41-24 52 Street
Queens, NY 11377BBL 4-01314-0035Map
Owner of record: 41-24 Associates, LLC
41-24 52 Street is a walk-up apartment building built in 1928 in Queens, 11377. It has 6 residential units across 3 floors. The owner of record is 41-24 Associates, LLC. HPD has recorded 130 housing violations here, most recently on May 6, 2026. 32 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 130
- DOB violations
- 14
- ECB violations
- 2
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at vestibule , 1st story
Jun 18, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building entrance , 1st story
Jun 18, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 2nd room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, south wall in the 3rd room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective woof floor in the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl . in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jun 18, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lockset at vestibule door at public hall, 1st story
Jun 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective repair the vestibule door at public hall, 1st story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 7, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at the 1st story public hall
Aug 7, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 7, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 7, 2022
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at the 1st story public hall
Aug 7, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Aug 7, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at the 1st story public hall
Aug 7, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of shoes, stroller, flower pots and table at public hall, 3rd story
Aug 7, 2022
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3l, 3rd story, 1st apartment from east at south
Aug 7, 2022 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak .. 1st closet from east at south wall ceiling in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. north wall, 1st closet from east at south wall ceiling, 1st closet from east at south wall wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Open — Nov certified late - BHazardous
Properly repair the broken or defective counterbalances at lower sash at 2nd wndow from south at west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of sinkbase cabinet and wall cabiinets in front of fire escpe window blocking secondary egress in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
May 27, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
May 25, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
May 25, 2022 · Apt 3R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3l, 3rd story, apartment at south
Dec 10, 2020 · Apt 3L
Open — Nov certified late - ANon-hazardous
Refit vestibule door , 1st story
Dec 10, 2020
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening double cylinder lock at building entrance door , 1st story
Dec 10, 2020
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3l, 3rd story, apartment at south
Dec 10, 2020 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment located at apt 3l, 3rd story, apartment at south
Dec 10, 2020 · Apt 3L
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 23, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 1, 2017
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active
ECB violations · 2
- Hazardous
Occupancy contrary to department of building records. from a legal 6 family dwelling to an ilelgal 7 family with 5 single room occupancy. illegal occpuancy noted at 1st, 2nd and 3rd floors. each apartment
Jul 11, 1998
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. building dept records indicate residence legall approved for 6 families now altered for occupancy by 7 family
Jul 11, 1998 · Penalty $800
Active
Complaints
- Plumbing
Toilet
Jun 14, 2024 · Apt 1R
Close - Flooring/stairs
Floor
Jun 14, 2024 · Apt 1R
Close - Electric
No lighting
Jun 3, 2024 · Apt 1R
Close - Safety
Window guard broken/missing
May 20, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 7, 2020 · Apt 3L
Close - Door/window
Window frame
Jun 22, 2017 · Apt 3R
Close - Safety
Carbon monoxide detector
Jun 22, 2017 · Apt 2R
Close - Electric
Outlet/switch
Jun 22, 2017 · Apt 3R
Close - Safety
Carbon monoxide detector
Jun 22, 2017 · Apt 2R
Close - Safety
Smoke detector
Jun 22, 2017 · Apt 2R
Close
Show 25 more ↓
- Safety
Window guard broken/missing
Jun 22, 2017 · Apt 2R
Close - Flooring/stairs
Floor
Jun 22, 2017 · Apt 2R
Close - Unsanitary condition
Mold
Jun 22, 2017 · Apt 2R
Close - Safety
Fire escape
Jun 22, 2017 · Apt 2R
Close - Safety
Carbon monoxide detector
Jun 22, 2017 · Apt 3L
Close - Safety
Smoke detector
Jun 22, 2017 · Apt 3L
Close - Unsanitary condition
Mold
Jun 22, 2017 · Apt 3L
Close - Plumbing
Bathtub/shower
Jun 22, 2017 · Apt 3L
Close - Door/window
Window frame
Jun 22, 2017 · Apt 3R
Close - Flooring/stairs
Floor
Jun 22, 2017 · Apt 2R
Close - Paint/plaster
Wall
Jun 22, 2017 · Apt 3R
Close - Outside building
Pavement
Jun 22, 2017 · Apt 3R
Close - Flooring/stairs
Stairs
Jun 22, 2017 · Apt 3R
Close - Flooring/stairs
Floor
Jun 22, 2017 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2017 · Apt 3R
Close - Paint/plaster
Ceiling
Jun 22, 2017 · Apt 3R
Close - Outside building
Roof door/hatch
Jun 22, 2017 · Apt 3R
Close - Safety
Smoke detector
Jun 22, 2017 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2017 · Apt 3R
Close - Plumbing
Bathtub/shower
Jun 22, 2017 · Apt 2R
Close - Safety
Carbon monoxide detector
Sep 22, 2014 · Apt 3L
Close - Safety
Smoke detector
Sep 22, 2014 · Apt 3L
Close - Nonconst
Carbon monoxide
Sep 18, 2012 · Apt 1L
Close - Nonconst
Smoke detector
Sep 18, 2012 · Apt 1L
Close - Plumbing
Bathtub/shower
Oct 20, 2009 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 6
- Building area
- 5,508 ft²
- Lot area
- 2,700 ft²
- Zoning
- R5D
- Community board
- 402
- Council district
- 26
- Block / lot
- 1314 / 35
- Assessed value
- $551,250
- Landmark / historic district
- No
HPD registration #407557, last renewed Sep 2, 2025.
Questions about 41-24 52 Street
Who owns 41-24 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 41-24 Associates, LLC.
Does 41-24 52 Street have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 41-24 52 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 41-24 52 Street built?
City records list 1928 as the year it was built.
How many apartments are in 41-24 52 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.