118-18 Union Turnpike
Queens, NY 11415BBL 4-03335-0023Map
Owner of record: Park Lane South Owners Assoc
118-18 Union Turnpike is an elevator apartment building built in 1974 in Queens, 11415. It has 213 residential units across 20 floors. The owner of record is Park Lane South Owners Assoc. HPD has recorded 37 housing violations here, most recently on May 9, 2019. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 37
- DOB violations
- 19
- ECB violations
- 19
- HPD complaints
- 59
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 9, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 19l, 18th story, 1st apartment from north at east
May 9, 2019 · Apt 19L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 19l, 18th story, 1st apartment from north at east
Apr 11, 2019 · Apt 19L
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 19l, 18th story, 1st apartment from north at east
Apr 11, 2019 · Apt 19L
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective metal handle at base cabinet door in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Sep 24, 2015 · Apt 6H
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective interior of wood base cabinet at sink in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Sep 24, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose kitchen countertops at north and south walls in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Sep 24, 2015 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective drainage stopper at wash basin in the bathroom located at apt 6h, 6th story, 2nd apartment from south at west
Sep 24, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets wash basin north bathroom. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed
Show 27 more ↓
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the private hallway located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the north bathroom. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the dining room and south living-room located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the private hall. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the south bathroom. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls in the kitchen. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose sink counter top. in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose cabinet counter top north wall. in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the dining-room and south living-room located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling north bathroom. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the south bathroom. located at apt 6h, 6th story, 2nd apartment from south at west
Jul 30, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose south counter top in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose north counter top in the kitchen located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile and wood floor throughout in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets wash basin in the bathroom located at apt 6h, 6th story, 2nd apartment from south at west
Jun 16, 2015 · Apt 6H
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from north at east located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & west wall in the 1st bathroom from east located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st bathroom from east located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the 1st bathroom from east located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed - BHazardous
Properly secure the loose counter top at base cabinet, east wall in the kitchen located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls, ceiling & trim in the entire apartment located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & east wall in the 4th room from north at east located at apt 6h, 6th story, 2nd apartment from west at north
Mar 31, 2015 · Apt 6H
Closed — Violation dismissed
DOB building violations · 19
- Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 21, 2022
Dob violation - dismissed - Failure to correct swarmp conditions (facade) facade required
Cycle 9a failure to correct swarmp conditions
Feb 21, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2019
Dob violation - resolved - Construction other optional
Emergency work. owner to proceed with immed' emergency stabilization as indicated in drawings prepared by mueser rutledge consulting eng'r & lirr. the emergency work will include stabilization & demo of the existing wall as depicted in the mueser rutlege drawing. owner will file all permits by 2/23/18 and obtain all permits by 3/16/18
Feb 18, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2016
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2007
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2006
Dob violation - resolved - Elevator elevatorrequired
4p5070
Jun 21, 1999
Dob violation - resolved - Elevator elevatorrequired
4p5071
Jun 21, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Oct 18, 1990
Dob violation - dismissed - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Oct 18, 1990
Dob violation - dismissed - Elevator elevatorrequired
(16)repair fraim & post copy of certificate in same.(18)properly mark 2nd floor button.(37)2nd floor call drops out on 20th floor & car return to 1st floor, have car answer 21 car call when pushed in at all times.(51)provide in cab capacity plate 2500lbs.(52)clean car top
Mar 7, 1989
Dob violation - resolved - Elevator elevatorrequired
(16)repair fraim & post copy of certificate in same.(18)properly mark 21 floor.(51)provide in cab capacity plate 2500lbs.(52)repair car top & bottom lights.(53)clean car top
Mar 7, 1989
Dob violation - resolved
ECB violations · 19
- Class - 1
Failure to maintain parking structure. at time of inspection observed loose slab concrete at level one below parking spot 107. also at parking spot 93 and exposed rebar. remedy: comply with code.
