32-73 42 Street
Queens, NY 11103BBL 4-00690-0010Map
Owner of record: Alambra LLC
32-73 42 Street is a walk-up apartment building built in 1927 in Queens, 11103. It has 24 residential units across 5 floors. The owner of record is Alambra LLC. HPD has recorded 47 housing violations here, most recently on September 27, 2026. 14 of the 47 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 47
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- BHazardous
Replace the broken or defective water closet in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Sep 27, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories and its components at building front at fire escape
Jun 9, 2026
Open — Nov certified on time - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than thirty square feet at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 7, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 7, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 7, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door latch at building front entrance door , 1st story
Sep 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door latch at building front entrance door from street , 1st story
Sep 24, 2025
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at the shower in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jun 17, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system at the east wall. in the foyer located at apt 4a, 4th story, 1st apartment from east at south
Jun 17, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jun 17, 2024 · Apt 4A
Closed — Violation dismissed
Show 37 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at the 1st and 2nd window frames from east at the south wall. in the 4th room from north located at apt 4a, 4th story, 1st apartment from east at south
Jun 17, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Mar 27, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Mar 27, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Replace with new the missing ceramic tiles at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Mar 27, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Sep 13, 2023 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Sep 13, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Sep 13, 2023 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Sep 13, 2023 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in vestibule at public hall, 1st story
Sep 13, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling in vestibule at public hall, 1st story
Sep 13, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at east and south walls in the kitchen located at apt 1awood, 1st story, 1st apartment from west at north
Mar 25, 2023 · Apt 1AWOOD
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wod floor in the 3rd room from east at south located at apt 1awood, 1st story, 1st apartment from west at north
Mar 25, 2023 · Apt 1AWOOD
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at walls in the 3rd room from east at south located at apt 1awood, 1st story, 1st apartment from west at north
Mar 25, 2023 · Apt 1AWOOD
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd room from east located at apt 1awood, 1st story, 1st apartment from west at north
Mar 25, 2023 · Apt 1AWOOD
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at walls in the 2nd room from east located at apt 1awood, 1st story, 1st apartment from west at north
Mar 25, 2023 · Apt 1AWOOD
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, west wall in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from west at north wall in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from south at west wall wall, 1st closet from south at west wall baseboard, 2nd door frame from west at north wall, 1st door frame from east at south wall, north wall, south wall, east wall in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. 1st closet from west at north wall door frame, 1st closet from west at north wall wall in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. ceiling in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation .. 1st riser from west at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. ceiling, north wall, south wall, west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood paneling at all walls in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood paneling at all walls in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Feb 11, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Jan 22, 2015 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the 2nd room from east located at apt 2d, 2nd story, 1st apartment from south at west
Jan 22, 2015 · Apt 2D
Closed — Violation dismissed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 15, 2015
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to comply w/commissioner's order contained in summons/v35502731l issued 6/9/21 &to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain bldg in codecompliant manner.comply w/commissioner's order
Oct 23, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#2,stucco,crack,bulge & falling down exposing the brick facade & creating a hazardous condition. remedy: maintain the exterior wall.
