8-01 Astoria Boulevard
Queens, NY 11102BBL 4-00509-0030Map
Owner of record: Tejada, Luis
8-01 Astoria Boulevard is a mixed residential and retail building built in 1916 in Queens, 11102. It has 3 residential units across 3 floors. The owner of record is Tejada, Luis. HPD has recorded 11 housing violations here, most recently on November 1, 2004. 11 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 21
- ECB violations
- 10
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 2r, 2nd story
Nov 1, 2004 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 2r, 2nd story
Nov 1, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling in the private hallway located at apt 2r, 2nd story
Nov 1, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the private hallway located at apt 2r, 2nd story
Nov 1, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story
Nov 1, 2004 · Apt 2R
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall
Nov 1, 2004
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl & tank in the bathroom located at apt 2fl, 2nd story
Apr 28, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing ceramic floor tiles in the bathroom located at apt 2fl, 2nd story
Apr 28, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at closet in the 1st room from north located at apt 2fl, 2nd story
Apr 28, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2fl, 2nd story
Apr 28, 2003 · Apt 2FL
Open — Nov sent out
Show 1 more ↓
- BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the foyer located at apt 2fl, 2nd story
Apr 28, 2003 · Apt 2FL
Open — Nov sent out
DOB building violations · 21
- Construction other optional
The department of buildings intent to revoke the approval and permit issued in connection with application # q01172840-i1 due to special inspector withdrawal. stop all work and make site safe.
Nov 20, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 14, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 11 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 10
- Class - 2
Failure to comply with the commissioners order contained in summons/violation #35372382j issued on 11/08/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bl
Dec 20, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35348725m issued on 08/14/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for: work w/o a permit. remedy: comply w/comm's order &/or file
Nov 26, 2018 · Penalty $12,500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances.noted:at exp #1 and exp #2.hairline cracks visible throughout facade.photos taken.rem:make accessory repairs.obtain all the required permits
Nov 8, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35348725m issued on 08/14/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit. remedy: comply w/comm's order &/or file a c
Oct 10, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building walls and appurtenances. at exposure 1,2,and 4 hairline cracks and stop cracks visible through facade. remedy: maintain exterior building walls
Sep 18, 2018 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit. noted: store front wall under the front glass is demolished & constructed again w/brick w/o proper support to the structure above wall is approx 2'high 20'long on astoria blvd side & 10'long
Aug 14, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to maintain blg wall(s) or appurtenances. noted: at exp2 (left side) between 2nd and 3rd floor windows at west side of wall hairline cracks appear also noted above 3rd flr window at right corner large
Aug 7, 2018 · Penalty $6,250
Resolve - Class - 2
As per class 1 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
May 9, 2017 · Penalty $2,500
Active - Class - 1
B101 found pennco gas fired steam boiler installed w/o a permit. obtain proper permit and submit the certificate of correction.
May 9, 2017 · Penalty $8,000
Active - Class - 2
4a,5a,15,16,24b,34,36,38,48a,50. b254. 36-found pennco gas fired boiler unregistered. 50a-wrong support material on flue pipe; b-no discharge pipe on water heater; c-relief valve on water heater no good; d-no
May 9, 2017 · Penalty $2,500
Active
Complaints
- Nonconst
Vermin
Dec 5, 2007 · Apt 3S
Close - Heating
Heat related
Dec 5, 2007 · Apt 3S
Close - Nonconst
Vermin
Feb 21, 2006 · Apt 2R
Close - Nonconst
Vermin
Feb 21, 2006 · Apt 2R
Close - Nonconst
Vermin
Feb 21, 2006 · Apt 2R
Close - Plumbing
Water-leaks
Feb 21, 2006 · Apt 2R
Close - General
Floor
Feb 21, 2006 · Apt 2R
Close - Plumbing
Bathtub/shower
Feb 21, 2006 · Apt 2R
Close - General
Windows
Feb 21, 2006 · Apt 2R
Close - General
Windows
Feb 21, 2006 · Apt 2R
Close
Show 10 more ↓
- Paint/plaster
Ceiling
Oct 28, 2004 · Apt 2R
Close - Nonconst
Vermin
Sep 29, 2004 · Apt 2R
Close - Paint/plaster
Ceiling
Sep 29, 2004 · Apt 2R
Close - Plumbing
Water-leaks
Sep 29, 2004 · Apt 2R
Close - Plumbing
Water-leaks
Sep 29, 2004 · Apt 2R
Close - Nonconst
Vermin
Sep 29, 2004 · Apt 2R
Close - Nonconst
Vermin
Sep 29, 2004 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 14, 2003 · Apt 2FL
Close - Paint/plaster
Wall
Apr 14, 2003 · Apt 2FL
Close - Plumbing
Toilet
Apr 14, 2003 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1916
- Floors
- 3
- Residential units
- 3
- Building area
- 4,375 ft²
- Lot area
- 1,875 ft²
- Zoning
- R6A
- Community board
- 401
- Council district
- 22
- Block / lot
- 509 / 30
- Assessed value
- $619,200
- Landmark / historic district
- No
Questions about 8-01 Astoria Boulevard
Who owns 8-01 Astoria Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Tejada, Luis.
Does 8-01 Astoria Boulevard have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 8-01 Astoria Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 8-01 Astoria Boulevard built?
City records list 1916 as the year it was built.
How many apartments are in 8-01 Astoria Boulevard?
It has 3 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.