Sep 8, 2025 · Penalty $12,500
Active - Class - 2
Pedestrian protection does not meet code specifications.at time of inspection of active 20 story construction jobsite observed sidewalk shed installed at all 4 exposures with sws bracing installed at 7 ft high
May 2, 2022 · Penalty $5,000
Resolve - Class - 2
42n10. 42w10- bypassed on controller.
Nov 1, 2010
Resolve - Class - 2
02x10,01b10. 01b10- alarm on stop sw not working.
Nov 1, 2010
Resolve - Class - 2
80b14
Apr 22, 2010 · Penalty $500
Resolve - Class - 2
42n11
Apr 22, 2010 · Penalty $500
Resolve - Class - 2
57e10.57e10 repair noisy hoist motor
Jun 10, 2009
Resolve - Non-hazardous
51h11.38x10.38o02.28q03.25d06.40t07.17h11.10e10.83e10 38x10 car top inspection station not working repair 83e10 elevator rubbing through at the shaftwy repair
May 16, 2008
Resolve - Non-hazardous
38x10.38i11.17h11.10h11.40t07.83b210. 38x10 car top inspection stationnot working repair 38t11 car top light damaged replace 38o02 dirty cartop 83b10 elevator get stuck on the top fl check hoistway door locks
May 16, 2008
Resolve - Non-hazardous
50y,30o.
Dec 28, 1998
Resolve
Show 9 more ↓
- Non-hazardous
57o,35o,40o,37o,
Feb 10, 1998
Resolve - Non-hazardous
57o,40o,37o,
Feb 10, 1998
Resolve - Non-hazardous
46b.
Apr 21, 1994 · Penalty $100
Resolve - Non-hazardous
25r.
Apr 21, 1994
Resolve - Non-hazardous
15m,01l,02l,73#,03o,74m,22d,10t, (15) dust covers (1&2) repair bell sound to under car alarm bell & bsmt outside shaftway bell (73)conduct& properly tag governor after conducting 5yr safety test, file elv-3.
Apr 3, 1992
Resolve - Non-hazardous
73#,10t,22d,01l,02l,15m,03o, (73) conduct & properly tag governor after conducting 5yr safety test, file elv-3 form (10) mark 21 fl button (o1 & o2) repair bell sound to under car bell & outside shaftwa
Apr 3, 1992
Resolve - Non-hazardous
4p provide keys for side emergency door
Mar 12, 1991 · Penalty $185
Resolve - Non-hazardous
4#7,73#5,14m7,74m7. (4) provide keys for side emergency doors. (73) conduct a 5 year test. (74) provides capacity plate in car.
Oct 24, 1990 · Penalty $75
Resolve - Non-hazardous
4#7,10112,14m7,73#5,74m7. (4) provide keys for side emergency door. (10) 3rd floor. (73) conduct a 5 year test. (74) provide capacity plate.in car.
