32-76 42 Street
Queens, NY 11103BBL 4-00677-0070Map
Owner of record: Ginestri Equities, LLC
32-76 42 Street is a walk-up apartment building built in 1937 in Queens, 11103. It has 40 residential units across 4 floors. The owner of record is Ginestri Equities, LLC. HPD has recorded 21 housing violations here, most recently on January 15, 2025. 13 of the 21 most recent violations are still open. City tax records listed 40 rent-stabilized apartments here in 2024.
- HPD violations
- 21
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north at east located at apt a2, 1st story, 1st apartment from west at north
Jan 15, 2025 · Apt A2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm on building entrance door leading to vestibule area at public hall, 1st story, section ''32-76''
Jan 15, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane on transom building entrance door at public hall, 1st story, section ''32-76''
Jan 15, 2025
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at vestibule at public hall, 1st story, section ''32-76''
Jan 15, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door leading to cellar , section ''32-82''
Jan 15, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door leading to boiler room at cellar , section ''32-82''
Jan 15, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a2, 1st story, 1st apartment from south at west
Jan 17, 2024 · Apt A2
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jan 17, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2022
Closed — Violation dismissed
Show 11 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 13, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 30, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 2, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 26, 2015
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st radiator from east at south wall in the 1st room from east at south located at apt d4, 4th story, 1st apartment from east at south
Jul 5, 2009 · Apt D4
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 1st room from east at south located at apt d4, 4th story, 1st apartment from east at south
Jul 5, 2009 · Apt D4
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from west at north wall in the foyer located at apt d4, 4th story, 1st apartment from east at south
Jul 5, 2009 · Apt D4
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt d4, 4th story, 1st apartment from east at south
Jul 5, 2009 · Apt D4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over entire room located at apt d4, 4th story, 2nd apartment from east at south
Jun 23, 2009 · Apt D4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked at center court yard.
Mar 10, 1999
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked at center court yard.
Mar 10, 1999
Open — Nov sent out
DOB building violations · 4
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 3
- Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept. of building records indicate premises to be legally approved for (20) families.residence is now altered
Sep 4, 2004 · Penalty $2,350
Resolve - Hazardous
Work without permit. work noted: at cellar level erected partitions for (3) rooms and installed water and waste lines for a (3) piece bathroom (toilet, sink, shower) and residential sink with gas line for stove
Sep 4, 2004 · Penalty $800
Resolve - Non-hazardous
25b-fix leak on nipple of return into boiler.
Aug 27, 1998
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 13, 2025 · Apt A2
Close - Heat/hot water
Apartment only
Oct 18, 2024 · Apt A2
Close - Heat/hot water
Entire building
Jan 19, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt A2
Close - Heat/hot water
Entire building
Oct 28, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2020 · Apt D1
Close - Heat/hot water
Entire building
Feb 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2017 · Apt BLDG
Close
Show 25 more ↓
- Heating
Heat related
Jan 3, 2014 · Apt A1
Close - Heating
Heat related
Nov 14, 2013 · Apt NA
Close - Heating
Heat related
Nov 13, 2013 · Apt C4
Close - Heating
Heat related
Jan 31, 2012 · Apt BLDG
Close - Heating
Heat related
Feb 27, 2011 · Apt A1
Close - Heating
Heat related
Jan 31, 2010 · Apt BLDG
Close - Heating
Heat related
Jan 4, 2010 · Apt BLDG
Close - Heating
Heat related
Jan 4, 2010 · Apt BLDG
Close - Heating
Heat related
Dec 29, 2009 · Apt D4
Close - Heating
Heat related
Dec 26, 2009 · Apt BLDG
Close - Nonconst
Vermin
Dec 3, 2009 · Apt C3
Close - Heating
Heat related
Oct 15, 2009 · Apt BLDG
Close - Heating
Heat related
Oct 13, 2009 · Apt A1
Close - Nonconst
Vermin
Aug 20, 2009 · Apt D4
Close - Plumbing
Water-leaks
Jun 12, 2009 · Apt D4
Close - Heating
Heat related
Dec 24, 2008 · Apt D4
Close - Heating
Heat related
Dec 17, 2008 · Apt D4
Close - Heating
Heat related
Oct 30, 2007 · Apt BLDG
Close - Heating
Heat related
Jan 17, 2007 · Apt BLDG
Close - Heating
Heat related
Jan 17, 2007 · Apt BLDG
Close - Nonconst
Vermin
Jul 5, 2006 · Apt D4
Close - Heating
Heat related
Apr 14, 2005 · Apt BLDG
Close - Heating
Heat related
Apr 13, 2005 · Apt BLDG
Close - Heating
Heat related
Dec 24, 2004 · Apt BLDG
Close - Nonconst
Illegal
Jul 16, 2004 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1937
- Floors
- 4
- Residential units
- 40
- Building area
- 26,800 ft²
- Lot area
- 10,000 ft²
- Zoning
- R5
- Community board
- 401
- Council district
- 22
- Block / lot
- 677 / 70
- Assessed value
- $1,329,300
- Landmark / historic district
- No
HPD registration #400652, last renewed Sep 5, 2025.
Questions about 32-76 42 Street
Who owns 32-76 42 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ginestri Equities, LLC.
Does 32-76 42 Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 32-76 42 Street rent stabilized?
NYC Department of Finance tax bills listed 40 rent-stabilized units here in 2024 (about 100% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 32-76 42 Street built?
City records list 1937 as the year it was built.
How many apartments are in 32-76 42 Street?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.