100-10 37 Avenue
Queens, NY 11368BBL 4-01766-0004Map
Owner of record: Thomas Anagnostopoul
100-10 37 Avenue is a walk-up apartment building built in 1926 in Queens, 11368. It has 7 residential units across 3 floors. The owner of record is Thomas Anagnostopoul. HPD has recorded 52 housing violations here, most recently on October 26, 2020. 22 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 52
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 68
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 52
- ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors entrance located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 26, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 26, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 26, 2020
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2b, 2nd story, apartment at south
Oct 26, 2020 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective rain leader at front of building
Aug 22, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 20, 2017
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of shopping carts, shoes and other house hold items at public hall, 1st story
Jun 20, 2017
Open — Nov sent out - BHazardous
Properly repair the broken or defective counterbalance lower window sash in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south
May 27, 2017 · Apt 2B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance apartment located at apt 2b, 2nd story, 1st apartment from east at south
May 27, 2017 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2b, 2nd story, apartment at south
Feb 22, 2017 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt 2b, 2nd story, apartment at south
Feb 22, 2017 · Apt 2B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story, apartment at south
Feb 22, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Properly secure the loose lower sash window at the fire escape in the 2nd room from north at east located at apt 2b, 2nd story, apartment at south
Feb 22, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Feb 22, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Feb 22, 2017 · Apt 2B
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 22, 2017
Open — Not complied with - ANon-hazardous
Refit the door to the building entrance
Feb 22, 2017
Open — Not complied with - BHazardous
Remove all encumbrances consisting of shopping carts, shoes and other house hold items at public hall, 1st story
Feb 22, 2017
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bags of clothing and other house hold items at public hall, 1st story
Nov 17, 2016
Open — Invalid certification - BHazardous
Properly repair the broken or defective door knobs at the vestibule door at public hall, 1st story
Nov 17, 2016
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 17, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2016
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of shopping carts, mop buckets and other house hold items at public hall, 1st story
Oct 28, 2016
Open — Nov sent out - BHazardous
Replace the broken or defective uncaped for the steam vale at public hall, 1st story
Aug 22, 2015
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of steam valve protruding about 10'' up from the floor ( possible trip hazzard ) at public hall, 1st story
Aug 22, 2015
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of old metal mail boxes at vestibule at public hall, 1st story
Jun 24, 2015
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entrance at center court yard
Jun 24, 2015
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts bulb at front areaway, 1st story
Jun 24, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Apr 5, 2015
Open — Invalid certification - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east court at front areaway
Apr 24, 2014
Open — Invalid certification - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen & bathroom in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Apr 19, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective water supply pipe shut off valve at ceiling at cellar
Apr 19, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture ceiling in the 1st room from north located at apt 3-b, 3rd story
Feb 14, 2001 · Apt 3-B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wire ceiling in the 1st room from north located at apt 3-b, 3rd story
Feb 14, 2001 · Apt 3-B
Open — Nov sent out - BHazardous
Replace with new the broken or defective transom over door in the 1st room from north at west located at apt 3-b, 3rd story
Feb 14, 2001 · Apt 3-B
Open — Nov sent out - BHazardous
Replace with new the broken or defective entrance door in the 1st room from east at south located at apt 3-b, 3rd story
Feb 14, 2001 · Apt 3-B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3-b, 3rd story
Feb 14, 2001 · Apt 3-B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood tread 1 up 1 story at public hall
Feb 14, 2001
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective brickwork pointing party wall archway south yard at 2 sty level.
Jul 14, 1999
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 1 cement nosing south yard stair to lower level south yard.
Jul 14, 1999
Open — Nov sent out - BHazardous
Provide fire square feet of glazed surface at entrance door to bldg as per section 35 m d l.
Jul 14, 1999
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing cellar apt 1 ms vega. located at apt 1
Jul 14, 1999 · Apt 1
Open — Nov sent out - BHazardous
Discontinue unlawful overcrowding 366 square feet apt 1 living area maximum 3 person permitted marlene vega luis estrada 17 david estrada 14 dequa estrada 11 mary estrada 21 yr. located at apt 1
Jul 14, 1999 · Apt 1
Open — Nov sent out
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Fence exceeds permitted height upon insp. black iron fence approx 9ft high exceeds permitted height of 6ft as percode. remedy: reduce heightto code or remove
Oct 25, 2005 · Penalty $300
Active
Complaints
- Flooring/stairs
Floor
Oct 21, 2020 · Apt 2B
Close - Door/window
Door
Oct 21, 2020 · Apt 2B
Close - Plumbing
Toilet
Oct 21, 2020 · Apt 2B
Close - Unsanitary condition
Mold
Oct 21, 2020 · Apt 2B
Close - Unsanitary condition
Pests
Oct 21, 2020 · Apt 2B
Close - Heat/hot water
Entire building
May 13, 2019 · Apt 2B
Close - Heat/hot water
Entire building
Oct 18, 2018 · Apt 1A
Close - Outside building
Gutter/leader
Aug 14, 2018 · Apt 1A
Close - Heat/hot water
Entire building
May 10, 2017 · Apt 1A
Close - Heat/hot water
Entire building
May 8, 2017 · Apt 2B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 23, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Mar 3, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Feb 27, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Feb 20, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2016 · Apt BLDG
Close - Door/window
Door
Dec 15, 2016 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 15, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Dec 1, 2016 · Apt 1B
Close - Heat/hot water
Apartment only
Nov 21, 2016 · Apt 3A
Close - Heat/hot water
Entire building
Nov 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2016 · Apt 1A
Close - Heat/hot water
Apartment only
Oct 11, 2016 · Apt 1A
Close - Heat/hot water
Apartment only
May 6, 2016 · Apt 1A
Close - Heat/hot water
Entire building
May 4, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Apr 29, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Feb 12, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Nov 23, 2015 · Apt 1A
Close - Heat/hot water
Entire building
Oct 30, 2015 · Apt A2
Close - Heat/hot water
Entire building
Oct 18, 2015 · Apt 1A
Close - Electric
No lighting
Jun 23, 2015 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jun 23, 2015 · Apt 1A
Close - General
Janitor/super
Jun 23, 2015 · Apt 1A
Close - Heat/hot water
Entire building
Apr 27, 2015 · Apt 1A
Close - Heat/hot water
Apartment only
Apr 2, 2015 · Apt 1A
Close - Heat/hot water
Entire building
Oct 31, 2014 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 20, 2014 · Apt 1B
Close - Plumbing
Toilet
Aug 20, 2014 · Apt 1B
Close - Plumbing
Basin/sink
Aug 20, 2014 · Apt 1B
Close - Plumbing
Bathtub/shower
Aug 20, 2014 · Apt 1B
Close - Plumbing
Water supply
Aug 20, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Apr 29, 2014 · Apt 1A
Close - Heat/hot water
Entire building
Apr 27, 2014 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 3
- Residential units
- 7
- Building area
- 4,389 ft²
- Lot area
- 2,384 ft²
- Zoning
- R6B
- Community board
- 403
- Council district
- 21
- Block / lot
- 1766 / 4
- Assessed value
- $416,700
- Landmark / historic district
- No
HPD registration #404567, last renewed Jun 25, 2025.
Questions about 100-10 37 Avenue
Who owns 100-10 37 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Thomas Anagnostopoul.
Does 100-10 37 Avenue have violations?
Yes. NYC HPD has recorded 52 housing violations at this property.
Is 100-10 37 Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 100% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 100-10 37 Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 100-10 37 Avenue?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.