roofy

98-09 65 Road

Queens, NY 11374BBL 4-02103-0001Map

Owner of record: Queens Portfolio V, LLC

98-09 65 Road is an elevator apartment building built in 1938 in Queens, 11374. It has 238 residential units across 6 floors. The owner of record is Queens Portfolio V, LLC. HPD has recorded 171 housing violations here, most recently on September 15, 2026. 23 of the 50 most recent violations are still open. City tax records listed 231 rent-stabilized apartments here in 2024.

HPD violations
171
DOB violations
125
ECB violations
34
HPD complaints
519

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
231
About 97% of the building's 238 apartments
Up from 228 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 171

  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at ceiling and north wall in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north

    Sep 15, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less that 10sq ft observed at ceiling and east wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north

    Sep 15, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north

    Sep 15, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south

    Aug 26, 2026 · Apt 2E

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 1st bathroom from north located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall in the 2nd bathroom from north located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the kitchen located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door frame, 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Replace with new the missing escutcheon plate at riser at north wall in the 2nd bathroom from north located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the 2nd bathroom from north located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the 2nd bathroom from north located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
  • A

    Replace with new the missing door striker at room entrance frame in the 4th room from north at west located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at washbasin in the 2nd bathroom from north located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from north at west located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the 1st room from north at west located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door frame in the private hallway located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the 2nd room from north at east located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at west located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door in the foyer located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st door frame from east at south wall in the 2nd bathroom from north located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd bathroom from north located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south

    Jul 21, 2026 · Apt 4E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st door from east at south wall, 1st door frame from east at south wall in the 1st room from north at west located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall, 1st door from north at east wall in the 1st bathroom from north located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st radiator from north at east wall, 1st radiator from north at east wall in the 2nd room from north at east located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door in the private hallway located at apt 1e, 1st story, 1st apartment from east at south

    Jul 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story

    Jul 2, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at laundry room door at basement story at public hall

    Apr 1, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at laundry room at basement

    Mar 11, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice at laundry room

    Mar 11, 2026

    Open — False certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 6th story

    Jan 21, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Dec 22, 2025 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Dec 22, 2025 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement story at boiler room

    Dec 7, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 2nd story, 2nd apartment from east at south

    Dec 7, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south

    Dec 7, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south

    Dec 7, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south

    Dec 7, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at burrows at east yard and building front

    Nov 21, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north

    Nov 17, 2025 · Apt 5C

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 17, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lock and latch set at vestibule door at public hall, 1st story

    Nov 9, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges and latch at compactor closet door at public hall, 5th story

    Nov 9, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at compactor closet door at public hall, 5th story

    Nov 9, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective lock and latch set at vestibule door at public hall, 1st story

    Nov 9, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story

    Nov 9, 2025

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the basement

    Sep 10, 2025

    Closed — Violation dismissed

DOB building violations · 125

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 5, 2025

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 5, 2025

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 21, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 19, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 23, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2015

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2011

    Dob violation - resolved

ECB violations · 34

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0004323 by the august 1, 2024 deadline. to date, the department

    Oct 1, 2024 · Penalty $1,250

    Active
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0000696 by the august 1, 2024 deadline. to date, the department

    Oct 1, 2024

    Resolve
  • Class - 1

    Upon inspection device was found out of service. this is the only elevator in the building. restore to service immediately and contact nycdob at [email protected] for a complete inspection.

    Aug 4, 2022

    Resolve
  • Class - 2

    1. amend application . 2. install rope gripper . 3. provide fire recall alarm sensor in machine room .

    Apr 18, 2022

    Resolve
  • Class - 1

    Rope gripper not installed-install,load weigher not installed-install

    Mar 7, 2022

    Resolve
  • Class - 1

    Rope gripper not installed-install,load weigher not installed-install

    Mar 7, 2022

    Resolve
  • Class - 1

    Rope gripper not installed-install,load wieghing device not installed-install

    Mar 4, 2022

    Resolve
  • Class - 2

    Failure to maintain building in a code compliant manner. noted: multiple public hall windows upper sash screwed shut unable to provide proper ventilation., repair and/or replace

    Apr 15, 2021

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 9, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm, and perf

    Jul 28, 2020 · Penalty $1,280

    Resolve
Show 24 more ↓
  • Class - 1

    42m7 no door lock monitoring installed in this controlled as mandated by 3.10.12 of appendix k3 of the 2014 nycbc this is a controller feature which ensures passenger safety file application install plm & perfo

    Mar 6, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    59t5)brake tag unlabeled, perform & file test

    Nov 2, 2018

    Resolve
  • Class - 2

    64m07,08v01. 64m07-inside car missing device #; 08v01-on some floors (du direction 1st floor) stop level is not satisfactory.

    Mar 27, 2017

    Resolve
  • Class - 2

    59u5 - perform and file annual brake test.

    Feb 25, 2016

    Resolve
  • Class - 2

    61d11 - replace mainline disconnect.

    Mar 7, 2015

    Resolve
  • Class - 1

    Failure to maintain building wall(s) or appurtenancesnoted exterior s tairs of bldg & brick/block wall (adjacent to job site are defective noted missing concrete adjacent to concrete steps/treads vertical crack

    Mar 12, 2010 · Penalty $250

    Resolve
  • Class - 2

    Work w/o permit. work noted: erected 8'high plywood construction fenceon 65 rd, in front of existing park garage structure, in between 98-25& 98-15 65 rd. w/o permit, no dob record for construction fence. work

    Feb 25, 2010

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations. noted: demolition work in progress remove garage roof & scab at exposing 1 installed a construction fence. with 12 feet opening

    May 29, 2009

    Resolve
  • Class - 2

    Work w/o a permit noted job 420014040 remove existing garage roof insealed const fence approx 80-0l 8-0h w/o permit for fence remedy: obtain fence permit

    May 22, 2009 · Penalty $400

    Resolve
  • Hazardous

    Sec. 26-03(d)(2). 1rcny. roof of sidewalk shed not cleaned daily. observed debris on sidewalk shed roof from day before.

