58-30 Fresh Pond Road
Queens, NY 11378BBL 4-02739-0048Map
Owner of record: 58-30 Fresh Pond Road LLC
58-30 Fresh Pond Road is a walk-up apartment building built in 1929 in Queens, 11378. It has 6 residential units across 3 floors. The owner of record is 58-30 Fresh Pond Road LLC. HPD has recorded 42 housing violations here, most recently on September 18, 2025. 25 of the 42 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 42
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 9
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 42
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations incorrectly installed in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Sep 18, 2025 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 18, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 18, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Sep 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 7; in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Sep 18, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules incorrectly installed in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Sep 18, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots and personal items at 2nd and 3rd story balconies at north (side) stack at fire escape
Jul 2, 2024
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Oct 10, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Oct 10, 2023 · Apt 1F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed
Show 32 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from east at south located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets ,at bath tub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). ,missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector ,missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 2nd closet from east at south wall door frame, 2nd closet from east at south wall door in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall, south wall, 1st closet from north at east wall door frame, 1st closet from north at east wall door, 1st window frame from south at west wall in the 4th room from east at south located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from east at north, the 1st room from east, the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, north wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Dec 11, 2019 · Apt 2R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counterbalance lower window sash in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair the broken or defective counterbalance lower window sash in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper window sash in the 1st room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceralic tile at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 6 sq.ft in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Dec 5, 2017 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell/buzzer for apt 3r fl=3 at vestibule bldg , 1st story
Dec 5, 2017
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective locking device at door from vestibule to public hall , 1st story
Dec 5, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 5, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 5, 2017
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Dec 5, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 5, 2017
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 1
Bc3314.9 supported scaffold does not meet code specification noted scaffold erected under permit #420287816 at esp#1 1st frame at entrance to bldg is leaning scaffold at a height of apprx 36ft at exp4 scaffold
Mar 10, 2011 · Penalty $1,600
Resolve
Complaints
- Safety
Window guard broken/missing
Jul 1, 2024 · Apt 1R
Close - Safety
Carbon monoxide detector
Jul 1, 2024 · Apt 1R
Close - Water leak
Heavy flow
Dec 10, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 10, 2019 · Apt 2R
Close - Water leak
Slow leak
Dec 1, 2017 · Apt 3R
Close - Door/window
Window frame
Dec 1, 2017 · Apt 3R
Close - Water leak
Heavy flow
Dec 1, 2017 · Apt 3R
Close - Door/window
Window frame
Dec 1, 2017 · Apt 3R
Close - Unsanitary condition
Sewage
Dec 1, 2017 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1929
- Floors
- 3
- Residential units
- 6
- Building area
- 5,400 ft²
- Lot area
- 3,300 ft²
- Zoning
- R4-1
- Community board
- 405
- Council district
- 30
- Block / lot
- 2739 / 48
- Assessed value
- $466,200
- Landmark / historic district
- No
HPD registration #408357, last renewed Sep 10, 2025.
Questions about 58-30 Fresh Pond Road
Who owns 58-30 Fresh Pond Road?
The owner of record in NYC Department of City Planning PLUTO data is 58-30 Fresh Pond Road LLC.
Does 58-30 Fresh Pond Road have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 58-30 Fresh Pond Road rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 67% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 58-30 Fresh Pond Road built?
City records list 1929 as the year it was built.
How many apartments are in 58-30 Fresh Pond Road?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.