1723 Bleecker Street
Queens, NY 11385BBL 4-03436-0059Map
Owner of record: 17-23 Bleecker Street LLC
1723 Bleecker Street is a walk-up apartment building built in 1930 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is 17-23 Bleecker Street LLC. HPD has recorded 162 housing violations here, most recently on May 4, 2026. 22 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 162
- DOB violations
- 6
- ECB violations
- 0
- HPD complaints
- 216
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 162
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at vestibule area , 1st story
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Feb 27, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 27, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Feb 9, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Feb 9, 2026 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Feb 9, 2026 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at basement
Feb 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective spring at door to building front at basement
Feb 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Feb 9, 2026 · Apt 2R
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Properly repair or replace the broken or defective electric outlet at east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Nov 21, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 21, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 21, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Nov 21, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story
Nov 21, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of consisting of double cylinder key operator lock installed at door leading to fire escape window in the 1st room from north located at apt 2l, 2nd story, 1st apartment from south at west
Nov 21, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Nov 21, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 25, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 25, 2025 · Apt 2L
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 1st story
Jan 24, 2025
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective fire-retardant material at ceiling at public hall, 3rd story
Jan 24, 2025
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Jan 24, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box, 1st story
Apr 10, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ''latch'' at vestibule to public hall , 1st story
Apr 10, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly at vestibule door to public hall , 1st story
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective rain leader at east wall at inner court yard
Apr 3, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Apr 3, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on bulkhead door to roof
Dec 11, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Dec 11, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 3rd story
Dec 11, 2023
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
Refit the front entrance door to building
Aug 26, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing, vestibule, 1st story, public hall
Aug 26, 2021
Open — Not complied with - CImmediately hazardous
Code: arrange and make self-closing the doors the bulkhead door to roof
Aug 26, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 12, 2021 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 12, 2021 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 12, 2021 · Apt 2L
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Jul 12, 2021 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective located at apt 2l, 2nd story, 1st apartment from south at west
May 5, 2021 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2l, 2nd story, 1st apartment from south at west
May 5, 2021 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
May 5, 2021 · Apt 2L
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
May 5, 2021 · Apt 2L
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 3 square feet around windows at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 5, 2021 · Apt 2L
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the broken or defective mortise lock at building entrance door. , 1st story
Apr 26, 2021
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl-tiles floor at public hall, 1st story
Aug 20, 2020
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling,north wall and east wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jun 28, 2020 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 3 sq ft at west window,header in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jun 28, 2020 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1l, 1st story, 1st apartment from east at south
Jun 28, 2020 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Jun 28, 2020 · Apt 1L
Closed — Violation dismissed
DOB building violations · 6
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
May 3, 2026 · Apt 2L
Close - General
Cooking gas
Feb 10, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - General
Cooking gas
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 1R
Close - General
Cooking gas
Feb 7, 2026 · Apt 1R
Close - Appliance
Electric/gas range
Feb 7, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - General
Cooking gas
Feb 4, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Feb 3, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 20, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 23, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 22, 2025 · Apt 2L
Close - Water leak
Heavy flow
Nov 29, 2023 · Apt WHOLEB
Close - Plumbing
Toilet
Sep 19, 2023 · Apt 1R
Close - Heat/hot water
Entire building
Apr 8, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 23, 2023 · Apt 2L
Close - Heat/hot water
Entire building
Mar 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 25, 2022 · Apt 2L
Close - Heat/hot water
Apartment only
Dec 12, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Apr 23, 2021 · Apt 2L
Close - Flooring/stairs
Floor
Apr 7, 2021 · Apt 2L
Close - Flooring/stairs
Floor
Apr 7, 2021 · Apt 2L
Close - Unsanitary condition
Pests
Apr 7, 2021 · Apt 2L
Close - Electric
Power outage
Apr 7, 2021 · Apt 2L
Close - Unsanitary condition
Mold
Apr 7, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Feb 3, 2021 · Apt 2R
Close - Heat/hot water
Entire building
Jan 17, 2021 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jun 24, 2020 · Apt BLDG
Close - Water leak
Slow leak
Jun 24, 2020 · Apt 1L
Close - Unsanitary condition
Mold
Jun 24, 2020 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 34
- Block / lot
- 3436 / 59
- Assessed value
- $428,850
- Landmark / historic district
- No
HPD registration #402689, last renewed Feb 27, 2026.
Questions about 1723 Bleecker Street
Who owns 1723 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 17-23 Bleecker Street LLC.
Does 1723 Bleecker Street have violations?
Yes. NYC HPD has recorded 162 housing violations at this property.
Is 1723 Bleecker Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1723 Bleecker Street built?
City records list 1930 as the year it was built.
How many apartments are in 1723 Bleecker Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.