roofy

35-48 Steinway Street

Queens, NY 11101BBL 4-00668-0038Map

Owner of record: Eera Properties, LLC

35-48 Steinway Street is a walk-up apartment building built in 1912 in Queens, 11101. It has 20 residential units across 4 floors. The owner of record is Eera Properties, LLC. HPD has recorded 185 housing violations here, most recently on April 19, 2026. 34 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.

HPD violations
185
DOB violations
0
ECB violations
2
HPD complaints
369

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
15
About 75% of the building's 20 apartments
Down from 18 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 185

  • B

    Properly repair or replace the broken or defective door lock assembly at building door in the entrance located at apt 15, 3rd story, 2nd apartment from east at south

    Apr 19, 2026 · Apt 15

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 2nd room from east at south, the 1st room from east at north located at apt 10, 2nd story, 2nd apartment from east at south

    Jan 8, 2026 · Apt 10

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 1st story, 1st apartment from west at north

    Feb 4, 2025 · Apt 3

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3, 1st story, 1st apartment from west at north

    Feb 4, 2025 · Apt 3

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at south yard door at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges and door leading to south yard at public hall, 1st story

    Dec 12, 2024

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of range and household items at public hall, 3rd story

    Dec 12, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges and latch on door in the entrance located at apt 15, 3rd story, 2nd apartment from north at east

    Dec 12, 2024 · Apt 15

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective pilot light gas range in the kitchen located at apt 15, 3rd story, 2nd apartment from north at east

    Dec 12, 2024 · Apt 15

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch assembly on door in the entrance located at apt 15, 3rd story, 2nd apartment from north at east

    Dec 12, 2024 · Apt 15

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system in the cellar at boiler room

    Nov 28, 2024

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective door to room in the 2nd room from north at east located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective window frame in the 2nd room from north at east located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the bathroom located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak on east wall window frame in the 2nd room from north at east located at apt 10, 2nd story, 2nd apartment from north at east

    Nov 28, 2024 · Apt 10

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 7, 2nd story, 2nd apartment from west at north

    Nov 11, 2024 · Apt 7

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 7, 2nd story, 2nd apartment from west at north

    Nov 11, 2024 · Apt 7

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 20, 2024 · Apt 15

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water temperature exceeding the required maximum of 130 degrees fahrenheit in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 20, 2024 · Apt 15

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water temperature exceeds the required maximum of 130 degrees fahrenheit in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 11, 2024 · Apt 15

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 11, 2024 · Apt 15

    Open — Invalid certification
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 11, 2024 · Apt 15

    Open — Invalid certification
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 11, 2024 · Apt 15

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing consisting of nut and bolt at east wall and rope tie at building front entrance door , 1st story

    Oct 3, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 3, 2024

    Open — Invalid certification
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum allowed temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Oct 3, 2024 · Apt 15

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective locking device at building entrance door , 1st story

    Apr 15, 2024

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak ceiling in the foyer located at apt 15, 3rd story, 2nd apartment from east at south

    Apr 12, 2024 · Apt 15

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the foyer located at apt 15, 3rd story, 2nd apartment from east at south

    Apr 12, 2024 · Apt 15

    Open — Invalid certification
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchen located at apt 15, 3rd story, 2nd apartment from east at south

    Apr 12, 2024 · Apt 15

    Open — Invalid certification
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Mar 11, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Mar 11, 2024 · Apt 15

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Mar 11, 2024 · Apt 15

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f degrees at all hot water fixtures in the entire apartment located at apt 15, 3rd story, 2nd apartment from east at south

    Mar 11, 2024 · Apt 15

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective apartment entrance door hinges in the entrance located at apt 15, 3rd story, 2nd apartment from east at south

    Mar 11, 2024 · Apt 15

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Hazardous

    Occupancy is contrary to that allowed by the certificate of occupancy or bldg dept records cellar use changed from storage and ordinary use to an apartment. partitions erected with kitchen and bathroom

    Sep 30, 2004 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintian building defect is : six square feet of plaster has collapsed form the ceiling of 2nd floor apt # 9 bedroom remedy : repair ceiling maintian building

    Aug 21, 2002 · Penalty $800

    Active

Complaints

  • Unsanitary condition

    Pests

    May 11, 2026 · Apt 20

    Close
  • Unsanitary condition

    Pests

    May 11, 2026 · Apt 20

    Close
  • Door/window

    Door

    Mar 20, 2026 · Apt 15

    Close
  • Door/window

    Door

    Jan 15, 2026 · Apt 15

    Close
  • Flooring/stairs

    Floor

    Jan 5, 2026 · Apt 10

    Close
  • Plumbing

    Steam pipe/riser

    Jan 5, 2026 · Apt 10

    Close
  • Door/window

    Window frame

    Jan 5, 2026 · Apt 10

    Close
  • Paint/plaster

    Wall

    Jan 5, 2026 · Apt 10

    Close
  • Appliance

    Electric/gas range

    Jan 5, 2026 · Apt 10

    Close
  • Water leak

    Slow leak

    Jan 5, 2026 · Apt 10

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Jan 5, 2026 · Apt 10

    Close
  • Door/window

    Door

    Dec 24, 2025 · Apt 15

    Close
  • Door/window

    Door

    Nov 29, 2025 · Apt 15

    Close
  • Flooring/stairs

    Floor

    Oct 8, 2025 · Apt 7

    Close
  • Plumbing

    Toilet

    Oct 8, 2025 · Apt 7

    Close
  • Plumbing

    Water supply

    Mar 12, 2025 · Apt 18

    Close
  • Plumbing

    Water supply

    Mar 12, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 12, 2025 · Apt 15

    Close
  • Plumbing

    Water supply

    Mar 12, 2025 · Apt 15

    Close
  • Plumbing

    Water supply

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2025 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 6, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 6, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 5, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 3, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2025 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Dec 11, 2024 · Apt 15

    Close
  • Door/window

    Door

    Dec 11, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 26, 2024 · Apt 10

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2024 · Apt 10

    Close
  • Heat/hot water

    Apartment only

    Nov 8, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Oct 29, 2024 · Apt 153RDF

    Close
  • Flooring/stairs

    Floor

    Oct 29, 2024 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Oct 29, 2024 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Oct 29, 2024 · Apt 7

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Oct 24, 2024 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Oct 21, 2024 · Apt 7

    Close
  • Heat/hot water

    Apartment only

    Oct 17, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Oct 10, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Oct 2, 2024 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Oct 2, 2024 · Apt 15

    Close
  • Plumbing

    Basin/sink

    May 20, 2024 · Apt 15

    Close
  • Plumbing

    Basin/sink

    May 20, 2024 · Apt 15

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1912
Floors
4
Residential units
20
Building area
12,800 ft²
Lot area
4,500 ft²
Zoning
M1-4/R7A
Community board
401
Council district
26
Block / lot
668 / 38
Assessed value
$631,350
Landmark / historic district
No

HPD registration #413048, last renewed Jul 21, 2026.

Questions about 35-48 Steinway Street

Who owns 35-48 Steinway Street?

The owner of record in NYC Department of City Planning PLUTO data is Eera Properties, LLC.

Does 35-48 Steinway Street have violations?

Yes. NYC HPD has recorded 185 housing violations at this property.

Is 35-48 Steinway Street rent stabilized?

NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 75% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 35-48 Steinway Street built?

City records list 1912 as the year it was built.

How many apartments are in 35-48 Steinway Street?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.