roofy

1853 Madison Street

Queens, NY 11385BBL 4-03470-0052Map

Owner of record: 1853 Madison Rw LLC

1853 Madison Street is a walk-up apartment building built in 1913 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is 1853 Madison Rw LLC. HPD has recorded 239 housing violations here, most recently on September 20, 2026. 50 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.

HPD violations
239
DOB violations
4
ECB violations
0
HPD complaints
136

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2019
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 239

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st wall cabinet from west at north wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance lower sash 1st window from east at south wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective refrigerator rubber door gasket seal in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall, 1st door from west at north wall, ceiling, 2nd window frame from east at south wall, 1st door from west at north wall, ceiling in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st door frame from east at south wall, 1st door from east at south wall, 1st door frame from east at south wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the ceiling, ceiling, ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 20, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, 1st door from south at west wall in the 3rd room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, east wall, south wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, 1st door from north at east wall, ceiling in the 3rd room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at double basin wall hung kitchen sink in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st door from north at east wall, ceiling, baseboard at west wall, baseboard at west wall, 1st door frame from north at east wall, 1st door from north at east wall, ceiling in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, 1st door from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st base cabinet from west at north wall, 1st closet from east at south wall wall, 1st base cabinet from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Aug 19, 2026 · Apt 2R

    Open — Nov sent out

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active

ECB violations · 0

No ECB violations on record

Complaints

  • Flooring/stairs

    Floor

    Sep 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Sep 17, 2026 · Apt 2R

    Close
  • Electric

    No lighting

    Sep 17, 2026 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Sep 17, 2026 · Apt 2R

    Close
  • Door/window

    Window frame

    Sep 17, 2026 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Sep 17, 2026 · Apt 2R

    Close
  • Safety

    Smoke detector

    Sep 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Sep 17, 2026 · Apt 2R

    Close
  • General

    Cabinet

    Sep 17, 2026 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Aug 7, 2026 · Apt 2

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Aug 7, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 7, 2026 · Apt 2

    Close
  • General

    Cabinet

    Aug 7, 2026 · Apt 2

    Close
  • Door/window

    Window frame

    Aug 7, 2026 · Apt 2

    Close
  • Electric

    Lighting

    Aug 7, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jul 20, 2026 · Apt 2R

    Close
  • Door/window

    Window frame

    Jul 20, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jul 20, 2026 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Jul 20, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 20, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Apr 13, 2026 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Apr 13, 2026 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Apr 13, 2026 · Apt 2R

    Close
  • Safety

    Smoke detector

    Apr 13, 2026 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Apr 13, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 13, 2026 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Apr 13, 2026 · Apt 2R

    Close
  • Safety

    Window guard broken/missing

    Apr 13, 2026 · Apt 2R

    Close
  • Door/window

    Window frame

    Apr 13, 2026 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Apr 13, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Nov 12, 2025 · Apt 3L

    Close
  • Door/window

    Window frame

    Nov 12, 2025 · Apt 3L

    Close
  • Safety

    Fire escape

    Mar 31, 2025 · Apt 3L

    Close
  • Safety

    Fire escape

    Mar 31, 2025 · Apt 3L

    Close
  • Safety

    Fire escape

    Mar 26, 2025 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Mar 25, 2025 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Mar 25, 2025 · Apt 3L

    Close
  • Electric

    Outlet/switch

    Mar 25, 2025 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Mar 25, 2025 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Mar 25, 2025 · Apt 3L

    Close
  • Electric

    No lighting

    Mar 25, 2025 · Apt 3L

    Close
  • Water leak

    Damp spot

    Mar 25, 2025 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Mar 25, 2025 · Apt 3L

    Close
  • Door/window

    Window frame

    Mar 25, 2025 · Apt 3L

    Close
  • Plumbing

    Bathtub/shower

    Mar 25, 2025 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2025 · Apt 3L

    Close
  • Water leak

    Damp spot

    Jan 9, 2025 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Jan 9, 2025 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Jan 9, 2025 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1913
Floors
3
Residential units
6
Building area
5,600 ft²
Lot area
2,742 ft²
Zoning
R6B
Community board
405
Council district
34
Block / lot
3470 / 52
Assessed value
$499,050
Landmark / historic district
Ridgewood South Historic District

HPD registration #406634, last renewed Nov 5, 2025.

Questions about 1853 Madison Street

Who owns 1853 Madison Street?

The owner of record in NYC Department of City Planning PLUTO data is 1853 Madison Rw LLC.

Does 1853 Madison Street have violations?

Yes. NYC HPD has recorded 239 housing violations at this property.

Is 1853 Madison Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1853 Madison Street built?

City records list 1913 as the year it was built.

How many apartments are in 1853 Madison Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.