roofy

108-69 53 Avenue

Queens, NY 11368BBL 4-02008-0148Map

Owner of record: Lu, Feng

108-69 53 Avenue is a walk-up apartment building built in 2012 in Queens, 11368. It has 4 residential units across 4 floors. The owner of record is Lu, Feng. HPD has recorded 21 housing violations here, most recently on May 8, 2026. City tax records listed 4 rent-stabilized apartments here in 2018.

HPD violations
21
DOB violations
0
ECB violations
17
HPD complaints
17

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2018
4
About 100% of the building's 4 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 21

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 6, 2023

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jun 6, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jun 6, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 6, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jun 6, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 6, 2023

    Closed — Violation dismissed
  • C

    Remove the illegal fastening hasp and eye at bulkhead door at roof , 4th story

    Jun 6, 2023

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall , 4th story

    Jun 6, 2023

    Closed — Violation dismissed
Show 11 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story

    May 9, 2023

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 20, 2015

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall

    Jan 31, 2014

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 4, 4th story, 1st apartment from east at south

    Jan 31, 2014 · Apt 4

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4, 4th story, 1st apartment from east at south

    Jan 31, 2014 · Apt 4

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective broken glass pane at upper sash at north one window in the 3rd bathroom from east at north located at apt 4, 4th story, 1st apartment from east at south

    Jan 31, 2014 · Apt 4

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 1; located at apt 4, 4th story, 1st apartment from east at south

    Jan 31, 2014 · Apt 4

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 17

  • Class - 2

    Work does nto conform to approved plans.noted:foundtion wall on exp.(2) extends to rear property line, creating a retaining wall with adjacent property.difference 111 elevation(approx.2ft) @ righ rear requires

    Nov 9, 2011 · Penalty $250

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction measures.noted:pipc scaffold approx. 10ft high has no guardrails no toe boards, no screw jacks at bottom & platform not fully pl

    Oct 28, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per sec requirements.@ active 4 stay jobsite the following was observed.@ exp 1,just inside const fence piled up debris consisting of wood members,plastic bags,metal st

    Sep 7, 2011 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain sidewalk free from equipment. noted at time of inspection concrete placement underway, line pump for concrete located 108 st 6" pipe crossing sidewalk to site causing a tripping hazard to

    Jun 15, 2011 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction, no guardrails. noted: at time of inspection concrete placementunderway @ 1st flr opening for stwy approx front by5'unprotected

    Jun 15, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide special inspection of concrete placement. as noted:at time of inspection, i observed fresh concrete was being placed at 1st flr deck @ 3,500 psi lt. wt. concrete w/o a special inspector

    Jun 15, 2011 · Penalty $800

    Resolve
  • Class - 2

    Work does not conform to approved construction documents. noted: shoring for support of excavation under nb permit #420276917 is not instaleed as per soe plans amended 3/11/11. vertical soldier piles & lagging

    Jun 3, 2011 · Penalty $500

    Resolve
  • Class - 2

    Sec. 27-203 failure to comply w/safety requirements during construction operations as per 27-203. at exposure 2/westside 8'high wood construction fence is twisted,out of plumb & leaning w/nails sticking out and

    Mar 17, 2011 · Penalty $800

    Resolve
  • Class - 1

    Work does not conform to approved construction document & or approved amendments as noted: at time of inspection at a active construction site,concrete operation in progress,at foundation wall exposure #2,

    Jan 14, 2011 · Penalty $1,000

    Resolve
  • Class - 1

    Sec.bc 3303.11 maintenance of exist during construction or demolition.noted: at time of inspection on an active construction site,appx 10 workers on site,excavation & concrete operations in egress from site

    Jan 14, 2011 · Penalty $1,600

    Resolve
Show 7 more ↓
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments. upon inspection work on on going under permit #420298412.contractor excavated on 11ft shear cut at exp z and failed to provid

    Jan 14, 2011 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to provide protection at sides of excavation. upon inspection under permit #420298403.contractor excavated an approx 11ft shear cut at exp 2 and failed to provide to protection as called for in approved

    Jan 14, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3304.4.4.failure to provide 3 ft 6 inch guard rails or solid enclosure around open accessible side of excavation.upon inspection contractor failed to provide any guard rails around open excavation.immediate

    Jan 14, 2011 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. bc 3309.6 failure to monitor adjoining structures for movement in all directions during excavation related activity that may adversely affect adjoining structures. upon inspection contractor failed to prov

    Jan 14, 2011

    Resolve
  • Class - 2

    Failure to provide adequate testing in accordance w/bc 1704.4 as noted: at time of inspection at a active construction site,concrete operation in progress,concrete placement of footer at exposure #1,failure to

    Jan 14, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. bc 1905.11.1 failure to maintained regular concrete temperature 50 & above (outside temp 26) as noted: at time of inspection at a active construction site,concrete operation in progress,concrete placement

    Jan 14, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. bc 3303.11 maintenance of exits during construction or demolitionnoted: at time of inspection on an active construction site,appx 10 workers excavation & concrete operations (foundation) in progress. there

    Jan 14, 2011 · Penalty $1,600

    Resolve

Complaints

  • Plumbing

    Water supply

    Sep 17, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2021 · Apt 4F

    Close
  • General

    Cabinet

    Jan 7, 2021 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Jan 7, 2021 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Jan 7, 2021 · Apt 4F

    Close
  • Flooring/stairs

    Floor

    Jan 7, 2021 · Apt 4F

    Close
  • Paint/plaster

    Ceiling

    Jan 7, 2021 · Apt 4F

    Close
  • Paint/plaster

    Ceiling

    Jan 7, 2021 · Apt 4F

    Close
  • Door/window

    Door

    Jan 7, 2021 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Jan 7, 2021 · Apt 4F

    Close
Show 7 more ↓
  • Heat/hot water

    Apartment only

    Jan 1, 2018 · Apt 4FLR

    Close
  • Plumbing

    Water-leaks

    Jan 26, 2014 · Apt 4

    Close
  • General

    Mold

    Jan 26, 2014 · Apt 4

    Close
  • Plumbing

    Radiator

    Jan 26, 2014 · Apt 4

    Close
  • Plumbing

    Water-leaks

    Jun 12, 2013 · Apt 4

    Close
  • Plumbing

    Water-leaks

    Jun 12, 2013 · Apt 4

    Close
  • General

    Doors

    Jun 12, 2013 · Apt 4

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
2012
Floors
4
Residential units
4
Building area
3,877 ft²
Lot area
2,025 ft²
Zoning
R6B
Community board
404
Council district
21
Block / lot
2008 / 148
Assessed value
$459,000
Landmark / historic district
No

HPD registration #430689, last renewed Jul 20, 2026.

Questions about 108-69 53 Avenue

Who owns 108-69 53 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Lu, Feng.

Does 108-69 53 Avenue have violations?

Yes. NYC HPD has recorded 21 housing violations at this property.

Is 108-69 53 Avenue rent stabilized?

NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2018 (about 100% of its 4 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 108-69 53 Avenue built?

City records list 2012 as the year it was built.

How many apartments are in 108-69 53 Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.