roofy

34-58 90 Street

Queens, NY 11372BBL 4-01450-0032Map

Owner of record: Jackson Heights Plz C

34-58 90 Street is an elevator apartment building built in 1928 in Queens, 11372. It has 54 residential units across 6 floors. The owner of record is Jackson Heights Plz C. HPD has recorded 150 housing violations here, most recently on August 21, 2026. 29 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.

HPD violations
150
DOB violations
21
ECB violations
6
HPD complaints
111

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
14
About 26% of the building's 54 apartments
Down from 16 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 150

  • C

    Remove the illegal fastening consisting of key operated double cylinder lock installed at metal gate, 1st from north at building front yard

    Aug 21, 2026

    Open — Nov certified on time
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 21, 2026

    Open — Nov certified on time
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt m1, 1st story, 3rd apartment from south at west

    Jul 19, 2026 · Apt M1

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling in the bathroom located at apt l2, 2nd story, 1st apartment from north at east

    Jul 19, 2026 · Apt L2

    Open — Invalid certification
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt l2, 2nd story, 1st apartment from north at east

    Jul 19, 2026 · Apt L2

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 19, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Jul 19, 2026

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jul 19, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jul 19, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jul 19, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt l6, 6th story, 1st apartment from west at north

    Dec 6, 2025 · Apt L6

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt l6, 6th story, 1st apartment from west at north

    Dec 6, 2025 · Apt L6

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and north wall in the bathroom located at apt l6, 6th story, 1st apartment from west at north original violation 18489202 issued 06-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Dec 6, 2025 · Apt L6

    Open — First no access to re- inspect violation
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story

    Dec 6, 2025

    Open — Nov sent out
  • C

    Remove the illegal fastening unacceptable electromagnetic locking device installed at vestibule door , 1st story

    Dec 6, 2025

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door , 1st story

    Dec 6, 2025

    Open — Nov sent out
  • C

    Remove the illegal fastening unacceptable electromagnetic locking device installed at building entrance door , 1st story

    Dec 6, 2025

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and north wall in the bathroom located at apt l6, 6th story, 1st apartment from west at north

    Dec 6, 2025 · Apt L6

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 2nd fire door from east at public hall, 5th story

    Jun 21, 2025

    Closed — Violation closed
  • B

    Provide security in the event of a power failure by means of an accepatable mechanical heavy duty lock and latch set at building entrance door , 1st story

    Jun 21, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 3rd fire door from east at public hall, 5th story

    Jun 21, 2025

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story

    Jun 21, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jun 21, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 1st room from north at east located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • A

    Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • A

    Paint metal in accordance with dept. regulation at 1st door from east at south wall in the foyer located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment denied
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door from south at west wall, 1st door frame from south at west wall, south wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, 1st window frame from north at east wall in the 2nd room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall in the kitchen located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 4th room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt 5r, 5th story, 2nd apartment from west at north , section ''east''

    Apr 8, 2025 · Apt 5R

    Open — First no access to re- inspect violation
  • C

    Remove device preventing door from being self-closing consisting of metal weight at fire door leading to north yard, east section at public hall

    Oct 5, 2024

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of large concrete block at fire door leading to north yard, west section at public hall

    Oct 5, 2024

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Mar 31, 2024

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder lock at lot line gate

    Aug 17, 2023

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1k, 1st story, 3rd apartment from east at south

    Sep 19, 2022 · Apt 1K

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches located at apt 2m, 2nd story, 3rd apartment from west at north

    Sep 19, 2022 · Apt 2M

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1k, 1st story, 3rd apartment from east at south

    Sep 19, 2022 · Apt 1K

    Closed — Violation dismissed

DOB building violations · 21

  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    Feb 21, 2023

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 21, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 22, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 17, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2011

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
Show 11 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 10, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 8, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 17, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 11, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 21, 2004

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 7, 2004

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    (18)3rd floor lock roller.(35)hoistway guard.(40)pin in governor

    May 31, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (01) properly fuse controller (03) provide guard for same on car door (34) properly align same (35)provide covers for same (36) 1st fl where necessary (34)adjust car door timer (21)uncross same on cwt side (51)repair cab floor covering (52)file and obtain a permit from this dept for addition to work of cab (53)provide a capacity plate in cab

    Jun 29, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    51).file a bn basement.cutof.switch and new lobby door 52) replay drive sheave and file a bn

    Sep 29, 1988

    Dob violation - resolved

ECB violations · 6

  • Class - 2

    Failure to maintain bldg wall(s)or appurtenances.the air conditioner @the seconfd fl has wood underneath it, & the a/c unit @ the 1st fl hasbricks underneath it.rem:maintain exterior bldg wall.install a/c units

    Jun 24, 2014 · Penalty $250

    Resolve
  • Non-hazardous

    16d06/38o02/66o02/84o02. (16-d-06) hoisting door top pivots are loose,repair as needed. (84-o-02) overhead wheelhouse is dirty.

    Feb 1, 2006

    Resolve
  • Non-hazardous

    31q,32d,14m,08j,57o,74h, 31-throughout 74-adjust steady plates (car shakes)

    Apr 20, 1998

    Resolve
  • Non-hazardous

    37g,37r. 37 reroute wires on front of controller.

