43-15 52nd Street
Queens, NY 11377BBL 4-01321-0016Map
Owner of record: Zdj Woodside 52 LLC
43-15 52nd Street is an elevator apartment building built in 2022 in Queens, 11377. It has 87 residential units across 9 floors. The owner of record is Zdj Woodside 52 LLC. HPD has recorded 23 housing violations here, most recently on February 3, 2026. 2 of the 23 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 23
- DOB violations
- 1
- ECB violations
- 34
- HPD complaints
- 4
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 23
- CImmediately hazardous
Remove the illegal fastening consisting of a double cylinder lock installed on vestibule door at public hall, 1st story
Feb 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges vestibule to public hall , 1st story
Aug 26, 2025
Open — Violation will be reinspected - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kickdown door stopper installed on vestibule door to public hall , 1st story
Feb 13, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed on building entrance door , 1st story
Feb 13, 2025
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set on building entrance door , 1st story
Feb 13, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Feb 13, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Feb 13, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Feb 13, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box, 1st story
Feb 13, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Feb 13, 2025
Closed — Violation closed
Show 13 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Feb 13, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on 1st door from west at north leading to gym at public hall, 1st story
Feb 13, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kickdown door stopper installed on 1st door from west at north leading to gym at public hall, 1st story
Feb 13, 2025
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures - kitchen and bathroom 1st family dwelling
Jun 16, 2003
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures - gas range cellar kitchen
Jun 16, 2003
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of - electricity not provided cellar 1 and 2 sty. all rooms and halls
Jun 16, 2003
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color - walls and ceilings 1st sty. and 2nd sty. all rooms
Jun 16, 2003
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures -kitchen and bathroom 1 st family dwelling
May 26, 2003
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures - boiler and hot water heater cellar boiler room
May 26, 2003
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish and water cellar throughout
May 26, 2003
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the -sewage water cellar front
May 26, 2003
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the - cellar throughout
May 26, 2003
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for - for building
May 26, 2003
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Ftm exterior bldg facade and appurtenances. at time of inspection observed defected facade consisting of deteriorated mortar joints damage lintels and cracks at bricks at exp #1 and exp #2. remedy: maintain exterior bldg facade and appurtenances as per 1 rcny 103-04
Jun 24, 2021
Dob violation - dismissed
ECB violations · 34
- Class - 1
In stairwell marked "a" exit door to street does not open., remove obstruction
Jan 3, 2025 · Penalty $625
Resolve - Class - 1
Upon approach to building observed workers on balcony with inadequate use of fall arrest system due to worker on ladder with anchor point on floor, upon entering the upper floors, numerous doors were open givin
Jun 30, 2023 · Penalty $2,500
Resolve - Class - 1
Observed the red light on the sidewalk shed indicating the fdny connection, upon approaching the area, observed a red dumpster approx 15ft blocking access to the standpipe connection required for fdny in case o
Jun 30, 2023 · Penalty $625
Resolve - Class - 2
Upon re-entering the site observed the comp. person filling in c.s. log book upon reviewing the c.s. log book, last entry was 6/26/2023, site was missing guardrails throughout exposure 1 setbacks and balconies,
Jun 30, 2023 · Penalty $2,500
Resolve - Class - 1
I observed a approx. 70ft pipe scaffold installed on top of a sidewalk shed at expos 1. after requesting to see a loads imposed letter for the install stored material on top of the shed none was provided, also
Apr 22, 2023 · Penalty $1,250
Resolve - Class - 2
I observed pipe scaffold installed on setbacks & roof on the 7th,8th, & 9th floor built in an unsafe manner. missing and inadequate guardrails & toe boards. missing stacking pins, not fully planked, scaffold co
Apr 22, 2023
Resolve - Class - 1
Per section 3314.16.4 equipment setting for corner and angle scaffolds must be inspected by the department before use, additional inspection is required each time the equipment is moved to a different position.
Apr 22, 2023
Resolve - Class - 1
At the time of my inspection of a active 9 story nb i observed supported scaffold approx. 70ft high installed at exposure 1. after reviewing dob records no permit was found. for scaffold 40ft plus in height a d
Apr 22, 2023 · Penalty $625
Resolve - Class - 2
During an inspection, it was observed that hanging scaffolds were being used without proper notification to the dob as required by section 3314.4.3.3 and section 3314.8.2.1. so the scaffolds were installed with
Apr 22, 2023
Resolve - Class - 2
Observed no control access zone for all balconies which all doors were unlocked, some open and easily accessible to workers. in violation of section 3301.2 contractors, construction managers, and subcontractors
Apr 22, 2023
Resolve
Show 24 more ↓
- Class - 1
Multiple violations found on site, scaffold without a permit, missing documentation, improper installation, damaged components, no notification for hanging scaffold installation/removal, and storage violation.
Apr 22, 2023 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.conducted inspection on building and found that sidewalk shed permit has expired.rem:renew permit.
Apr 4, 2023 · Penalty $3,125
Resolve - Class - 1
Failure to institute safety equipment measures or temporary construction.no guardrails:as noted:at time of inspection at an active jobsite for a proposed 9 story building at the bulkhead level.observed on sever
Jan 26, 2023 · Penalty $2,500
Resolve - Class - 1
Atoi i observed a 9 story new building. jobsite is active. during my inspection i observed vertical netting and guardrails not maintain at exposure 1/3 floors 2 through 8. vertical netting cables were loose and
Jan 12, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection on an active job site, i observed inadequate housekeeping on site from the 8th fl to rooftop level which of garbage, construction debris creating a safety hazard on site.
