1720 Harman Street
Queens, NY 11385BBL 4-03433-0008Map
Owner of record: 1720 Herman Realty LLC
1720 Harman Street is a walk-up apartment building built in 1930 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is 1720 Herman Realty LLC. HPD has recorded 301 housing violations here, most recently on September 21, 2026. 15 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 301
- DOB violations
- 16
- ECB violations
- 21
- HPD complaints
- 555
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 301
- ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles around pipes next to sink base in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Sep 21, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from west at north
Sep 6, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Sep 6, 2026 · Apt 2L
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Sep 6, 2026 · Apt 2L
Open — Civ14 mailed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Sep 6, 2026 · Apt 2L
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from west at north
Sep 6, 2026 · Apt 2L
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective cracked and spalling concrete 1st tread from bottom at building front at stoop
Aug 19, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at basement door north wall at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story
Aug 11, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Aug 11, 2026
Open — Nov certified on time
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch assembly vestibule door to public hall , 1st story
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 24, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 24, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges building entrance to public hall , 1st story
Feb 24, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulking east wall bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed bx cable west wall in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective porcelain floor tiles in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective subfloor beneath vinyl floor tiles in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Feb 24, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door to cellar at public hall, 1st story
Dec 29, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door to cellar at public hall, 1st story
Dec 25, 2025
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of sloping floor in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Dec 13, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door to cellar at public hall, 1st story
Dec 13, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Dec 13, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective enamel reglaze at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Dec 13, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Oct 25, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Oct 25, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall and floor in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Oct 5, 2025 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Oct 5, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Oct 5, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from east located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2025 · Apt 1R
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door intact at public hall, 1st story
Jul 27, 2025
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jun 17, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling. in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Apr 1, 2025 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub. in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Apr 1, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall. in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Apr 1, 2025 · Apt 1R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from east at south
Oct 6, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from east at south
Oct 6, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from east at south
Oct 2, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Oct 2, 2024 · Apt 1R
Open — Invalid certification - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Oct 2, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective building entrance door lock and assembly at public hall, 1st story
Oct 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at front areaway, 1st story
Oct 2, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
Oct 7, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Oct 7, 2023
Closed — Violation dismissed
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner issued 15 day letter of intent to revoke permit # 420951303. the applicant lost filing priveleges
May 18, 2018
Dob violation - active - Construction other optional
Borough commissioner issued 15 day letter of intent to revoke permit # 440460868. the applicant lost filing priveleges
May 18, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 25, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 24, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 10, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed
ECB violations · 21
- Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, unit 1r, kitchen and bathroom floor areas are caving in., repair and/replace
Dec 15, 2025 · Penalty $2,500
Resolve - Class - 1
Work w/o permit. cellar:observed electrical work consisting of main electrical service box,7 electrical meters,4 breaker panel boxes labeled3l,3r,2r,and 1r,and electrical wires to accommodate building. also obs
Feb 20, 2020
Resolve - Class - 1
Gas being supplied to bldg w/o inspection and certification by dob.at time of my inspecion,observed in the cellar,gas being supplied to the bldg w/o inspeciton and certification by dob after and illegal gas by
Jun 15, 2017 · Penalty $500
Active - Class - 1
Failure to maintain bldg in code-compliant manner.at time of my inspecion i observed in the cellar an illegal gas by pass,by using the gas from the gas meter 2r to supply gas to 2l.utility com.locked gas servic
Jun 15, 2017 · Penalty $500
Active - Class - 1
Work w/o permit.at time of inspection i observed in the cellar new gas piping installed creating an illegal by pass of gas w/o permit.utility com.locked gas service valve to bldg.photos taken.rem:obtain permit
Jun 15, 2017 · Penalty $800
Resolve - Class - 1
Failure to have new or altered plumbing system tested.at time of my inspection i observed inthe cellr new gas piping installed creating an illegal bypass of gas that piping has not been tested.utility co.locked
Jun 15, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to post permit for work at premises. no permit posted. remedy:post permit.
Aug 20, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to provide approved/accpeted plans @ job site.noted:alterationwork in progress @ cellar,apt 1l(1st fl)& metal(furrow)ceiling @ 3rd fl(apt #3r)under job #420951303-alt2.no approved plans @ side.job appro
May 12, 2015 · Penalty $2,500
Resolve - Class - 2
Work w/o a permit-expired permit:alteration work in progress @ cellar,1st fl & 3rd fl(apt 3r)under job #420951303-alt2.the permit expired on 04/26/15 in const work.work approx 70% complete.fuel swo issued pursu
May 12, 2015 · Penalty $4,000
Resolve - Class - 1
Gas being suppled to bldg w/ insp or cert by dob.observed on 03/03/15 @ 6:31pm-boiler & hot water heater in full operation-w/ out gas authorization-cert by dob.application #420951303-rem:file for necessary perm
Mar 3, 2015 · Penalty $5,000
Active
Show 11 more ↓
- Class - 1
Sec. 28-212.11 removal of posted order of the commissioner. noted at front at front entry door stop work order was ripped & removed posted 5/16/14 at front entry door. remedy: comply w/comm's order.
