roofy

1713 Harman Street

Queens, NY 11385BBL 4-03432-0068Map

Owner of record: Kamm NYC LLC

1713 Harman Street is a walk-up apartment building built in 1930 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is Kamm NYC LLC. HPD has recorded 70 housing violations here, most recently on December 17, 2024. 2 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
70
DOB violations
5
ECB violations
0
HPD complaints
2,264

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 17, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 70

  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 17, 2024 · Apt 3R

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of air condition unit and ladder at public hall, 3rd story

    Dec 5, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than10 sq.ft mold at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 30, 2024 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 30, 2024 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 30, 2024 · Apt 2L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from east at south

    Nov 30, 2024 · Apt 2L

    Closed — Violation dismissed
  • A

    Replace with standard wire glass the present glass at skylight at public hall, 3rd story

    Oct 29, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door to cellar at public hall, 1st story

    Mar 26, 2024

    Closed — Violation closed
  • B

    Replace with new the missing approved wire screens above and below skylight at stair bulkhead to roof , 3rd story

    Mar 24, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color loose plaster at ceiling approximately 2 square feet in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north

    Mar 11, 2023 · Apt 3R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation raiser in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Mar 11, 2023 · Apt 3R

    Closed — Violation closed
  • C

    Properly repair the broken or defective lock at the building front entrance door at public hall, 1st story

    Feb 28, 2023

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of lockable key operated lock from the bulkhead door to roof , 3rd story

    Feb 27, 2023

    Closed — Violation closed
  • C

    Properly repair the broken or defective lock at building front entrance door at public hall, 1st story

    Feb 24, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at stair bulkhead at public hall, 3rd story

    Feb 12, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of hook and eye installed at vestibule door to 1st story public hall at public hall, 1st story

    Oct 29, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at vestubule at public hall, 1st story

    Oct 29, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Oct 24, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Oct 24, 2021 · Apt 2L

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north

    Jan 9, 2020 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at 1st story public hall leading to boiler room at cellar

    Feb 7, 2019

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door at fire egress door in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors at fire egress door in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing within 15 feet of all sleeping areas located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing within 15 feet of all sleeping areas located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, 1st apartment from west at north

    Feb 7, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, apartment at south

    Nov 19, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, apartment at south

    Nov 19, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3r, 3rd story, 1st apartment from north at east

    Jan 28, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 3r, 3rd story, 1st apartment from north at east

    Jan 28, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    Jan 28, 2018 · Apt 3R

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperture of 130 degrees at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Jan 28, 2018 · Apt 3R

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 3r, 3rd story, 1st apartment from north at east

    Jan 28, 2018 · Apt 3R

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Jan 30, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 30, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 19, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Mar 6, 2015

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Nov 20, 2014

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Nov 20, 2014

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Nov 20, 2014

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice located at apt 2r, 2nd story

    Nov 16, 2014 · Apt 2R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 2; located at apt 2r, 2nd story

    Nov 16, 2014 · Apt 2R

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder lock at door in the entrance located at apt 2r, 2nd story

    Sep 15, 2014 · Apt 2R

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors - in the entrance located at apt 2r, 2nd story

    Sep 15, 2014 · Apt 2R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story

    Sep 15, 2014 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Jul 30, 2014 · Apt 2R

    Closed — Violation closed

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1930
Floors
3
Residential units
6
Building area
4,875 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
405
Council district
34
Block / lot
3432 / 68
Assessed value
$458,100
Landmark / historic district
No

HPD registration #409948, last renewed Nov 17, 2025.

Questions about 1713 Harman Street

Who owns 1713 Harman Street?

The owner of record in NYC Department of City Planning PLUTO data is Kamm NYC LLC.

Does 1713 Harman Street have violations?

Yes. NYC HPD has recorded 70 housing violations at this property.

Is 1713 Harman Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1713 Harman Street built?

City records list 1930 as the year it was built.

How many apartments are in 1713 Harman Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.