Jan 9, 2023
Resolve - Class - 1
At time of inspection on an active job site of a 9 story building, i observed above 75ft that the standpipe was not in readiness, also not painted red on the 8th fl level as required by code. failure to comply
Jan 9, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection on an active job site, i observed that permit holder failed to provide and maintain fire extinguishers as per code as none was seen provided on site from the 6th fl to rooftop level.provid
Jan 9, 2023 · Penalty $625
Resolve - Class - 2
Failure to maintain/dispaly onsite documents required by bc chapter 33as noted at time of inspection on an active construction site,observedrepairs been done on stairwell shearwalls and exp2 foundation walls ne
Nov 25, 2022
Resolve - Class - 1
Fall protection&guardrails i observed active 9st nb, currently at 4fl. inadequate guardrails on 2fl at exp3, no caz, 1 worker on 4fl shaft not using personal fall arrest system(pfas) only positioning devices. h
Oct 15, 2022 · Penalty $2,500
Resolve - Class - 1
@9 story new building site i observe active 4th floor concrete pour and workers within immediate vicinity of exposure#4 with no guardrail system in place nor fall protection safety measures to protect the worke
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 2
@9 story nb site i observe active 4th fl concrete pour operations and no concrete washout containment measures in place to code bc3303.15 with concrete washout water entering sewer at end of block creating clog
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to provide/maintain pedestrian walkway bc3307.2.6.@9story nb site observe active 4th floor concrete pour operations and pedestrian pathway+temporary ramp @sidewalk not provided/maintained minimum 5ft cl
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 2
Sidewalk shed lighting bc3307.6.4.8.@9story active nb site up to 4th floor i observe sidewalk shed protection in place for exposure#2 property and the shed's underside pathway dark and not illuminated by day li
Oct 14, 2022 · Penalty $2,400
Resolve - Class - 1
Fail to provide/maintain temporary lighting for construction site bc3303.2.3.1@ 9 story nb site i observe no lighting for the dark stairs with trip hazards to access into cellar floor to code bc3303.11(3) and a
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 1
Failed to comply container to code bc3303.4.2. @9story active nb site i observe debris container on roadway completely filled and over the top and not covered to code bc3303.4.2+bc3303.4.7 exceptions to protect
Oct 14, 2022 · Penalty $625
Resolve - Class - 1
Failure to provide barriers for work or storage zone bc3307.4.7. @9 story new building site i observe active 4th floor concrete pour operations with construction related equipments on roadway adjacent to sidewa
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 2
Site safety plan (ssp) does not indicate the unprotected power lines 3 feet away of the working deck/3rd floor balcony above the sws. working deck is being supported by steel posts/ temporary shoring. also, tra
Sep 1, 2022
Resolve - Class - 2
On an active jobsite of 9 sty nb at 3rd fl working deck,observed temporary shoring installed at all floors to support the newly poured slabs and working deck.shoring posts are 13 ft and 25 ft in height consisti
Sep 1, 2022 · Penalty $625
Resolve - Class - 2
At time of inspection on an active jobsite, observed work being done at exp#2, rebar and formwork installation at second floor. adjacent property had an entrance way and a driveway directly beneath work area at
Jul 28, 2022 · Penalty $2,400
Resolve - Class - 2
At the time of my inspection, i observed the sidewalk shed at exposure 1 had several conditions that posed a major hazard to pedestrian safety. sws missing parapet wall and decking. code stipulates that sidewal
Jul 28, 2022 · Penalty $2,400
Resolve - Class - 2
1. sws at all exps not indicated or contrary to that shown on the ssp 2. inadequate guard-rails installations in various locations contrary to that shown on the ssp. 3. movable barricades w/ chain linked fence
Jul 28, 2022
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.at time of inspection of active excavation & soe job site observed large pile of accumulated & combustible debris next to storage shed made of
May 16, 2022 · Penalty $625
Resolve - Class - 1
Work contrary to sife safety plan.at time of inspection at active support of excavation job site observed site safety plans shows & states to provide 2 flaggers on sidewalk when deliveries are taking place obse
May 16, 2022
Resolve - Class - 1
Bc3301.1 fire code - fire extinguishers hot works permit and fire watch not provided while welding operations taking place.at time of inspection of active excavation job site observed through viewing panel work
May 16, 2022 · Penalty $625
Resolve
Complaints
- Appliance
Refrigerator
Jun 24, 2026 · Apt 5G
Close - Door/window
Door
Feb 15, 2026 · Apt BLDG
Close - Door/window
Door to dumbwaiter
May 7, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Feb 11, 2025 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2022
- Floors
- 9
- Residential units
- 87
- Building area
- 89,752 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7A
- Community board
- 402
- Council district
- 26
- Block / lot
- 1321 / 16
- Assessed value
- $7,664,850
- Landmark / historic district
- No
HPD registration #434258, last renewed Jun 17, 2025.
Questions about 43-15 52nd Street
Who owns 43-15 52nd Street?
The owner of record in NYC Department of City Planning PLUTO data is Zdj Woodside 52 LLC.
Does 43-15 52nd Street have violations?
Yes. NYC HPD has recorded 23 housing violations at this property.
Is 43-15 52nd Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 28% of its 87 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 43-15 52nd Street built?
City records list 2022 as the year it was built.
How many apartments are in 43-15 52nd Street?
It has 87 residential units and 88 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.