Jun 9, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to institute&maintain safety measures note:@time of my insp ofexisting&occupied 5stybldg,i observed exterior coating wall(stucco) falling apart on walkway@exp2(for approx5mths).i also observed on access
Mar 22, 2021
Resolve - Class - 1
Failure to maintain bldg wall or appurtenances.note:@time of my insp of existing&occupied 5stybldg,i observed exterior coating wall(stucco)presenting major cracks&falling apart@exp2,creating hazardous condition
Mar 22, 2021
Resolve - Class - 2
Work w/o a permit. at time of inspection observed at 2nd fl level apt 2d active plumbing work in progress at bathroom area.(cast iron tub replaced w/new steel tub,shower body water supply & drainage all new &
Apr 13, 2015 · Penalty $800
Resolve
Complaints
- Plumbing
Toilet
Aug 31, 2026 · Apt 3E
Close - Plumbing
Toilet
Aug 29, 2026 · Apt 1D
Close - Plumbing
Toilet
Aug 29, 2026 · Apt 1D
Close - General
Mailbox
Aug 18, 2026 · Apt 1D
Close - Plumbing
Bathtub/shower
Jun 8, 2026 · Apt 1D
Close - Plumbing
Water supply
Jun 8, 2026 · Apt 1D
Close - Unsanitary condition
Pests
May 14, 2026 · Apt 1D
Open - Unsanitary condition
Mold
Mar 31, 2026 · Apt 3B
Close - Electric
No lighting
Mar 31, 2026 · Apt 3B
Close - Paint/plaster
Wall
Mar 31, 2026 · Apt 3B
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Mar 31, 2026 · Apt 3B
Close - Paint/plaster
Wall
Jan 5, 2026 · Apt 3B
Close - Water leak
Slow leak
Jan 5, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jan 5, 2026 · Apt 3B
Close - Outside building
Roofing
Dec 29, 2025 · Apt 5A
Close - Door/window
Door
Sep 15, 2025 · Apt 1STFLO
Close - Paint/plaster
Wall
Jun 24, 2025 · Apt 1B
Close - Plumbing
Toilet
Jun 2, 2025 · Apt 5B
Close - Unsanitary condition
Sewage
Jun 2, 2025 · Apt 5B
Close - Plumbing
Water supply
Apr 17, 2025 · Apt 3C
Close - Door/window
Door
Feb 25, 2025 · Apt 1D
Close - Paint/plaster
Wall
Mar 23, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Mar 23, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Mar 23, 2024 · Apt 1A
Close - Electric
Outlet/switch
Mar 23, 2024 · Apt 1A
Close - Paint/plaster
Wall
Mar 23, 2024 · Apt 1A
Close - Door/window
Window frame
Jan 11, 2024 · Apt 4A
Close - Water leak
Slow leak
Jan 11, 2024 · Apt 4A
Close - Plumbing
Radiator
Nov 16, 2023 · Apt 2C
Close - Heat/hot water
Apartment only
Nov 16, 2023 · Apt 2C
Close - Paint/plaster
Ceiling
Nov 16, 2023 · Apt 2C
Close - General
Cooking gas
Oct 16, 2023 · Apt 2A
Close - General
Cooking gas
Aug 28, 2023 · Apt 2A
Close - Safety
Carbon monoxide detector
Mar 16, 2023 · Apt 1AWOOD
Close - Unsanitary condition
Mold
Feb 6, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Feb 3, 2023 · Apt 1A
Close - Paint/plaster
Wall
Feb 3, 2023 · Apt 1A
Close - Paint/plaster
Wall
Feb 3, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Feb 3, 2023 · Apt 1A
Close - Appliance
Refrigerator
Jul 13, 2022 · Apt 1D
Close - Unsanitary condition
Mold
Mar 21, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2018 · Apt 3E
Close - Plumbing
Bathtub/shower
Jul 20, 2016 · Apt 5D
Close - General
Bell/buzzer/intercom
Oct 5, 2015 · Apt 5A
Close - Flooring/stairs
Floor
Jan 9, 2015 · Apt 2D
Close - Flooring/stairs
Floor
Jan 9, 2015 · Apt 2D
Close - Flooring/stairs
Floor
Jan 9, 2015 · Apt 2D
Close - Flooring/stairs
Floor
Jan 9, 2015 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 5
- Residential units
- 24
- Building area
- 14,000 ft²
- Lot area
- 4,000 ft²
- Zoning
- R5
- Community board
- 401
- Council district
- 22
- Block / lot
- 690 / 10
- Assessed value
- $595,350
- Landmark / historic district
- No
HPD registration #401153, last renewed Jun 25, 2026.
Questions about 32-73 42 Street
Who owns 32-73 42 Street?
The owner of record in NYC Department of City Planning PLUTO data is Alambra LLC.
Does 32-73 42 Street have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 32-73 42 Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 100% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 32-73 42 Street built?
City records list 1927 as the year it was built.
How many apartments are in 32-73 42 Street?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.