44-30 Macnish Street
Queens, NY 11373BBL 4-01561-0025Map
Owner of record: Nouri Realty, LLC
44-30 Macnish Street is an elevator apartment building built in 1962 in Queens, 11373. It has 66 residential units across 7 floors. The owner of record is Nouri Realty, LLC. HPD has recorded 322 housing violations here, most recently on July 22, 2026. 36 of the 50 most recent violations are still open. City tax records listed 67 rent-stabilized apartments here in 2024.
- HPD violations
- 322
- DOB violations
- 43
- ECB violations
- 37
- HPD complaints
- 491
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 322
- ANon-hazardous
Cleanse to the satisfaction of this department the compactor closet labeled as 5th story at public hall, 4th story
Jul 22, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes houshold items at 2nd stack from south at west building front at fire escape, 5th story
Jul 19, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes houshold items at 1st stack from south at west building front at fire escape, 6th story
Jul 19, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 2nd story balcony at building rear at fire escape
Jun 1, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 4th story balcony at building south at fire escape
Jun 1, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 6th story balcony at building south at fire escape
Jun 1, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air-conditioner protruding beyond window sill at 4th story balcony at 1st stack from south at building front at fire escape
Jun 1, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 3rd story balcony at 1st stack from south at building front at fire escape
Jun 1, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 2nd story balcony at 1st stack from south at building front at fire escape
Jun 1, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 6th story balcony at 1st stack from south at building front at fire escape
Jun 1, 2026
Open — Not complied with
Show 40 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 1, 2026
Open — False certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at vestibule door 2nd door from south leading to handicap ramp at public hall entrance story at basement, section ''44-30''
Jun 1, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the compactor closet (labeled as 5th floor) at public hall, 4th story, section ''44-30''
Jun 1, 2026
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor (labeled as 6th floor) at compactor closet, 5th story
Mar 8, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor (labeled as 5th floor) at compactor closet, 4th story
Mar 8, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door (labeled as 5th floor) at compactor closet, 4th story
Mar 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set (labeled as 5th floor) at compactor closet, 4th story
Mar 8, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at fire door at east wall leading to fire stairs at public hall, cellar entrance story
Mar 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door at east wall leading to fire stairs at public hall, cellar entrance story
Mar 8, 2026
Closed — Violation closed - BHazardous
Properly secure the loose handrail at stairs at north wall at vestibule, cellar entrance story
Mar 8, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at basement
Mar 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire stair exit (labeled as 1st floor) at basement
Mar 6, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 4th story
Mar 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch (labeled as 5th floor) at compactor closet, 4th story
Mar 6, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor (labeled as 7th floor) at compactor closet, 6th story
Mar 2, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 2, 2026
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar at boiler room
Jan 29, 2026
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3k, 3rd story, 1st apartment from south at west
Jan 29, 2026 · Apt 3K
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balconies east stack building front at fire escape, 2nd story
Nov 22, 2025
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at in the entrance located at apt 4g, 3rd story, 1st apartment from north at east
Nov 22, 2025 · Apt 4G
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of lockable door knob assembly at entrance door to room leading to fire escape in the 1st room from east at south located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east at south located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water of 142 degrees; exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 5a, 4th story, 2nd apartment from east at south
Jun 4, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective binding door and door frame at compactor closet on south at public hall, 6th story
Jun 3, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story
Apr 14, 2025
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st story
Apr 14, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... ceiling less than 10 square foot in the 1st bathroom from north located at apt 5k, 4th story, 1st apartment from east at south original violation 17674792 issued 05-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 5, 2025 · Apt 5K
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective latch on door leading to boiler room at cellar
Feb 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on door leading to boiler room at cellar
Feb 5, 2025
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... ceiling less than 10 square foot in the 1st bathroom from north located at apt 5k, 4th story, 1st apartment from east at south
Feb 5, 2025 · Apt 5K
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5k, 4th story, 1st apartment from east at south
Feb 5, 2025 · Apt 5K
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5k, 4th story, 1st apartment from east at south
Feb 5, 2025 · Apt 5K
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5k, 4th story, 1st apartment from east at south
Feb 5, 2025 · Apt 5K
Closed — Violation dismissed
DOB building violations · 43
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Structurte rendered non compliant damages observed to have been caused by vehicle into a sidewalk shed . vehicle impact has knocked 2 verti cal supports out of postion with 1 horizontal i bean to collapse and another i ben hanging
Nov 11, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active
Show 33 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - Plumbing none
Applicant of record alberto roman,pe surrendered all filing privileges.stop all plumbing work under permit # q00499285
Aug 11, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 18, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 1990
Dob violation - resolved
ECB violations · 37
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39186639m., file a certificate of correction
Aug 10, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain inadequate and egress plus compromised due to workwithout a permit at the time of inspection observed loose hanging on finished wiring throughout the cellar. remedy: repair and/or replace.
