35-20 108 Street
Queens, NY 11368BBL 4-01749-0030Map
Owner of record: Brg 3520 108 LLC
35-20 108 Street is a walk-up apartment building built in 1928 in Queens, 11368. It has 16 residential units across 4 floors. The owner of record is Brg 3520 108 LLC. HPD has recorded 117 housing violations here, most recently on March 19, 2025. 1 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 117
- DOB violations
- 5
- ECB violations
- 1
- HPD complaints
- 260
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 117
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Mar 19, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Mar 19, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes buckets on 3rd story balcony at building front at fire escape
Jun 4, 2024
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east, the 1st room from east at south, the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 3 sq ft at ceiling and west wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door from south at west wall in the foyer located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles. approx 6 sq ft in the kitchen located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 3d, 3rd story, 2nd apartment from north at east
Apr 27, 2023 · Apt 3D
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east
Feb 9, 2021 · Apt 3D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east
Feb 9, 2021 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east
Feb 9, 2021 · Apt 3D
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3d, 3rd story, 2nd apartment from north at east
Feb 9, 2021 · Apt 3D
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of heat on during summer in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Jun 13, 2020 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Jun 13, 2020 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Jun 13, 2020 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of the supply of heat in summer in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electric light fixture at west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electric light fixture at ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2020 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of thje guillotine effect at lower sash at fire escape window in the 4th room from east located at apt 2a, 2nd story, 1st apartment from east at south
Jun 7, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower sash to window at south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2020 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Dec 16, 2019 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Dec 16, 2019 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Dec 16, 2019 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Dec 16, 2019
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 28, 2017 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Refit wood door in the 1st room from east located at apt 1c, 1st story, 1st apartment from east at south
Sep 7, 2017 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Sep 7, 2017 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Sep 7, 2017 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1c, 1st story, 1st apartment from east at south
Sep 7, 2017 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell buzzer return intercom in the kitchen located at apt 1c, 1st story, 1st apartment from east at south
Sep 7, 2017 · Apt 1C
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jul 12, 2016
Closed — Violation dismissed - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Mar 10, 2016 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the 1st room from east, the 4th room from east located at apt 1b, 1st story, 1st apartment from west at north
Nov 18, 2015 · Apt 1B
Closed — Violation closed - ANon-hazardous
Repair leaky water closet flush pipe connection at water closet in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Nov 13, 2015 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 6th room from east located at apt 1b, 1st story, 1st apartment from west at north
Nov 13, 2015 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... on north and west walls in the 4th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 13, 2015 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 17, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective lock at entrance door to building
Mar 31, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Mar 31, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Replace with new the missing steam regulating knob at radiator in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at arround the second window frame from west at north in the 2nd room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at arround the first window frame from west at north in the 2nd room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at around the window frame in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Jan 1, 2015 · Apt 2B
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 1
- Hazardous
Exit passageway corridor obstructed. accumulation of several garbage bags being stored at side passageway at time of inspection-south side passageway. remedy: clean garbage bags from exit passageway foundation.
Feb 21, 2006
Resolve
Complaints
- Water leak
Damp spot
Jun 3, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Jun 3, 2026 · Apt 3B
Close - Water leak
Slow leak
Jun 3, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 3, 2026 · Apt 3B
Close - Water leak
Slow leak
Aug 4, 2025 · Apt 3B
Close - Water leak
Damp spot
Aug 4, 2025 · Apt 3B
Close - Paint/plaster
Ceiling
Aug 4, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Aug 4, 2025 · Apt 3B
Close - Paint/plaster
Ceiling
Jun 1, 2025 · Apt 4
Close - Water leak
Damp spot
Jun 1, 2025 · Apt 4
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jun 1, 2025 · Apt 4
Close - Water leak
Slow leak
Jun 1, 2025 · Apt 4
Close - Water leak
Slow leak
May 28, 2025 · Apt 4
Close - Paint/plaster
Ceiling
May 28, 2025 · Apt 4
Close - Unsanitary condition
Pests
May 28, 2025 · Apt 4
Close - Water leak
Heavy flow
Mar 16, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Mar 16, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Mar 16, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Dec 17, 2024 · Apt BLDG
Close - Water leak
Slow leak
Jul 22, 2024 · Apt 2C
Close - Water leak
Damp spot
Jul 22, 2024 · Apt 2C
Close - Paint/plaster
Ceiling
Jul 22, 2024 · Apt 2C
Close - Plumbing
Water supply
Feb 14, 2024 · Apt 3D
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 21, 2023 · Apt 3D
Close - Unsanitary condition
Mold
Apr 21, 2023 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 8, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 27, 2021 · Apt 3D
Close - Heat/hot water
Apartment only
Jul 25, 2021 · Apt 3D
Close - Paint/plaster
Ceiling
Jul 25, 2021 · Apt 3D
Close - Water leak
Slow leak
Jul 25, 2021 · Apt 3D
Close - Electric
Outlet/switch
Jul 25, 2021 · Apt 3D
Close - Unsanitary condition
Mold
Jul 25, 2021 · Apt 3D
Close - Heat/hot water
Apartment only
Jul 15, 2021 · Apt 3D
Close - Paint/plaster
Wall
Jul 15, 2021 · Apt 3D
Close - Paint/plaster
Wall
Jul 15, 2021 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 2, 2021 · Apt 3D
Close - Flooring/stairs
Floor
Feb 2, 2021 · Apt 3D
Close - Door/window
Window frame
Feb 2, 2021 · Apt 3D
Close - General
Cabinet
Feb 2, 2021 · Apt 3D
Close - Heat/hot water
Entire building
Aug 14, 2020 · Apt 1B
Close - Heat/hot water
Entire building
Jun 12, 2020 · Apt 3C
Close - Heat/hot water
Entire building
Jun 4, 2020 · Apt 2A
Close - Heat/hot water
Apartment only
Jun 4, 2020 · Apt 2A
Close - Heat/hot water
Entire building
Mar 2, 2020 · Apt 4B
Close - Heat/hot water
Entire building
Dec 19, 2019 · Apt A1
Close - Heat/hot water
Entire building
Dec 17, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2019 · Apt 2B
Close - Heat/hot water
Entire building
Dec 16, 2019 · Apt 2B
Close - Heat/hot water
Entire building
Dec 11, 2019 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 16
- Building area
- 10,304 ft²
- Lot area
- 3,400 ft²
- Zoning
- R5
- Community board
- 403
- Council district
- 21
- Block / lot
- 1749 / 30
- Assessed value
- $415,800
- Landmark / historic district
- No
HPD registration #415343, last renewed Jul 28, 2025.
Questions about 35-20 108 Street
Who owns 35-20 108 Street?
The owner of record in NYC Department of City Planning PLUTO data is Brg 3520 108 LLC.
Does 35-20 108 Street have violations?
Yes. NYC HPD has recorded 117 housing violations at this property.
Is 35-20 108 Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 88% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 35-20 108 Street built?
City records list 1928 as the year it was built.
How many apartments are in 35-20 108 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.