Nov 24, 2014 · Penalty $8,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. re: installation ofplumbing material: in celalr per flexible tubing is used to connect hot and cold water lines from gas hot water heater for house.rmdy: rem
Nov 15, 2014 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner re:installation/maintenance of plumbing system materials/equipment per pc102.3;27-902.at time of insp i observed fuel exhaust piping for gas hot water in cellar
Jun 19, 2014 · Penalty $250
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner:no fire stopping per bc712.3;27-345.noted:observed @ time of insp large areas of the fire stopping @ cellar ceiling was missing exposing the wood joist & creati
Jun 19, 2014 · Penalty $1,000
Resolve - Class - 2
Work w/o a permit.noted:@ time of insp there was underpinning on goingin the bsmt.pursuant to section(28-207.2)of the admin code of the cityof ny you are here by ordered to immediately stop work @ the above pre
Jun 4, 2014 · Penalty $800
Resolve - Class - 1
Failure to maintain noted @ cellar area excavated approx 2.5 & now exposed.water drainage pipe is cracked & leaking of which is causing water to pool on to undermined soil also @ first fl noticable sagging in f
Jun 3, 2014 · Penalty $5,000
Active - Class - 2
Failure to maintain adequate housekeeping.note:alteration# 420951303,@8:15am work in progress w/ large accumulation of dust & grit on walls & floors of public halls floors not swept,with condition poor & no hou
May 2, 2014 · Penalty $800
Resolve - Class - 1
Work does not conform to approved const doc/approved amend.noted:job #420951303 alt 2,directive 14 w/plans on site dated 3/4/14 for renovation work.excavation in progress @ cellar w/completed removal of soil ap
Apr 16, 2014 · Penalty $500
Resolve - Class - 2
Failure to provide approval accepted plans @ jobsite @ time of insp.as per job#440113707-01-al.rem:provide approved plans.
Mar 10, 2014 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit. work noted: no electrical permit issued for this renovation. at 1st flr apt #1l & 2nd flr, apt 2l. remove all electrical wiring, receptacles, (cable) fixtures, switches, w/o a permit, 100%
Mar 10, 2014 · Penalty $800
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperationss. as per job #4401113707-01-al. noted: at 2nd flr level apt#2l. front door to apt 2l was left unlocked & open allowing an unsafe
Mar 10, 2014 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Sep 3, 2026 · Apt 2L
Close - General
Janitor/super
Aug 10, 2026 · Apt 1R
Close - Safety
Sprinkler
Aug 10, 2026 · Apt 1R
Close - Water leak
Heavy flow
Aug 5, 2026 · Apt 2L
Close - Paint/plaster
Wall
Jun 13, 2026 · Apt 2L
Close - Paint/plaster
Ceiling
Jun 13, 2026 · Apt 2L
Close - Appliance
Electric/gas range
Jun 13, 2026 · Apt 2L
Close - Safety
Smoke detector
Jun 13, 2026 · Apt 2L
Close - Door/window
Window frame
Jun 13, 2026 · Apt 2L
Close - Water leak
Damp spot
Jun 13, 2026 · Apt 2L
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 4, 2026 · Apt 1R
Close - Plumbing
Bathtub/shower
Feb 4, 2026 · Apt 1R
Close - Water leak
Slow leak
Feb 4, 2026 · Apt 1R
Close - Plumbing
Bathtub/shower
Feb 4, 2026 · Apt 1R
Close - Flooring/stairs
Floor
Feb 4, 2026 · Apt 1R
Close - Flooring/stairs
Floor
Feb 4, 2026 · Apt 1R
Close - Plumbing
Bathtub/shower
Feb 2, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 23, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 3L
Close - Flooring/stairs
Floor
Dec 2, 2025 · Apt 1R
Close - Door/window
Door
Oct 24, 2025 · Apt BUILDI
Close - Heat/hot water
Apartment only
Oct 24, 2025 · Apt 3L
Close - Door/window
Door
Oct 2, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Oct 2, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Oct 2, 2025 · Apt 1R
Close - Door/window
Door
Oct 2, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Jul 10, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Jun 26, 2025 · Apt 1R
Close - Water leak
Slow leak
May 31, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
May 20, 2025 · Apt 1R
Close - Water leak
Damp spot
May 20, 2025 · Apt 1R
Close - Paint/plaster
Ceiling
May 20, 2025 · Apt 1R
Close - Water leak
Damp spot
May 20, 2025 · Apt 1R
Close - Unsanitary condition
Mold
May 20, 2025 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Mar 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 4, 2025 · Apt 3L
Close - Water leak
Slow leak
Jan 30, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Jan 30, 2025 · Apt 1R
Close - Paint/plaster
Wall
Jan 30, 2025 · Apt 1R
Close - Water leak
Slow leak
Oct 3, 2024 · Apt 2L
Close - Water leak
Damp spot
Oct 3, 2024 · Apt 2L
Close - Plumbing
Bathtub/shower
Sep 16, 2024 · Apt 1R
Close - Plumbing
Bathtub/shower
Aug 13, 2024 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 34
- Block / lot
- 3433 / 8
- Assessed value
- $458,100
- Landmark / historic district
- No
HPD registration #403589, last renewed Aug 8, 2025.
Questions about 1720 Harman Street
Who owns 1720 Harman Street?
The owner of record in NYC Department of City Planning PLUTO data is 1720 Herman Realty LLC.
Does 1720 Harman Street have violations?
Yes. NYC HPD has recorded 301 housing violations at this property.
Is 1720 Harman Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 50% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1720 Harman Street built?
City records list 1930 as the year it was built.
How many apartments are in 1720 Harman Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.