Apr 30, 2026 · Penalty $2,500
Active - Class - 1
Observered new electrical panel.using romex with exposed wire nuts also outside work done in the cellar split unit ac with disconnect switches., obtain permit
Apr 29, 2026 · Penalty $1,250
Resolve - Class - 1
As per c of o q000151069 commercial space was converted into living quarter with 3 piece bathroom with no secon means of egress and insufficient lighting and ventilation also observe beds, discontinue illegal o
Apr 29, 2026 · Penalty $2,500
Active - Class - 1
Observerd plumbing work to create 3 piece bathroom with shower in cellar, obtain permit
Apr 29, 2026 · Penalty $1,250
Resolve - Class - 2
Sidewalk shed bc3307.6. observe sidewalk shed vertical members not plumb at vehicular accesits point+missing braces throughout, sheds underside pedestrian passageway not minimum clear ceiling height of 8 feet o
Nov 13, 2023 · Penalty $5,000
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note:at time of inspection observed step cracking at floor 4 through 6 at fire escapes,deteriorating mortar joints,spalled bricks,eroded window sil
May 20, 2021 · Penalty $5,000
Resolve - Class - 1
103-04 owner failed to repiar defective conditions.exp3 west elevationcracked brick masonry at 7th floor.exp4 north elevation rusted window lintels at 2nd floor within time frame recommended by qewl.qewl recomm
Apr 9, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to maintain exterior building facade or appurtenances.note at time of inspection observed at exposure#2 south elevation flower pot stored on window sill at 5th floor next to fire escape.inadequately sto
Apr 9, 2021 · Penalty $3,125
Resolve - Class - 2
Brake pads worn. replace. phone in cab inoperative. repair. nyc device # in cab missing. provide. inspection certificate frame missing provide. door open button inoperative. repair. 2nd crosby on spinout missin
Sep 15, 2020 · Penalty $1,562
Resolve
Show 27 more ↓
- Class - 2
100m07 67l10 14l11:100-provide handrail in car.67-repair phone in car.14-replace defective mirror in car.
Jan 7, 2015 · Penalty $2,500
Resolve - Class - 2
67x10,56y13,39o02,70o02. 67x10-emergency phone; 39o02-oil on top of car.
Oct 26, 2012
Resolve - Class - 2
56y13,56o02,58b10,03x10,05l10: 58b10;thurst play. 03x10;in car communication. 05l10;zone lock
Jul 23, 2012 · Penalty $500
Resolve - Class - 2
Failure to maintain building in a code compliant manner. noted:broken hand rail support bracket at ground level main entry vestibule stair. rem:repair/replace broken bracket.
Mar 19, 2012 · Penalty $250
Resolve - Class - 2
56y13,56o02,68m07,73o02,74o02,34o02,39o02:
Jan 17, 2012 · Penalty $250
Resolve - Class - 2
70o02 73o02 74o02 71x10 60q03 69m07 68b# 40m07 68b# provide up to datemaintenance log 40m07 fire extinguisher
May 24, 2011 · Penalty $250
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Sep 20, 2010 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection exterior walls & appurtenaces28.302 & the dob rules & regulations.rem:file the required report to t
Jul 16, 2010 · Penalty $4,000
Resolve - Class - 2
Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remedy:fil
Feb 17, 2010 · Penalty $8,000
Resolve - Class - 3
Work without a permit. work noted: at apt 37k erected full height partition dividing room from kitchen to next room area. 100% of work completed. rem: obtain permit or restore to prior legal condition.
Sep 14, 2009 · Penalty $100
Resolve - Class - 2
15m07.98bb05.42g11.68m07.56y13.56o02.41m07.39o02.32h10.17h11.70o02.34o02. 42g11 jumped fuses
Feb 23, 2009
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved number of families. dob records m.d.r. indicate premises tobe 68 family residence is now altered for occupancy for 68 family &
Feb 19, 2009 · Penalty $600
Resolve - Class - 1
Work w/o a permit. work noted: at 4th fl apt 4h erected full height partitions to create 3 bedroom & installed entry doors w/key locking device. remedy: obtain permit or restore to prior legal condition.
