1853 Madison Street
Queens, NY 11385BBL 4-03470-0052Map
Owner of record: 1853 Madison Rw LLC
1853 Madison Street is a walk-up apartment building built in 1913 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is 1853 Madison Rw LLC. HPD has recorded 239 housing violations here, most recently on September 20, 2026. 50 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.
- HPD violations
- 239
- DOB violations
- 4
- ECB violations
- 0
- HPD complaints
- 136
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 239
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st wall cabinet from west at north wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance lower sash 1st window from east at south wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective refrigerator rubber door gasket seal in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall, 1st door from west at north wall, ceiling, 2nd window frame from east at south wall, 1st door from west at north wall, ceiling in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st door frame from east at south wall, 1st door from east at south wall, 1st door frame from east at south wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the ceiling, ceiling, ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Sep 20, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, 1st door from south at west wall in the 3rd room from east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, east wall, south wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, 1st door from north at east wall, ceiling in the 3rd room from east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline at double basin wall hung kitchen sink in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st door from north at east wall, ceiling, baseboard at west wall, baseboard at west wall, 1st door frame from north at east wall, 1st door from north at east wall, ceiling in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, 1st door from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st base cabinet from west at north wall, 1st closet from east at south wall wall, 1st base cabinet from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 19, 2026 · Apt 2R
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Flooring/stairs
Floor
Sep 17, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 2R
Close - Electric
No lighting
Sep 17, 2026 · Apt 2R
Close - Plumbing
Basin/sink
Sep 17, 2026 · Apt 2R
Close - Door/window
Window frame
Sep 17, 2026 · Apt 2R
Close - Appliance
Refrigerator
Sep 17, 2026 · Apt 2R
Close - Safety
Smoke detector
Sep 17, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 2R
Close - General
Cabinet
Sep 17, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 2
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Aug 7, 2026 · Apt 2
Close - Unsanitary condition
Pests
Aug 7, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt 2
Close - General
Cabinet
Aug 7, 2026 · Apt 2
Close - Door/window
Window frame
Aug 7, 2026 · Apt 2
Close - Electric
Lighting
Aug 7, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jul 20, 2026 · Apt 2R
Close - Door/window
Window frame
Jul 20, 2026 · Apt 2R
Close - Paint/plaster
Wall
Jul 20, 2026 · Apt 2R
Close - Appliance
Refrigerator
Jul 20, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 13, 2026 · Apt 2R
Close - Plumbing
Bathtub/shower
Apr 13, 2026 · Apt 2R
Close - Safety
Smoke detector
Apr 13, 2026 · Apt 2R
Close - Safety
Carbon monoxide detector
Apr 13, 2026 · Apt 2R
Close - Paint/plaster
Wall
Apr 13, 2026 · Apt 2R
Close - Plumbing
Basin/sink
Apr 13, 2026 · Apt 2R
Close - Safety
Window guard broken/missing
Apr 13, 2026 · Apt 2R
Close - Door/window
Window frame
Apr 13, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Apr 13, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Nov 12, 2025 · Apt 3L
Close - Door/window
Window frame
Nov 12, 2025 · Apt 3L
Close - Safety
Fire escape
Mar 31, 2025 · Apt 3L
Close - Safety
Fire escape
Mar 31, 2025 · Apt 3L
Close - Safety
Fire escape
Mar 26, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 25, 2025 · Apt 3L
Close - Appliance
Electric/gas range
Mar 25, 2025 · Apt 3L
Close - Electric
Outlet/switch
Mar 25, 2025 · Apt 3L
Close - General
Bell/buzzer/intercom
Mar 25, 2025 · Apt 3L
Close - Plumbing
Basin/sink
Mar 25, 2025 · Apt 3L
Close - Electric
No lighting
Mar 25, 2025 · Apt 3L
Close - Water leak
Damp spot
Mar 25, 2025 · Apt 3L
Close - Paint/plaster
Wall
Mar 25, 2025 · Apt 3L
Close - Door/window
Window frame
Mar 25, 2025 · Apt 3L
Close - Plumbing
Bathtub/shower
Mar 25, 2025 · Apt 3L
Close - Unsanitary condition
Pests
Jan 9, 2025 · Apt 3L
Close - Water leak
Damp spot
Jan 9, 2025 · Apt 3L
Close - Appliance
Electric/gas range
Jan 9, 2025 · Apt 3L
Close - Plumbing
Basin/sink
Jan 9, 2025 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1913
- Floors
- 3
- Residential units
- 6
- Building area
- 5,600 ft²
- Lot area
- 2,742 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 34
- Block / lot
- 3470 / 52
- Assessed value
- $499,050
- Landmark / historic district
- Ridgewood South Historic District
HPD registration #406634, last renewed Nov 5, 2025.
Questions about 1853 Madison Street
Who owns 1853 Madison Street?
The owner of record in NYC Department of City Planning PLUTO data is 1853 Madison Rw LLC.
Does 1853 Madison Street have violations?
Yes. NYC HPD has recorded 239 housing violations at this property.
Is 1853 Madison Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1853 Madison Street built?
City records list 1913 as the year it was built.
How many apartments are in 1853 Madison Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.