80-30 Broadway
Queens, NY 11373BBL 4-01526-0010Map
Owner of record: Elmhurst Woodside LLC
80-30 Broadway is a walk-up apartment building built in 1928 in Queens, 11373. It has 26 residential units across 5 floors. The owner of record is Elmhurst Woodside LLC. HPD has recorded 139 housing violations here, most recently on April 22, 2026. 4 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 139
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 189
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond the window sill at north stack building front at fire escape, 4th story
Apr 22, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond the window sill at north stack building front at fire escape, 5th story
Apr 22, 2026
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1e, 1st story, 2nd apartment from east at south
Mar 22, 2026 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. properly secure bottom front rail unbolted from bottom return rail at fire escape, 3rd story
Oct 25, 2025
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 1st stack from south building east at fire escape
Nov 26, 2024
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing missing 2 baluster at south corner at balcony at west at fire escape, 5th story
Nov 11, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq feet at all walls in the bathroom located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1e, 1st story, 2nd apartment from east at south
Oct 23, 2024 · Apt 1E
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes debris & wires at 4th story at north building front at fire escape
Sep 25, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of construction supplies under stairs at public hall, 1st story
Sep 25, 2024
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at (less than 1sqft) 1st window frame from north at east wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the foyer located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from east at south wall in the foyer located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Properly secure the loose electricla outlet cover at south wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner bracket protrusion at window to balcony , building front at fire escape, 3rd story
Aug 22, 2024
Closed — Violation closed - BHazardous
Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line cyclone exit gate at fence padlocked , at east yard yard
Aug 22, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked and missig ceramic floor tiles at public hall, 1st story
Aug 22, 2024
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bathub, east wall, in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the 4th room from north located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 22, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 14, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at riser in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 14, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 9, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 9, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste pipe at sink in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 9, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 9, 2024 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Aug 9, 2024 · Apt 3B
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ac bracket protruding beyond window sill on 4th story balcony at building east at fire escape
May 7, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ac bracket protruding beyond window sill on 3rd story balcony at building east at fire escape
May 7, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4e, 4th story, 2nd apartment from east at south
Dec 26, 2021 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the kitchen located at apt 4e, 4th story, 2nd apartment from east at south
Dec 26, 2021 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 2nd apartment from east at south
Dec 26, 2021 · Apt 4E
Closed — Violation dismissed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to maintain bldg wall(2) or appurtenances. noted: multiple minor cracks of unknown cause thru mortar joints and bricks on facade walls on braodway and 81st st. rem: maintain exterior bldg wall(s).
May 3, 2010 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
May 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 30, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 5B
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 5D
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2025 · Apt 1B
Close - Plumbing
Water supply
Jun 1, 2025 · Apt 4B
Close - Unsanitary condition
Mold
Jun 1, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Apr 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Mar 25, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Nov 10, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Oct 30, 2024 · Apt 3B
Close - Water leak
Slow leak
Oct 30, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Oct 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 21, 2024 · Apt 1E
Close - Paint/plaster
Ceiling
Sep 11, 2024 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 5
- Residential units
- 26
- Building area
- 19,365 ft²
- Lot area
- 4,502 ft²
- Zoning
- R7A
- Community board
- 404
- Council district
- 25
- Block / lot
- 1526 / 10
- Assessed value
- $684,450
- Landmark / historic district
- No
HPD registration #400083, last renewed Sep 6, 2025.
Questions about 80-30 Broadway
Who owns 80-30 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Elmhurst Woodside LLC.
Does 80-30 Broadway have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 80-30 Broadway rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 96% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 80-30 Broadway built?
City records list 1928 as the year it was built.
How many apartments are in 80-30 Broadway?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.