Feb 19, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit way. noted: at 4 fl level apt 4h secondary means of egress (fire escape) blocked by door w/key locking device. remedy: remove obstruction.
Feb 19, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report on compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules & regulations
Dec 19, 2008 · Penalty $800
Resolve - Non-hazardous
Total obstruction. noted: 7 story bldg. staircase of entire bldg are closed doors are locked every fl. second mean of egress locked doors are locking by metal cable. remedy: remove obstruction
Sep 12, 2007 · Penalty $480
Resolve - Non-hazardous
17r11/17h11/55y13/66o2/44t7/17-r-11-zip screws no longer legal in nyc replace w/proper hardware.
May 1, 2007 · Penalty $350
Resolve - Non-hazardous
B4a,18a,50a.50a-condensate return tank,vent pipe leaking
Feb 13, 2007
Resolve - Hazardous
Work w/o a permit. work noted: at sub-cellar premises installed water and waste lines for a 3 piece bathroom(toilet,sink,shower) and residential sink. remedy: obtain permit or restore to prior legal condition.
Sep 23, 2005 · Penalty $800
Resolve - Non-hazardous
Shed does not meet bldg code specification. violation noted: sidewalk shed in front of above property not lighted at time of inspection + 3 bulbs broken (missing) + vanolal proof fixture is missing on 2 bulbs
Jun 8, 2005 · Penalty $2,000
Resolve - Non-hazardous
Sidewalk shed erected without permit.approx 200 linear feet of heavy duty shed on whitney ave and macnish st.remedy:obtain sidewalk shed permit.
May 7, 2005 · Penalty $200
Resolve - Non-hazardous
12b07,66o02,86u05. 12-b-07-replace two dome light
Dec 16, 2003 · Penalty $350
Resolve - Non-hazardous
49/no discharge pipe on safety valve 48c/missing drain line on gauge class assembly 32a/loose connections on main power supply to boiler
Jul 5, 2002 · Penalty $180
Resolve - Non-hazardous
8v,22d,50y,73o,36i,11l.
Dec 16, 1999 · Penalty $350
Resolve - Non-hazardous
49-water column water nipple to the boiler corroded & leaking to replace by new one if the shell plate is ok.
Sep 30, 1998
Resolve - Non-hazardous
08v;28f;35o;57o;
Jan 22, 1992
Resolve - Non-hazardous
Occupancy contrary to building department records. remedy: obtain a valid c of o.
Dec 14, 1989
Resolve
Complaints
- Plumbing
Bathtub/shower
Oct 22, 2026 · Apt 6L
Open - Plumbing
Basin/sink
Oct 22, 2026 · Apt 6L
Open - Plumbing
Basin/sink
Oct 19, 2026 · Apt 6L
Open - Plumbing
Bathtub/shower
Oct 19, 2026 · Apt 6L
Open - Unsanitary condition
Garbage/recycling storage
Aug 26, 2026 · Apt BLDG
Close - Door/window
Door
Jul 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 29, 2026 · Apt 5K
Close - Plumbing
Water supply
Apr 13, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt 5K
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 7, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 3K
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 5K
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3K
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 5K
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt 4G
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt 5K
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt 4J
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt 5K
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 4G
Close - Heat/hot water
Entire building
Jun 3, 2025 · Apt 5K
Close - Heat/hot water
Entire building
Jun 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Apr 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 20, 2025 · Apt 5K
Close - Heat/hot water
Entire building
Mar 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1962
- Floors
- 7
- Residential units
- 66
- Building area
- 61,318 ft²
- Lot area
- 13,908 ft²
- Zoning
- R7B
- Community board
- 404
- Council district
- 25
- Block / lot
- 1561 / 25
- Assessed value
- $2,995,650
- Landmark / historic district
- No
HPD registration #420087, last renewed Jul 23, 2026.
Questions about 44-30 Macnish Street
Who owns 44-30 Macnish Street?
The owner of record in NYC Department of City Planning PLUTO data is Nouri Realty, LLC.
Does 44-30 Macnish Street have violations?
Yes. NYC HPD has recorded 322 housing violations at this property.
Is 44-30 Macnish Street rent stabilized?
NYC Department of Finance tax bills listed 67 rent-stabilized units here in 2024 (about 100% of its 66 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 44-30 Macnish Street built?
City records list 1962 as the year it was built.
How many apartments are in 44-30 Macnish Street?
It has 66 residential units and 72 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.