Oct 24, 1990 · Penalty $75
Resolve
Complaints
- Water leak
Damp spot
Mar 14, 2024 · Apt 6B
Close - Water leak
Slow leak
May 6, 2019 · Apt 19L
Close - Water leak
Slow leak
Apr 8, 2019 · Apt 19L
Close - Heat/hot water
Entire building
Feb 10, 2016 · Apt 14F
Close - Heat/hot water
Entire building
Jan 5, 2016 · Apt 21A
Close - Plumbing
Basin/sink
Sep 22, 2015 · Apt 6H
Close - General
Cabinet
Sep 22, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Jul 27, 2015 · Apt 6H
Close - Plumbing
Basin/sink
Jul 27, 2015 · Apt 6H
Close - General
Cabinet
Jul 27, 2015 · Apt 6H
Close
Show 40 more ↓
- Paint/plaster
Wall
Jul 27, 2015 · Apt 6H
Close - Paint/plaster
Wall
Jul 27, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
Jul 27, 2015 · Apt 6H
Close - Plumbing
Basin/sink
Jul 27, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Jul 27, 2015 · Apt 6H
Close - Paint/plaster
Wall
Jun 9, 2015 · Apt 6H
Close - General
Cabinet
Jun 9, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
Jun 9, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Jun 9, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Jun 9, 2015 · Apt 6H
Close - Plumbing
Basin/sink
Jun 9, 2015 · Apt 6H
Close - Water leak
Damp spot
Jun 9, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
Jun 9, 2015 · Apt 6H
Close - Paint/plaster
Wall
Jun 9, 2015 · Apt 6H
Close - Plumbing
Basin/sink
Jun 9, 2015 · Apt 6H
Close - Paint/plaster
Wall
May 21, 2015 · Apt 6H
Close - Paint/plaster
Wall
May 21, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
May 21, 2015 · Apt 6H
Close - Water leak
Damp spot
May 21, 2015 · Apt 6H
Close - Plumbing
Basin/sink
May 21, 2015 · Apt 6H
Close - Flooring/stairs
Floor
May 21, 2015 · Apt 6H
Close - Flooring/stairs
Floor
May 21, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
May 21, 2015 · Apt 6H
Close - General
Cabinet
May 21, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
May 21, 2015 · Apt 6H
Close - Plumbing
Basin/sink
May 21, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Mar 23, 2015 · Apt 6H
Close - Plumbing
Basin/sink
Mar 23, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
Mar 23, 2015 · Apt 6H
Close - General
Cabinet
Mar 23, 2015 · Apt 6H
Close - Paint/plaster
Wall
Mar 23, 2015 · Apt 6H
Close - Paint/plaster
Wall
Mar 23, 2015 · Apt 6H
Close - Paint/plaster
Wall
Mar 23, 2015 · Apt 6H
Close - Paint/plaster
Ceiling
Mar 23, 2015 · Apt 6H
Close - Flooring/stairs
Floor
Mar 23, 2015 · Apt 6H
Close - Appliance
Electric/gas range
Oct 17, 2008 · Apt 6H
Close - General
Floor
Oct 17, 2008 · Apt 6H
Close - General
Mold
Aug 24, 2006 · Apt 14L
Close - General
Floor
Aug 24, 2006 · Apt 14L
Close - Plumbing
Water-leaks
Aug 24, 2006 · Apt 14L
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 24, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jul 21, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jun 26, 2026 | $305,000 | Coops - elevator apartments | — |
| Jun 3, 2026 | Non-market transfer | Coops - elevator apartments | — |
| May 18, 2026 | $290,000 | Coops - elevator apartments | — |
| May 1, 2026 | $311,800 | Coops - elevator apartments | — |
| Apr 29, 2026 | $245,000 | Coops - elevator apartments | — |
| Mar 6, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Mar 6, 2026 | $243,000 | Coops - elevator apartments | — |
| Feb 9, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Dec 4, 2025 | $420,000 | Coops - elevator apartments | — |
| Nov 20, 2025 | $465,000 | Coops - elevator apartments | — |
| Nov 7, 2025 | $420,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1974
- Floors
- 20
- Residential units
- 213
- Building area
- 196,420 ft²
- Lot area
- 62,526 ft²
- Zoning
- R3-2
- Community board
- 409
- Council district
- 29
- Block / lot
- 3335 / 23
- Assessed value
- $9,022,050
- Landmark / historic district
- No
HPD registration #421287, last renewed Jul 24, 2025.
Questions about 118-18 Union Turnpike
Who owns 118-18 Union Turnpike?
The owner of record in NYC Department of City Planning PLUTO data is Park Lane South Owners Assoc.
Does 118-18 Union Turnpike have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 118-18 Union Turnpike rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 0% of its 213 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 118-18 Union Turnpike built?
City records list 1974 as the year it was built.
How many apartments are in 118-18 Union Turnpike?
It has 213 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.