34-58 90 Street
Queens, NY 11372BBL 4-01450-0032Map
Owner of record: Jackson Heights Plz C
34-58 90 Street is an elevator apartment building built in 1928 in Queens, 11372. It has 54 residential units across 6 floors. The owner of record is Jackson Heights Plz C. HPD has recorded 150 housing violations here, most recently on August 21, 2026. 29 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 150
- DOB violations
- 21
- ECB violations
- 6
- HPD complaints
- 111
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 150
- CImmediately hazardous
Remove the illegal fastening consisting of key operated double cylinder lock installed at metal gate, 1st from north at building front yard
Aug 21, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 21, 2026
Open — Nov certified on time - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt m1, 1st story, 3rd apartment from south at west
Jul 19, 2026 · Apt M1
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling in the bathroom located at apt l2, 2nd story, 1st apartment from north at east
Jul 19, 2026 · Apt L2
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt l2, 2nd story, 1st apartment from north at east
Jul 19, 2026 · Apt L2
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jul 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 19, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt l6, 6th story, 1st apartment from west at north
Dec 6, 2025 · Apt L6
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt l6, 6th story, 1st apartment from west at north
Dec 6, 2025 · Apt L6
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and north wall in the bathroom located at apt l6, 6th story, 1st apartment from west at north original violation 18489202 issued 06-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 6, 2025 · Apt L6
Open — First no access to re- inspect violation - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story
Dec 6, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at vestibule door , 1st story
Dec 6, 2025
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door , 1st story
Dec 6, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at building entrance door , 1st story
Dec 6, 2025
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and north wall in the bathroom located at apt l6, 6th story, 1st apartment from west at north
Dec 6, 2025 · Apt L6
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 2nd fire door from east at public hall, 5th story
Jun 21, 2025
Closed — Violation closed - BHazardous
Provide security in the event of a power failure by means of an accepatable mechanical heavy duty lock and latch set at building entrance door , 1st story
Jun 21, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 3rd fire door from east at public hall, 5th story
Jun 21, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story
Jun 21, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 1st room from north at east located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door from east at south wall in the foyer located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment denied - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door from south at west wall, 1st door frame from south at west wall, south wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, 1st window frame from north at east wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall in the kitchen located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 4th room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''
Apr 8, 2025 · Apt 5R
Open — First no access to re- inspect violation - CImmediately hazardous
Remove device preventing door from being self-closing consisting of metal weight at fire door leading to north yard, east section at public hall
Oct 5, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of large concrete block at fire door leading to north yard, west section at public hall
Oct 5, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 31, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder lock at lot line gate
Aug 17, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1k, 1st story, 3rd apartment from east at south
Sep 19, 2022 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 2m, 2nd story, 3rd apartment from west at north
Sep 19, 2022 · Apt 2M
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1k, 1st story, 3rd apartment from east at south
Sep 19, 2022 · Apt 1K
Closed — Violation dismissed
DOB building violations · 21
- Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 21, 2023
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2011
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
Show 11 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Elevator elevatorrequired
(18)3rd floor lock roller.(35)hoistway guard.(40)pin in governor
May 31, 1990
Dob violation - resolved - Elevator elevatorrequired
(01) properly fuse controller (03) provide guard for same on car door (34) properly align same (35)provide covers for same (36) 1st fl where necessary (34)adjust car door timer (21)uncross same on cwt side (51)repair cab floor covering (52)file and obtain a permit from this dept for addition to work of cab (53)provide a capacity plate in cab
Jun 29, 1989
Dob violation - resolved - Elevator elevatorrequired
51).file a bn basement.cutof.switch and new lobby door 52) replay drive sheave and file a bn
Sep 29, 1988
Dob violation - resolved
ECB violations · 6
- Class - 2
Failure to maintain bldg wall(s)or appurtenances.the air conditioner @the seconfd fl has wood underneath it, & the a/c unit @ the 1st fl hasbricks underneath it.rem:maintain exterior bldg wall.install a/c units
Jun 24, 2014 · Penalty $250
Resolve - Non-hazardous
16d06/38o02/66o02/84o02. (16-d-06) hoisting door top pivots are loose,repair as needed. (84-o-02) overhead wheelhouse is dirty.
Feb 1, 2006
Resolve - Non-hazardous
31q,32d,14m,08j,57o,74h, 31-throughout 74-adjust steady plates (car shakes)
Apr 20, 1998
Resolve - Non-hazardous
37g,37r. 37 reroute wires on front of controller.
