78-13 31 Avenue
Queens, NY 11370BBL 4-01127-0040Map
Owner of record: 31 Enterprises Group LLC
78-13 31 Avenue is a walk-up apartment building built in 2004 in Queens, 11370. It has 19 residential units across 3 floors. The owner of record is 31 Enterprises Group LLC. HPD has recorded 65 housing violations here, most recently on May 29, 2026. 21 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 65
- DOB violations
- 7
- ECB violations
- 19
- HPD complaints
- 85
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f degrees at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10sq ft at south wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
May 29, 2026 · Apt 2R
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the floor, all stories at public hall
May 29, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
May 29, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
May 29, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
May 29, 2026
Open — Nov certified on time - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 29, 2026
Open — Nov certified on time - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10sq ft at south wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north original violation 18965085 issued 29-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 29, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 22, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at near mailbox at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 12, 2018
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall
Oct 16, 2017
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of iron bed frame, 1st story, at public hall
Oct 16, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color fire retardant material, at north wall, within sprinkler opening for test valve, 3rd story, at public hall
Oct 16, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ..1st story, at public hall
Oct 16, 2017
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 16, 2017
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Oct 16, 2017
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 16, 2017
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective craked and loose mortar ,west and east retaining walls, at ramp southwest section, front yard
Oct 16, 2017
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective zipper drain cover at, southwest section, front yard
Oct 16, 2017
Closed — Violation dismissed
DOB building violations · 7
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 19
- Class - 2
Created an illegal apt in cellar in rear, with full height partition walls creating rooms with doors, water and waste lines for kitchen with electric stove and 3 piece bathroom. electrical work throughout, obta
Feb 20, 2020 · Penalty $1,250
Active - Class - 2
Created an illegal apt in cellar in rear, with full height partition walls creating rooms with doors, water and waste lines for kitchen with electric stove and 3 piece bathroom. electrical work throughout, obta
Feb 20, 2020 · Penalty $1,250
Active - Class - 2
Cofo # 401944027f indicates legally approved for 5 apts, now converted to 6 apts. note. at cellar, a 2 bedroom, class 'a' apt with kitchen with electric stove and 3 pcs bathroom and open room., restore to prior
Feb 20, 2020 · Penalty $2,500
Active - Class - 2
Cofo # 401944036f indicates legally approved for 5 apts, now converted to 6 apts. note. at cellar, a 2 bedroom, class 'a' apt with kitchen with electric stove and 3 pcs bathroom and open room., restore to prior
Feb 20, 2020 · Penalty $2,500
Active - Class - 2
Work w/o a permit. at rear of home shed apprx 8'x24'with electric and plumbing. rmdy: provide proper permits.
Dec 17, 2015 · Penalty $800
Active - Hazardous
Failure to safeguard public and property affected by construction operations. n.b. is in progress and up to the roof- jobsite fence is missing for approx. 40' at front and construction site is open to public.
Jun 15, 2005
Resolve - Hazardous
Failure to do adequate house keeping at site. n.b. is in progress and up to the roof- approx.: 80 cu yard of construction debris accumulatedat site and no dumpster or container provided to keep the debris.
Jun 15, 2005
Resolve - Non-hazardous
Failure to provide contractor sign at construction site. new buildingsare in progress and up to roof sheet rock and plumbing works in progress on inspection. no contractor sign was posted at site. remedy: post
Jun 15, 2005
Resolve - Hazardous
No guard rails. new building is in progress and up to roof. no guard rails were provided at front garage ramp with sides of drop 8' and no guard rails provided at rear stairs drop 8'from 1st floor to basement
Jun 15, 2005
Resolve - Hazardous
Disobey the stop order stop order was issued to the above site inorder to protect the sides of excavation on 09/28/04 vide voil #34453075h, while excavation work was in progress. contractor continued the work d
Oct 18, 2004 · Penalty $500
Resolve
Show 9 more ↓
- Hazardous
Fence does not conform to code new bldgs were in progress with foundation & excavation at site, the condtruction fence at rear of site was only 6' high & position of fallen/ leaned & and defective. remedy: reap
Oct 18, 2004 · Penalty $500
Resolve - Non-hazardous
Failure to provide contractor sign new bldgs were in progress with new foundations. no contractor sign was posted at site. remedy: post contractor sign at site
Oct 18, 2004
Resolve - Non-hazardous
Failure to carry out permitted work in accordance with applicable laws and regulations in that construction activities are being performed after a weekdays between the hours of 7am and 6pm without a variance as
Oct 9, 2004
Resolve - Hazardous
Failure to provide protection at sides of excavation.note:excavation to a depth of more than five feet without any sheeting,shoring or bracing.remedy:stop all work!except to provide sheeting,shoring or bracing.
