roofy

85-19 Broadway

Queens, NY 11373BBL 4-01836-7501Map

Owner of record: 52nd And 90th Street Corp.

85-19 Broadway is a condominium built in 2006 in Queens, 11373. It has 26 residential units across 4 floors. The owner of record is 52nd And 90th Street Corp.. HPD has recorded 23 housing violations here, most recently on January 18, 2026. 18 of the 23 most recent violations are still open.

HPD violations
23
DOB violations
8
ECB violations
22
HPD complaints
30

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 23

  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story

    Jan 18, 2026

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st story

    Jan 18, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 23, 2019

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Apr 23, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 23, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 23, 2019

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 23, 2019

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
Show 13 more ↓
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • C

    Remove the illegal fastening double cyclinder key operated lock installed on vestibule door at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • C

    Remove the illegal fastening double cyclinder key operated lock installed on building entrance door at public hall, 1st story

    Apr 3, 2017

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby

    May 6, 2015

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby

    May 6, 2015

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing. at lobby

    May 6, 2015

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at lobby

    May 6, 2015

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby

    May 6, 2015

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder key lock on the bottom of both half of front entrance doors to building. 1sty

    May 6, 2015

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder key lock on vestibule door to lobby 1sty.

    May 6, 2015

    Open — Nov sent out
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***

    May 28, 2012

    Open — Nov sent out

DOB building violations · 8

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2019

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 19, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 11, 2011

    Dob violation - resolved

ECB violations · 22

  • Class - 2

    Failure to maintain exterior building facade and appurtenances. at time of inspection observed at exposure #2 inadequate repair with missing motar joints. at exposure #1 cracked/vertical crack. at exposure #3 m

    Dec 6, 2023 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit acceptable required cycle 8a & 9a report of criticalexamination documenting condition of exterior wall & appurtenances re quired by 28-302.4 for control #914687.agg1:prior nov 37021274k under

    Dec 2, 2022 · Penalty $10,000

    Active
  • Class - 2

    Repair oil leak. restore oil in tank.

    Sep 20, 2022 · Penalty $1,562

    Resolve
  • Class - 1

    The only elevator in the building or section of building out- of- service. upon inspection, the device is found to be out- of- service creating a hazardous condition as per 1rcny 11-02. remedy: restore to servi

    May 26, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#814687.agg1:prior nov 37011890p under 2

    Apr 1, 2021 · Penalty $10,000

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. noted: at 1st floor medical office evidence of water leak/water damage and ceiling of front and rear offices remedy: comply with code

    Sep 14, 2018 · Penalty $312

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documeting condition of exterior walls and appurtenances required by 28-302.4 for control #814687.rem:submit required technical report

    May 18, 2018 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #38257212m issued on 8/09/17, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certif

    Apr 9, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    14i11,25m7,39b11,41i10,46x10,46x10,68b7 (14i11)in car mirror damage replace. (25m7)in case of fire signage missing provide.(39b11)replace plastic light guard on top of car. (46x10)ambien temperature control ino

    Aug 9, 2017 · Penalty $500

    Resolve
  • Class - 2

    67x10,08v01. 67x- emergency phone repair. 08v- up direction leveling adjust.

    Jan 16, 2013 · Penalty $500

    Resolve
Show 12 more ↓
  • Class - 2

    Failure to comply w/the comm's order to file a cofc w/the dob noted ecb vio#34887900r condition still exist.rem:file cofc forthwith

    Mar 8, 2011 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order to file a certificate of correction w/the dept of buildings for notice of violation #34887900r. remedy: file a certificate of correction.

    Jan 12, 2011 · Penalty $800

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the cert of occupancy or dob records.noted:c of o#402239216t001 allows community facility in the cellar.however, appl#420245247-alt 1-to change use group for cellar was dis

    Oct 20, 2010 · Penalty $1,200

    Active
  • Non-hazardous

    Failure to provide approved plans at time of inspection under nb appl 402239216 no plans provided at time of inspection noted 10 men working remedy: stop all work provide approved plans

    Feb 1, 2008 · Penalty $250

    Resolve
  • Hazardous

    Failure to safely & properly remove debris from site. debris noted: approx. 10' h x 20' w debris pile consisting of construction debris, masonry scrap lumber & organic debris. prior ecb violation on 10/20/04 ap

    Jul 28, 2005 · Penalty $1,250

    Resolve
  • Hazardous

    Failure to weatherproof adjacent property. noted at time of inspection85-21 broadway has been demolished & adjacent property #85-19 broadwayhas been left unprotected. weatherproofing has not been completed. pri

    Jul 28, 2005 · Penalty $1,250

    Resolve
  • Hazardous

    Failure to weather proof adjoining structure bldg is down to grade & adjoining property #85-19 is not weather proofed. remedy:weather proof adj. property.

