roofy

37-68 97 Street

Queens, NY 11368BBL 4-01759-0030Map

Owner of record: 37-68 97th Street LLC

37-68 97 Street is an elevator apartment building built in 1940 in Queens, 11368. It has 60 residential units across 6 floors. The owner of record is 37-68 97th Street LLC. HPD has recorded 87 housing violations here, most recently on March 31, 2025. 1 of the 50 most recent violations are still open. City tax records listed 59 rent-stabilized apartments here in 2024.

HPD violations
87
DOB violations
19
ECB violations
12
HPD complaints
124

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 31, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
59
About 98% of the building's 60 apartments
Up from 58 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 87

  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective base cabinet at washbasin in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east, the 4th room from east located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west , section ''north''

    Mar 31, 2025 · Apt 2B

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1d, 1st story, 2nd apartment from north at east

    Oct 3, 2024 · Apt 1D

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2e, 2nd story, 3rd apartment from north at east

    Oct 3, 2024 · Apt 2E

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5k, 5th story, 3rd apartment from south at west

    Oct 3, 2024 · Apt 5K

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2d, 2nd story, 2nd apartment from north at east

    Oct 3, 2024 · Apt 2D

    Closed — Violation closed
Show 40 more ↓
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6f, 6th story, 4th apartment from north at east

    Oct 3, 2024 · Apt 6F

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1e, 1st story, 3rd apartment from north at east

    Oct 3, 2024 · Apt 1E

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3b, 3rd story, 5th apartment from south at west

    Oct 3, 2024 · Apt 3B

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3j, 3rd story, 2nd apartment from south at west

    Oct 3, 2024 · Apt 3J

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4k, 4th story, 3rd apartment from south at west

    Oct 3, 2024 · Apt 4K

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1h, 1st story, 1st apartment from south at west

    Oct 3, 2024 · Apt 1H

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3h, 3rd story, 1st apartment from south at west

    Oct 3, 2024 · Apt 3H

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 1st apartment from north at east

    Oct 3, 2024 · Apt 5C

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6k, 6th story, 3rd apartment from south at west

    Oct 3, 2024 · Apt 6K

    Closed — Violation closed
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Jul 24, 2024 · Apt 6G

    Closed — Violation closed
  • C

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Jul 24, 2024 · Apt 6G

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door in compactor closet at public hall, 1st story

    Feb 26, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 5th story

    Feb 19, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice at compactor closet, 1st story

    Feb 19, 2024

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective hopper door frame at compactor closet at public hall, 1st story

    Oct 10, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door at compactor closet at public hall, 1st story

    Oct 10, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective building entrance door , 1st story

    Oct 10, 2022

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd stry balcony, 2nd stack from south at east ,(building front)

    Oct 10, 2022

    Closed — Violation dismissed
  • B

    Provide security in the event of a power outage an acceptable heavy duty lock and latch set for vestibule door , 1st story

    Nov 28, 2021

    Open — Invalid certification
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on vestibule door , 1st story

    Nov 28, 2021

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Nov 28, 2021

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the bathroom located at apt 2f, 2nd story, 4th apartment from north at east

    Nov 12, 2020 · Apt 2F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 4th apartment from north at east

    Nov 12, 2020 · Apt 2F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 4th apartment from north at east

    Nov 12, 2020 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 4th room from north at east, the bathroom , the 2nd room from north at east, the kitchen , the private hallway , the foyer located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the on grout at bathtub in the bathroom located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spring balance lower window sash at west wall in the kitchen located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 5j, 5th story, 2nd apartment from south at west

    Nov 8, 2019 · Apt 5J

    Closed — Violation dismissed
  • A

    Replace with new the missing electrical safety plug at east, west, south and north wall at public hall, 1st story

    Nov 8, 2019

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 5 sq ft. 1st window frame from west at north wall, 1st window frame from south at west wall in the 3rd room from east located at apt 6b, 6th story, 5th apartment from south at west

    Nov 1, 2019 · Apt 6B

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 6b, 6th story, 5th apartment from south at west

    Nov 1, 2019 · Apt 6B

    Closed — Violation dismissed
  • B

    Fire egress defective. remove the obstruction in fireproof passageway lock and chain installed at west gate at building front

    Nov 1, 2019

    Closed — Violation dismissed
  • A

    Replace with new the missing electric outlet safety cover/caps at public hall, 1st story

    Nov 1, 2019

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at south, the 3rd room from east located at apt 6b, 6th story, 5th apartment from south at west

    Nov 1, 2019 · Apt 6B

    Closed — Violation dismissed
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner

    Aug 20, 2019 · Apt 6J

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west

    Aug 6, 2019 · Apt 6J

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west

    Aug 6, 2019 · Apt 6J

    Closed — Violation dismissed

DOB building violations · 19

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 10, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2019

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 17, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 18, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 29, 2011

    Dob violation - resolved
Show 9 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 25, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 18, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 17, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 16, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    4p1146

    Aug 29, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Elevator elevatorrequired

    (74)restore elevator to service, so that a proper inspection can be made by this department

    May 29, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (38)door timing (51)provide splice box covers on top of car (52)provide light on top of car (53)eliminate excessive noise in shaft while car is in motion (43)eliminate excessive play between car and rails

    Nov 17, 1988

    Dob violation - resolved

ECB violations · 12

  • Class - 1

    05x10,42l10,42g11,16e01,39o02-05x10)door zone restrictor is not operative. this is a safety device to ensure elevator passengers safety. 42l10)repair controller. 42g11)replace improper fuses. osha 29 cfr 1910.3

    Jul 17, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Work w/o a permit. noted: in violation of rules of the city of ny-1 rcny 101-14 table 3 - 3,front facade at 1st fl level installed ceramic tiles to under lying brick wall. approx area 100sq ft work 100% complet

    Apr 6, 2012 · Penalty $800

    Resolve
  • Hazardous

    50,50a,b.50-smoke pipe supported w/banding iron.50a-missing check valve for boiler feed line.50b-sail switch for fresh air intake fan defective.