Oct 9, 2004 · Penalty $1,000
Resolve - Hazardous
Failure to provide protection at sides of excavation a large excavation approx 40'x 40'x 8-10 deep at site for new building foundation such as sheeting /shoring or any other method has been provided by contrato
Sep 28, 2004 · Penalty $1,000
Resolve - Hazardous
Failure to remove glass.on inspection of above premises,demolition of building at roof was in progress,there were window glasses still on building and contructor failed to remove glasses prior to demo commencem
Apr 29, 2004 · Penalty $500
Resolve - Hazardous
Permit not posted.on inspection of above premises demolition of building at roof was in progress.permits were not posted at site.remedy:post permits at site.
Apr 29, 2004 · Penalty $130
Resolve - Hazardous
Occupancy contrary to that allowed by certufucate of occupancy coq204590 auto repair shop is being operated without a valid certificate of occupancy cofo #204590 expired on 7/8/95 as per board of standard and a
Oct 3, 1998 · Penalty $400
Resolve - Non-hazardous
Occupancy contrary to building ept records co expired by bsa 7/8/95 remedy: disconinue illegal use or amend c of o.
Jun 4, 1997 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
May 27, 2026 · Apt APT2R
Open - Heat/hot water
Apartment only
May 27, 2026 · Apt APT2R
Open - Unsanitary condition
Pests
Oct 19, 2025 · Apt 2S
Close - Unsanitary condition
Pests
Oct 19, 2025 · Apt 2S
Close - General
Janitor/super
Oct 2, 2025 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Sep 18, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 18, 2025 · Apt 2F
Close - Appliance
Electric/gas range
Sep 18, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 18, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 18, 2025 · Apt 2F
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 4, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 4, 2025 · Apt 2F
Close - Appliance
Electric/gas range
Sep 4, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 4, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 4, 2025 · Apt 2F
Close - General
Mailbox
Sep 4, 2025 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2025 · Apt BLDG
Close - Door/window
Door
Aug 26, 2025 · Apt BLDG
Close - Safety
Window guard broken/missing
Aug 26, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 18, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 14, 2025 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Apr 9, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Apr 9, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Apr 9, 2025 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 12, 2025 · Apt 2F
Close - Electric
Wiring
Mar 12, 2025 · Apt 2F
Close - Plumbing
Bathtub/shower
Mar 12, 2025 · Apt 2F
Close - Electric
No lighting
Mar 12, 2025 · Apt 2F
Close - Electric
No lighting
Feb 25, 2025 · Apt 2F
Close - Water leak
Slow leak
Feb 25, 2025 · Apt 2F
Close - Electric
Wiring
Feb 25, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Feb 25, 2025 · Apt 2F
Close - Plumbing
Radiator
Feb 25, 2025 · Apt 2F
Close - Plumbing
Bathtub/shower
Jan 10, 2025 · Apt 2F
Close - Electric
No lighting
Jan 10, 2025 · Apt 2F
Close - Electric
Wiring
Jan 10, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Jan 10, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Sep 26, 2024 · Apt 2R
Close - Plumbing
Radiator
Sep 26, 2024 · Apt 2R
Close - Appliance
Refrigerator
Sep 26, 2024 · Apt 2R
Close - Paint/plaster
Wall
Sep 26, 2024 · Apt 2R
Close - Heat/hot water
Apartment only
Apr 18, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Apr 18, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Jan 17, 2024 · Apt 2R
Close - Appliance
Refrigerator
Jan 6, 2023 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jan 6, 2023 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Sep 13, 2022 · Apt 3R
Close - Plumbing
Toilet
Aug 26, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Aug 26, 2022 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2004
- Floors
- 3
- Residential units
- 19
- Building area
- 16,030 ft²
- Lot area
- 13,500 ft²
- Zoning
- R4
- Community board
- 403
- Council district
- 25
- Block / lot
- 1127 / 40
- Assessed value
- $717,300
- Landmark / historic district
- No
HPD registration #427106, last renewed Jul 10, 2025.
Questions about 78-13 31 Avenue
Who owns 78-13 31 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 31 Enterprises Group LLC.
Does 78-13 31 Avenue have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 78-13 31 Avenue rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 78-13 31 Avenue built?
City records list 2004 as the year it was built.
How many apartments are in 78-13 31 Avenue?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.