    Apr 9, 2008 · Penalty $800

    Resolve
  • Hazardous

    Operation of a crane,derrick or hoisting equipment in an unsafe manner.contractor had scaffolds hanging w/ damaged wire rope and missing hardware. failure to safely and properly remove material/debris from

    Jul 3, 2007 · Penalty $4,500

    Resolve
  • Non-hazardous

    No check valve backflow preventer on boiler feed line covers missing on controls

    Aug 15, 2001

    Resolve
  • Non-hazardous

    18i, 18- basement door lock missing cover.

    Apr 19, 1997

    Resolve
  • Non-hazardous

    18h,54g,. 18- interlock rolers worn 54- replace main line fuse with proper fuse.

    Apr 18, 1997

    Resolve
  • Non-hazardous

    40l,28h,50y,03o. 03 clean oil on top of car.

    Dec 16, 1993

    Resolve
  • Non-hazardous

    50l 37l 35r 50 eliminate excessive noise 37 door close relay noisy 35 provide a proper cover for smoke hole in motor room floor

    Jul 30, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    08v,11q,15l,22d. 15 bsmt door check.

    Nov 7, 1992

    Resolve
  • Non-hazardous

    18l, 18. 4th floor.

    Jun 26, 1992

    Resolve
  • Non-hazardous

    03l;35l;53l;21l; 03.repair,car top lighting. 35.replace broken glass to motor room windows. 53.replace broken light fixtures switch. 21. basement indicator glass cover.

    Nov 14, 1991 · Penalty $75

    Resolve
  • Non-hazardous

    18l,21x,(18)basement,2nd,3rd,4th&6th floor

    Sep 13, 1991

    Resolve
  • Non-hazardous

    35 p 1

    Mar 9, 1991

    Resolve
  • Non-hazardous

    35 p 7.

    Mar 9, 1991

    Resolve
  • Non-hazardous

    15l11,18l1,21x11,40#11,73#5. (15) sticking in open position at base- ment. (18) 3rd floor. (73) conduct a 5 year test.

    Oct 31, 1990

    Resolve
  • Non-hazardous

    34h 21i 37l 73# 34 repair or renow traveling cables 37 reverse phase relay 73 five year test and file elv3

    Oct 29, 1990 · Penalty $75

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt 6A

    Open
  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt 4A

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Pests

    Oct 19, 2026 · Apt 1C

    Open
  • Water leak

    Slow leak

    Oct 19, 2026 · Apt 1C

    Open
  • General

    Cooking gas

    Oct 19, 2026 · Apt 1C

    Open
Show 40 more ↓
  • General

    Signage missing

    Oct 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 18, 2026 · Apt 4E

    Open
  • Heat/hot water

    Apartment only

    Oct 18, 2026 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 2E

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Oct 13, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Oct 10, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Oct 1, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Sep 23, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 23, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Sep 11, 2026 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2026 · Apt 6A

    Close
  • Elevator

    Maintenance

    Aug 14, 2026 · Apt 6A

    Close
  • Outside building

    Roof door/hatch

    Aug 14, 2026 · Apt 6A

    Close
  • Door/window

    Door

    Aug 14, 2026 · Apt 6A

    Close
  • Paint/plaster

    Wall

    Aug 7, 2026 · Apt 2E

    Close
  • Plumbing

    Toilet

    Aug 7, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 2E

    Close
  • Door/window

    Door

    Aug 7, 2026 · Apt 2E

    Close
  • Plumbing

    Basin/sink

    Jul 19, 2026 · Apt 4E

    Close
  • Plumbing

    Bathtub/shower

    Jul 19, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Jul 19, 2026 · Apt 4E

    Close
  • Plumbing

    Bathtub/shower

    Jul 19, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Jul 19, 2026 · Apt 4E

    Close
  • Unsanitary condition

    Mold

    Jul 19, 2026 · Apt 4E

    Close
  • Unsanitary condition

    Pests

    Jul 14, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Jul 14, 2026 · Apt 4E

    Close
  • Unsanitary condition

    Mold

    Jun 22, 2026 · Apt 4E

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 20, 2026 · Apt BLDG

    Close
  • Safety

    Fire escape

    Apr 4, 2026 · Apt 6A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 24, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 24, 2026 · Apt 1E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1938
Floors
6
Residential units
238
Building area
255,400 ft²
Lot area
114,517 ft²
Zoning
R7-1
Community board
406
Council district
29
Block / lot
2103 / 1
Assessed value
$11,473,650
Landmark / historic district
No

HPD registration #426760, last renewed Oct 14, 2025.

Questions about 98-09 65 Road

Who owns 98-09 65 Road?

The owner of record in NYC Department of City Planning PLUTO data is Queens Portfolio V, LLC.

Does 98-09 65 Road have violations?

Yes. NYC HPD has recorded 171 housing violations at this property.

Is 98-09 65 Road rent stabilized?

NYC Department of Finance tax bills listed 231 rent-stabilized units here in 2024 (about 97% of its 238 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 98-09 65 Road built?

City records list 1938 as the year it was built.

How many apartments are in 98-09 65 Road?

It has 238 residential units and 240 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.