve - Class - 1
Failure to comply w/manufacturer specs atoi on active 7sty proposed nbjobsite i observed 3workers onsite w/i use harnesses,upon insp of harnesses i observed insp tags havent been initialed,dated&date of 1st use
Dec 15, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/dot regs atoi on active 7stynb jobsite i observed roadway occupied w/barriers,concrete washout box,&work truck-upon inspon dot permits observed all dot permits expired as of12/13/21.renew do
Dec 15, 2021 · Penalty $625
Resolve - Class - 1
Site contrary to ssp.atoi on active 7stynb jobsite (currently on 3fl) when reviewing ssp i observed adj property (56-40myrtleave) being usedas material storage&site office&connected to jobsite@exp3-this egress&
Dec 15, 2021 · Penalty $625
Resolve - Class - 1
Work contrary to design drawings-sws atoi on active 7sty proposed nb jobsite i observed sws installed@exp1,2-uponrev of sws i observed installation contrary to design drawings due to following conditions:(1)2dr
Dec 15, 2021 · Penalty $625
Resolve
Show 16 more ↓
- Class - 2
Failure to maintain jobsite fence/inadequate atoi on active 7sty proposed nb jobsite i observed const fence initialed@exp1 w/viewing panel missing plexiglass &/or any nonfrangible material.maintain jobsite fenc
Dec 15, 2021 · Penalty $500
Resolve - Class - 1
Sec. bc3307.4 warning signs & barriers. note: at the time of my inspection of an 7 sty bldg w/construction work in progress at exp#1. i observed an concrete washout box adjacent to site w/o barriers in place to
Dec 2, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain/display documents required by bc chapter 33.at time of inspection observed form work being done at exp #4.asked for design drawings for formwork none were provided at time of inspection.all
Oct 4, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply with manufacturer's specifications.at time of inspection observed plastic barriers at exp #1 in street.observed barriers not filled as per manufacturer specifications.filling them creates prot
Oct 4, 2021 · Penalty $625
Resolve - Class - 1
Bc3303.4.8 machinery atoi of demo site observed,@exp1 excavator machine on st w/no barriers or shield.all exposed electrically charged,moving or otherwise dangerous parts of machines&const or demo equipment sha
May 15, 2021 · Penalty $625
Resolve - Class - 1
Unlawful acts-unlawfully continued work while on notice of stop work order.at time of inspection of active demolition job site with 6 workers observed site under full stop work order issued 5/12/21 with job # 4
May 13, 2021 · Penalty $5,000
Resolve - Class - 1
Unlawful acts:unlawfully continued work while on notice of stop work order.note:at the time of inspection of an active demolition site with(6)workers,i observed that this job site was under a full stop work ord
May 13, 2021
Resolve - Class - 2
Failure to provide job site logs for inspection.at time of inspection of active job site under demolition with 6 workers.request for construction superintendent job site logs to verify compliance none was avail
May 13, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain record of orientation preformed at job site.at time of inspection of active job site under demolition with 6 workers.request for workers orientation logs for each worker as required none was
May 13, 2021 · Penalty $625
Resolve - Class - 1
No competent person on site.at time of inspection of active job site under demolition with 6 workers. request for competent person for demolition oeprations none was available or provided.stop all work on this
May 13, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain and provide record of pre-shift safety meeting preformed prior to start of shift.at time of inspection of active job site under demolition operations with 6 workers.request for job site pre-
May 13, 2021 · Penalty $625
Resolve - Class - 2
Failure to institute&maintain safe equipment measure note:ato my insp of demo const site@exp2,i observed missing const fence where neighboring can enter into site.i also observed&backyd where kid&adults sit fai
May 12, 2021 · Penalty $5,000
Resolve - Class - 1
Const super failed to perform duties per code note:ato my insp of democonst site where super failed to perform.(1)failure maintain safe equipment,failure to notify dept of accident or damage,failure to safeguar
May 12, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard person&property affected by const ops note:ato myinsp of 1demo const site responding to complaint where adj property was damage.i observed@exp3&doorway into neighboring which was damaged&re
May 12, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to promptly notify dept of accident or damage to adj property note:ato my insp of demo const site@exp3&4,i observed damage to adj w/open&cmu brick face in doorway of emergency exit upon rev dept records
May 12, 2021 · Penalty $5,000
Resolve - Class - 1
Bc3309.9 weatherproof integreity of adj bldg note:ato my insp of demo const site.i observed no [email protected] rev area there are open to adj property where water can enter when rain or snow cause damage
May 12, 2021 · Penalty $625
Resolve
Complaints
- Appliance
Electric/gas range
Sep 28, 2026 · Apt 2A
Open - Unsanitary condition
Mold
Aug 31, 2026 · Apt 4A
Close - Plumbing
Water supply
Aug 31, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 17, 2026 · Apt 3G
Close - Plumbing
Water supply
Jul 17, 2026 · Apt 5D
Close - Unsanitary condition
Garbage/recycling storage
Jun 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 18, 2026 · Apt 3G
Close - General
Ventilation system
Jun 16, 2026 · Apt 5D
Close - Appliance
Refrigerator
Jun 16, 2026 · Apt 5D
Close
Show 33 more ↓
- Unsanitary condition
Mold
Jun 16, 2026 · Apt 5D
Close - Plumbing
Water supply
May 28, 2026 · Apt 3B
Close - General
Cabinet
May 28, 2026 · Apt 3B
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 3B
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 3B
Close - Door/window
Door
May 28, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Mar 4, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 18, 2026 · Apt 4G
Close - Appliance
Electric/gas range
Dec 9, 2025 · Apt 2A
Close - Appliance
Electric/gas range
Dec 1, 2025 · Apt 2A
Close - Plumbing
Bathtub/shower
Dec 1, 2025 · Apt 2A
Close - Appliance
Refrigerator
Nov 28, 2025 · Apt 4A
Close - General
Ventilation system
Nov 28, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Nov 28, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt BLDG
Close - Appliance
Refrigerator
Jan 18, 2024 · Apt 6D
Close - Paint/plaster
Wall
Jan 5, 2024 · Apt 4A
Close - Flooring/stairs
Floor
Jan 5, 2024 · Apt 4A
Close - Unsanitary condition
Pests
Jan 5, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 2, 2024 · Apt 2H
Close - Appliance
Electric/gas range
Dec 6, 2023 · Apt 6B
Close - Appliance
Refrigerator
Dec 6, 2023 · Apt 6B
Close - Plumbing
Basin/sink
Nov 23, 2023 · Apt 2E
Close - Heat/hot water
Entire building
Nov 23, 2023 · Apt 7C
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 4A
Close - Heat/hot water
Entire building
Nov 21, 2023 · Apt 7C
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 15, 2023 · Apt 2H
Close - Unsanitary condition
Pests
Nov 15, 2023 · Apt 2H
Close - Unsanitary condition
Pests
Nov 15, 2023 · Apt 2H
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Nov 4, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 7
- Residential units
- 60
- Building area
- 43,914 ft²
- Lot area
- 11,050 ft²
- Zoning
- C4-3A
- Community board
- 405
- Council district
- 34
- Block / lot
- 3560 / 45
- Assessed value
- $2,264,400
- Landmark / historic district
- No
HPD registration #434067, last renewed Aug 27, 2025.
Questions about 17-11 Hancock Street
Who owns 17-11 Hancock Street?
The owner of record in NYC Department of City Planning PLUTO data is Hancock St Residence LLC.
Does 17-11 Hancock Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 17-11 Hancock Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 33% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 17-11 Hancock Street built?
City records list 2022 as the year it was built.
How many apartments are in 17-11 Hancock Street?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.