    Jul 20, 2007

    Resolve
  • Non-hazardous

    09a10, 59q03, 16e01, 39b07. 09-a-10 car fl too high over the car saddle causing tripping hazard. 16-e-01 basement door mbs fl. 39-b-07 fire extinguisher in machine room.

    Aug 29, 2006

    Resolve
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept of bldg record indicates premises to be legally approved for a (60) family basement, boileroom. residenc

    Aug 26, 2005 · Penalty $3,050

    Resolve
  • Hazardous

    Work w/o permit. work noted: at cellar level erected partition and installed water and waste line for a (2) 3 piece bathroom (sink,toilet,shower) and residential sink with 220 volt electric line for stove. reme

    Aug 26, 2005

    Resolve
  • Non-hazardous

    Work w/o permit work noted at apt 6g6 fl and at apt 5g 5th fl erected non bearing walls to the ceiling with doors in both bedrooms apartment creating 2-3 bedroom apartment remedy obtain permit or restore to pri

    Oct 16, 2003 · Penalty $500

    Resolve
  • Non-hazardous

    75#,74m.35i,15m,25m,01l.74 device tag on main lime sw. 35 window. 15 grill guard on 6th floor. 25 cover for elct. box. 01 switch to be re- versed.

    Oct 23, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    35p,28h,14m,8v,15p,57o. 35 unable to gain access to machine room to complete inspection. transparent face 15 bsmt.

    May 5, 1993

    Resolve
  • Non-hazardous

    08v,28h,37g,52l,52-provide cotter pins to brake.

    Aug 24, 1992

    Resolve
Show 2 more ↓
  • Non-hazardous

    8v,15l,30o,57o,58o,59o,74#,15 2nd floor 74 remove noise from car

    Dec 9, 1991 · Penalty $185

    Resolve
  • Non-hazardous

    08v,15b,17l,17m,21l,05b,25d,28h,35d,35l,35m,37a,52y,55l,35o,57o,58o,59o,03m,15 ad hoist 2fl for full swing without rubbing floor 15 ad hoist bsmt door or replace same (bsmt door bent), remove bsmt door door hol

    Jan 15, 1991

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 30, 2025 · Apt 1E

    Close
  • Heat/hot water

    Entire building

    Oct 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 30, 2025 · Apt 2B

    Close
  • Safety

    Window guard broken/missing

    Mar 30, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Mar 30, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Mar 30, 2025 · Apt 2B

    Close
  • Safety

    Window guard broken/missing

    Mar 26, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Mar 26, 2025 · Apt 2B

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Mar 26, 2025 · Apt 2B

    Close
  • Safety

    Window guard broken/missing

    Jul 1, 2024 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Mar 10, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2021 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2021 · Apt 3C

    Close
  • Paint/plaster

    Ceiling

    Nov 6, 2020 · Apt 2F

    Close
  • Electric

    Lighting

    Nov 6, 2020 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Nov 6, 2020 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Nov 6, 2020 · Apt 2F

    Close
  • Door/window

    Window frame

    Nov 6, 2020 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2019 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Aug 5, 2019 · Apt 6J

    Close
  • Safety

    Window guard broken/missing

    Aug 5, 2019 · Apt 6J

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2018 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2017 · Apt BLDG

    Close
  • Door/window

    Window frame

    Sep 2, 2016 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2015 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2015 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2015 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2015 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2015 · Apt 5E

    Close
  • Heating

    Heat related

    Jan 22, 2014 · Apt 4C

    Close
  • Heating

    Heat related

    Jan 2, 2014 · Apt 5C

    Close
  • Paint/plaster

    Wall

    Dec 24, 2013 · Apt 4K

    Close
  • General

    Windows

    Dec 24, 2013 · Apt 4K

    Close
  • Appliance

    Electric/gas range

    Dec 24, 2013 · Apt 4K

    Close
  • Plumbing

    Water-leaks

    Dec 24, 2013 · Apt 4K

    Close
  • General

    Cabinet

    Dec 24, 2013 · Apt 4K

    Close
  • Nonconst

    Vermin

    Dec 24, 2013 · Apt 4K

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1940
Floors
6
Residential units
60
Building area
64,200 ft²
Lot area
11,900 ft²
Zoning
R6A
Community board
403
Council district
21
Block / lot
1759 / 30
Assessed value
$1,841,400
Landmark / historic district
No

HPD registration #408565, last renewed Aug 26, 2025.

Questions about 37-68 97 Street

Who owns 37-68 97 Street?

The owner of record in NYC Department of City Planning PLUTO data is 37-68 97th Street LLC.

Does 37-68 97 Street have violations?

Yes. NYC HPD has recorded 87 housing violations at this property.

Is 37-68 97 Street rent stabilized?

NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024 (about 98% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 37-68 97 Street built?

City records list 1940 as the year it was built.

How many apartments are in 37-68 97 Street?

It has 60 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.