    Dec 10, 2004 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to remove combustible debris: demo# 402001971, noted: approx: 75 yards of comb: debris on right side of bldg roof to 3rd fl has been removed & contractor has failed to remove combustible debris. no one

    Oct 20, 2004 · Penalty $500

    Resolve
  • Non-hazardous

    No contractor sign posted. demolition of building was in progress at 3rd floor. no sign was posted at site. remedy: post contractor sign at site.

    Oct 6, 2004 · Penalty $500

    Resolve
  • Non-hazardous

    Demo unsafe. demolition of building was in progress at 3rd flr. windowglasses were still on building at 1st,2nd & 3rd floors. contractor failed to remove all glasses from building prior to demo: commencement

    Oct 6, 2004 · Penalty $2,000

    Resolve
  • Non-hazardous

    Failure to maintain;defect is in the cellar; the wooden columns supporting the ceiling have been deteriorated at the base.one column completely detached from the base suppor (floor)the ceiling joists in the cel

    Feb 8, 2000 · Penalty $800

    Resolve
  • Non-hazardous

    Boilers

    Jul 22, 1997 · Penalty $350

    Resolve

Complaints

  • Elevator

    Maintenance

    Nov 6, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 5, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 9, 2021 · Apt BLDG

    Close
  • Safety

    Smoke detector

    Jan 20, 2020 · Apt 7C

    Close
  • Safety

    Carbon monoxide detector

    Jan 20, 2020 · Apt 7C

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2020 · Apt 7C

    Close
  • Water leak

    Heavy flow

    Apr 20, 2019 · Apt FLOOR1

    Close
  • Plumbing

    Radiator

    Mar 31, 2017 · Apt 3B

    Close
  • Plumbing

    Radiator

    Mar 31, 2017 · Apt 3B

    Close
  • Plumbing

    Radiator

    Mar 31, 2017 · Apt 3B

    Close
Show 20 more ↓
  • Plumbing

    Radiator

    Mar 31, 2017 · Apt 3B

    Close
  • Plumbing

    Radiator

    Mar 31, 2017 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Mar 31, 2017 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Mar 31, 2017 · Apt 3B

    Close
  • Water leak

    Damp spot

    Jan 20, 2017 · Apt UNITD

    Close
  • Unsanitary condition

    Mold

    Nov 30, 2016 · Apt BSMT

    Close
  • Safety

    Fire escape

    Jan 21, 2015 · Apt BLDG

    Close
  • Safety

    Fire escape

    Jan 21, 2015 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Feb 9, 2012 · Apt 5D

    Close
  • Nonconst

    Vermin

    Feb 9, 2012 · Apt 5D

    Close
  • Heating

    Heat related

    Dec 30, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Dec 28, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Mar 18, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Mar 13, 2004 · Apt 3FL

    Close
  • Nonconst

    Vibrations

    Mar 12, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Mar 12, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Mar 11, 2004 · Apt 3FL

    Close
  • Heating

    Heat related

    Nov 13, 2003 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 10, 2003 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 26, 2003 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2006
Floors
4
Residential units
26
Building area
22,487 ft²
Lot area
5,829 ft²
Zoning
R7A
Community board
404
Council district
25
Block / lot
1836 / 7501
Assessed value
$2,820,151
Landmark / historic district
No

HPD registration #429029, last renewed Jul 29, 2025.

Questions about 85-19 Broadway

Who owns 85-19 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 52nd And 90th Street Corp..

Does 85-19 Broadway have violations?

Yes. NYC HPD has recorded 23 housing violations at this property.

Is 85-19 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 85-19 Broadway built?

City records list 2006 as the year it was built.

How many apartments are in 85-19 Broadway?

It has 26 residential units and 36 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.