Sep 13, 1993 · Penalty $100
Resolve - Non-hazardous
25l,11q,17m,18o, (#25) eliminate excessive noise and properly align (#17) replace missing vision panel gaurd
May 7, 1992 · Penalty $150
Resolve - Non-hazardous
18m,14m,11m,05m,25l,73#,#(18)all covers. #(11)light guard. #(05)grill guard. #(25)eliminate excessive noise&align car door. #(73)5yr test,properly tag gov&file elv3
Jun 21, 1991 · Penalty $75
Resolve
Complaints
- General
Cooking gas
Aug 18, 2026 · Apt L2
Close - Paint/plaster
Ceiling
Jul 18, 2026 · Apt L2
Close - Water leak
Heavy flow
Jul 18, 2026 · Apt L2
Close - Appliance
Electric/gas range
Jul 18, 2026 · Apt L2
Close - General
Cooking gas
Jun 15, 2026 · Apt 3K
Close - General
Cooking gas
Jun 4, 2026 · Apt 3Q
Close - Heat/hot water
Apartment only
Dec 21, 2025 · Apt 6L
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt L6
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 23, 2025 · Apt L6
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 14, 2025 · Apt L6
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt L6
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 6L
Close - Unsanitary condition
Pests
Apr 8, 2025 · Apt 5R
Close - Safety
Carbon monoxide detector
Apr 8, 2025 · Apt 5R
Close - Unsanitary condition
Pests
Apr 8, 2025 · Apt 5R
Close - Unsanitary condition
Pests
Oct 4, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2024 · Apt 6N
Close - Appliance
Electric/gas range
Mar 28, 2024 · Apt 6N
Close - Appliance
Electric/gas range
Mar 28, 2024 · Apt 6N
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2023 · Apt 4J
Close - Heat/hot water
Apartment only
Nov 16, 2021 · Apt 6Q
Close - Electric
Wiring
Nov 16, 2021 · Apt 6Q
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 30, 2020 · Apt 6Q
Close - Heat/hot water
Apartment only
Oct 20, 2019 · Apt L6
Close - Heat/hot water
Apartment only
Mar 31, 2019 · Apt 6L
Close - Heat/hot water
Entire building
Oct 29, 2018 · Apt L6
Close - Heat/hot water
Apartment only
Oct 29, 2018 · Apt L6
Close - Heat/hot water
Apartment only
Oct 18, 2018 · Apt L6
Close - Door/window
Door frame
Mar 28, 2018 · Apt 6Q
Close - Safety
Smoke detector
Mar 28, 2018 · Apt 6Q
Close - Unsanitary condition
Mold
Mar 28, 2018 · Apt 6Q
Close - Electric
Wiring
Mar 28, 2018 · Apt 6Q
Close - Paint/plaster
Ceiling
Mar 28, 2018 · Apt 6Q
Close - Appliance
Refrigerator
Mar 22, 2018 · Apt 6Q
Close - General
Cabinet
Mar 22, 2018 · Apt 6Q
Close - Paint/plaster
Ceiling
Mar 22, 2018 · Apt 6Q
Close - Paint/plaster
Ceiling
Mar 22, 2018 · Apt 6Q
Close - Flooring/stairs
Floor
Mar 22, 2018 · Apt 6Q
Close - Flooring/stairs
Floor
Mar 22, 2018 · Apt 6Q
Close - Water leak
Heavy flow
Mar 22, 2018 · Apt 6Q
Close - Plumbing
Bathtub/shower
Sep 28, 2016 · Apt 1K
Close - Unsanitary condition
Pests
Sep 28, 2016 · Apt 1K
Close - Unsanitary condition
Pests
Sep 28, 2016 · Apt 1K
Close - Flooring/stairs
Floor
Sep 28, 2016 · Apt 1K
Close - Door/window
Window pane
Sep 28, 2016 · Apt 1K
Close - Heat/hot water
Apartment only
May 3, 2016 · Apt 3M
Close - Unsanitary condition
Mold
Mar 23, 2016 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1928
- Floors
- 6
- Residential units
- 54
- Building area
- 53,394 ft²
- Lot area
- 11,500 ft²
- Zoning
- R7-1
- Community board
- 403
- Council district
- 25
- Block / lot
- 1450 / 32
- Assessed value
- $2,113,650
- Landmark / historic district
- No
HPD registration #402020, last renewed Jul 23, 2026.
Questions about 34-58 90 Street
Who owns 34-58 90 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jackson Heights Plz C.
Does 34-58 90 Street have violations?
Yes. NYC HPD has recorded 150 housing violations at this property.
Is 34-58 90 Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 26% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 34-58 90 Street built?
City records list 1928 as the year it was built.
How many apartments are in 34-58 90 Street?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.