40-20 74 Street
Queens, NY 11373BBL 4-01305-0038Map
Owner of record: Shang Qi Lin
40-20 74 Street is a walk-up apartment building built in 2004 in Queens, 11373. It has 3 residential units across 3 floors. The owner of record is Shang Qi Lin. HPD has recorded 98 housing violations here, most recently on September 21, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 98
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 31
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 98
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the 5th bathroom from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th bathroom from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing
Sep 21, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 21, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tile at south window stool in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective regrout tiles at west wall in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 3rd story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall stairs, 3rd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall stairs, 3rd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of table at public hall stairs, 3rd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east at north located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Refit sliding window at south wall in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Refit closet doors at west wall in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective regrout tile at east, south and north wall in the 5th bathroom from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove the illegal fastening double cylinder lock installed at iron metal gate from street to building
Sep 21, 2026
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective street entrance door hinges to building
Sep 21, 2026
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of hasp and eye capable of being padlock installed at door in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of hasp and eye capable of being padlock installed at door in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective outter glass pane cracked at east wall window in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling at closet in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of hasp and eye capable of being padlock installed at door in the 2nd room from east at north located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from east at north located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective lower base cabinet door in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose sink in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Sep 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 3floor, 3rd story, 1st apartment from west at north
Sep 13, 2026 · Apt 3FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3floor, 3rd story, 1st apartment from west at north
Sep 13, 2026 · Apt 3FLOOR
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Hazardous
Illegal conversion.work without permit.upon inspection at the above property basement was converted to dental office.doctor's office on 1st floor,no access to 3rd floor.dept. record shows no permit issued.remed
Jun 11, 2004
Resolve - Hazardous
Failure to post d.o.t permit for storage of construction equipment in street. above job site has construction equipment (bricks/concrete) stored on street, not in enclosed job site. remedy: provide d.o.t permi
Dec 10, 2003 · Penalty $400
Resolve
Complaints
- Water leak
Slow leak
Sep 10, 2026 · Apt 3
Open - Unsanitary condition
Mold
Sep 10, 2026 · Apt 3
Open - Electric
Lighting
Sep 10, 2026 · Apt 3
Open - Plumbing
Basin/sink
Sep 10, 2026 · Apt 3
Open - Flooring/stairs
Stairs
Sep 10, 2026 · Apt 3
Open - General
Tenant harassment
Sep 10, 2026 · Apt 3
Open - Water leak
Heavy flow
Sep 3, 2026 · Apt 3FLOOR
Close - Paint/plaster
Ceiling
Sep 3, 2026 · Apt 3FLOOR
Close - Door/window
Door frame
Sep 3, 2026 · Apt 3FLOOR
Close - Electric
Lighting
Sep 3, 2026 · Apt 3FLOOR
Close
Show 21 more ↓
- Door/window
Door
Sep 3, 2026 · Apt 3FLOOR
Close - Door/window
Door
Sep 3, 2026 · Apt 3FLOOR
Close - Plumbing
Basin/sink
Sep 3, 2026 · Apt 3FLOOR
Close - Paint/plaster
Cabinet
Sep 3, 2026 · Apt 3FLOOR
Close - Unsanitary condition
Mold
Sep 3, 2026 · Apt 3FLOOR
Close - Unsanitary condition
Pests
Feb 12, 2019 · Apt GF
Close - Unsanitary condition
Sewage
Feb 12, 2019 · Apt GF
Close - Unsanitary condition
Sewage
Feb 12, 2019 · Apt GF
Close - Appliance
Refrigerator
Feb 12, 2019 · Apt GF
Close - Appliance
Electric/gas range
Feb 12, 2019 · Apt GF
Close - Door/window
Door
Aug 25, 2018 · Apt 1STFL
Close - Safety
Smoke detector
Aug 25, 2018 · Apt 1STFL
Close - Unsanitary condition
Pests
Aug 25, 2018 · Apt 1STFL
Close - General
Ventilation system
Aug 25, 2018 · Apt 1STFL
Close - Plumbing
Water supply
Jan 12, 2018 · Apt 2FLOO
Close - Appliance
Electric/gas range
Feb 8, 2017 · Apt 1
Close - Door/window
Door
Feb 8, 2017 · Apt 1
Close - Paint/plaster
Wall
Feb 8, 2017 · Apt 1
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt 1
Close - Nonconst
Vermin
Dec 7, 2006 · Apt 2FL
Close - Heating
Heat related
Dec 7, 2006 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2004
- Floors
- 3
- Residential units
- 3
- Building area
- 3,750 ft²
- Lot area
- 1,900 ft²
- Zoning
- R5
- Community board
- 404
- Council district
- 25
- Block / lot
- 1305 / 38
- Assessed value
- $123,660
- Landmark / historic district
- No
HPD registration #427506, last renewed Nov 17, 2025.
Questions about 40-20 74 Street
Who owns 40-20 74 Street?
The owner of record in NYC Department of City Planning PLUTO data is Shang Qi Lin.
Does 40-20 74 Street have violations?
Yes. NYC HPD has recorded 98 housing violations at this property.
Is 40-20 74 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40-20 74 Street built?
City records list 2004 as the year it was built.
How many apartments are in 40-20 74 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.