    Sep 13, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    25l,11q,17m,18o, (#25) eliminate excessive noise and properly align (#17) replace missing vision panel gaurd

    May 7, 1992 · Penalty $150

    Resolve
  • Non-hazardous

    18m,14m,11m,05m,25l,73#,#(18)all covers. #(11)light guard. #(05)grill guard. #(25)eliminate excessive noise&align car door. #(73)5yr test,properly tag gov&file elv3

    Jun 21, 1991 · Penalty $75

    Resolve

Complaints

  • General

    Cooking gas

    Aug 18, 2026 · Apt L2

    Close
  • Paint/plaster

    Ceiling

    Jul 18, 2026 · Apt L2

    Close
  • Water leak

    Heavy flow

    Jul 18, 2026 · Apt L2

    Close
  • Appliance

    Electric/gas range

    Jul 18, 2026 · Apt L2

    Close
  • General

    Cooking gas

    Jun 15, 2026 · Apt 3K

    Close
  • General

    Cooking gas

    Jun 4, 2026 · Apt 3Q

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2025 · Apt 6L

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2025 · Apt L6

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2025 · Apt L6

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 14, 2025 · Apt L6

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2025 · Apt L6

    Close
  • Heat/hot water

    Apartment only

    Nov 6, 2025 · Apt 6L

    Close
  • Unsanitary condition

    Pests

    Apr 8, 2025 · Apt 5R

    Close
  • Safety

    Carbon monoxide detector

    Apr 8, 2025 · Apt 5R

    Close
  • Unsanitary condition

    Pests

    Apr 8, 2025 · Apt 5R

    Close
  • Unsanitary condition

    Pests

    Oct 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2024 · Apt 6N

    Close
  • Appliance

    Electric/gas range

    Mar 28, 2024 · Apt 6N

    Close
  • Appliance

    Electric/gas range

    Mar 28, 2024 · Apt 6N

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2023 · Apt 4J

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2021 · Apt 6Q

    Close
  • Electric

    Wiring

    Nov 16, 2021 · Apt 6Q

    Close
  • Heat/hot water

    Entire building

    Oct 30, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 30, 2020 · Apt 6Q

    Close
  • Heat/hot water

    Apartment only

    Oct 20, 2019 · Apt L6

    Close
  • Heat/hot water

    Apartment only

    Mar 31, 2019 · Apt 6L

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2018 · Apt L6

    Close
  • Heat/hot water

    Apartment only

    Oct 29, 2018 · Apt L6

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2018 · Apt L6

    Close
  • Door/window

    Door frame

    Mar 28, 2018 · Apt 6Q

    Close
  • Safety

    Smoke detector

    Mar 28, 2018 · Apt 6Q

    Close
  • Unsanitary condition

    Mold

    Mar 28, 2018 · Apt 6Q

    Close
  • Electric

    Wiring

    Mar 28, 2018 · Apt 6Q

    Close
  • Paint/plaster

    Ceiling

    Mar 28, 2018 · Apt 6Q

    Close
  • Appliance

    Refrigerator

    Mar 22, 2018 · Apt 6Q

    Close
  • General

    Cabinet

    Mar 22, 2018 · Apt 6Q

    Close
  • Paint/plaster

    Ceiling

    Mar 22, 2018 · Apt 6Q

    Close
  • Paint/plaster

    Ceiling

    Mar 22, 2018 · Apt 6Q

    Close
  • Flooring/stairs

    Floor

    Mar 22, 2018 · Apt 6Q

    Close
  • Flooring/stairs

    Floor

    Mar 22, 2018 · Apt 6Q

    Close
  • Water leak

    Heavy flow

    Mar 22, 2018 · Apt 6Q

    Close
  • Plumbing

    Bathtub/shower

    Sep 28, 2016 · Apt 1K

    Close
  • Unsanitary condition

    Pests

    Sep 28, 2016 · Apt 1K

    Close
  • Unsanitary condition

    Pests

    Sep 28, 2016 · Apt 1K

    Close
  • Flooring/stairs

    Floor

    Sep 28, 2016 · Apt 1K

    Close
  • Door/window

    Window pane

    Sep 28, 2016 · Apt 1K

    Close
  • Heat/hot water

    Apartment only

    May 3, 2016 · Apt 3M

    Close
  • Unsanitary condition

    Mold

    Mar 23, 2016 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1928
Floors
6
Residential units
54
Building area
53,394 ft²
Lot area
11,500 ft²
Zoning
R7-1
Community board
403
Council district
25
Block / lot
1450 / 32
Assessed value
$2,113,650
Landmark / historic district
No

HPD registration #402020, last renewed Jul 23, 2026.

Questions about 34-58 90 Street

Who owns 34-58 90 Street?

The owner of record in NYC Department of City Planning PLUTO data is Jackson Heights Plz C.

Does 34-58 90 Street have violations?

Yes. NYC HPD has recorded 150 housing violations at this property.

Is 34-58 90 Street rent stabilized?

NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 26% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 34-58 90 Street built?

City records list 1928 as the year it was built.

How many apartments are in 34-58 90 Street?

It has 54 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.